Korean Journal of Construction Engineering and Management
/
v.5
no.6
s.22
/
pp.170-178
/
2004
Public construction companies have strictly followed a rule that they should not work in the wet area such as structural frame for a certain period during the winter season. It is usually known that the non-working period during the winter causes increase of the project duration, and the project cost escalation. Also, it makes negative effects on national economy because it reduces workers income. Therefore, the site work for the structural frame should be performed even during the whiter season. But the site work for the structural frame during that period cannot proceeds in the same way as during other periods, and requires a different method for estimating project duration. Through an analysis of time scheduling mechanism, actual working days are obtained for 1 cycle of typical floors in the structural frame during these periods, and non-working days of 5 years average are calculated based on calendar day using data of 5 years weather forecasts for that season. This study proposes an optimized way of estimating project duration for 1 cycle of typical floors in the structural frame during these periods. This estimating method uses the combined actual working days and non-working days of 5 years' average, and the estimated results are confirmed by being compared with field data. This study is expected to be used in estimating the construction duration of the structural frame during the winter season.
Korean Journal of Construction Engineering and Management
/
v.7
no.4
s.32
/
pp.100-108
/
2006
Non-working days affected by weather conditions of the construction-sites have been estimated without proper data. They are usually estimated based on project engineer's own experience and intuition. As a result, they cause not only economic loss to time-adjustment but also conflicts among project participants. It becomes more difficult to predict the weather nowadays than before due to tendency of recently weather change. Therefore, this paper presents an improved estimation method for non-working days, which could minimize estimation errors. The estimation method is developed based on analysis of regional characteristics and weather conditions which affect project duration.
Korean Journal of Construction Engineering and Management
/
v.7
no.4
s.32
/
pp.137-145
/
2006
Calculating non-working days is very important element for the accurate estimation of construction time. And non-working days are largely affected by weather factors such as rainfall, wind velocity, snowfall and temperature. In the case of concrete works, there are lots of referable information for the calculation of non-working days due to the weather factors. However, for the structural steel works, there are very limited information only. Through literature survey and interviews with a few engineers, this paper established the weather factors that affect steel structural works and the impact of those factors. Based on the factors and the expected impact of the factors together with the weather data during the last 15 years in Seoul region gathered from Korea Meteorological Administration, this paper suggests the monthly non-working day of structural steel work due to weather factors. This information can be used for the early estimation of construction time.
Korean Journal of Construction Engineering and Management
/
v.1
no.4
s.4
/
pp.74-81
/
2000
The duration of construction in the construction works contains non-working days as well as working days. The duration is so relevant to climate that it should be calculated after fully considered about the regional climate in which construction processes. In most construction fields, however, there has been a frequent adjustment of duration because the field supervisor's experiences have decided non-working days indiscriminately without any accurate information about weather. Not only has that done great economic damages, but also caused many problems in interests among construction subject. So, in this study, we will analyse the elements of climate which has influences on the duration and implement the hypothetical weather simulation. By connecting the results of simulation with the duration of construction, we will propose the decision-making support model for the efficient calculation of duration when the field supervisor makes the projects schedule.
Kim, Chang-Won;Kim, Baek-Joong;Cho, Hunhee;Kang, Kyung-In
Proceedings of the Korean Institute of Building Construction Conference
/
2011.11a
/
pp.131-132
/
2011
Non-working days owing to climatic factors have been negatively affected in productivity of construction, such as delays of project completion times, decrease productivity of construction. Especially non-working days of steel erection work is about 58 days, it is influenced deleteriously to estimating uncertain construction duration. To solve this problem, Construction Factory(CF) and sliding roof system installed CF's upper side are developed in korea recently. This study is proposed the design of sliding roof system through assess relation of requirements and technical characteristics using Quality Function Deployment(QFD). The basis data for applying QFD is collected from literature reviews and questionnaires/interviews targeting system developer, experts and researchers.
NGUYEN, Anh Huu;PHAM, Huong Thanh;NGUYEN, Hang Thu
The Journal of Asian Finance, Economics and Business
/
v.7
no.3
/
pp.115-125
/
2020
This paper investigates the impact of working capital management on the firm's profitability. The research sample includes 119 non-financial listed companies on Vietnam stock market over a period of 9 years from 2010 to 2018. Two statistical approaches include Ordinary least squares (OLS) and fixed effects model (FEM) are employed to address econometric issues and to improve the accuracy of the regression coefficients. The empirical results show the negative and significant impacts of the working capital management, which measured by cash conversion cycle (CCC) and three components of the CCC including accounts receivable turnover in days (ARD), inventory turnover in days (INVD), and accounts payable turnover in days (APD) on the firm's profitability measured by return on assets (ROA) and Tobin's Q. It implies that firms can increase profitability by keeping the optimization of the working capital management measured by the CCC, which includes shortening the time to collect money from clients, accelerating inventory flow and hold the low payment time to creditors. Besides, the profitability of firms was impacted by the sale growth rate, firm size, leverage, and age. Therefore, this paper provides a new insight to managers on how to improve the firm's profitability with working capital management.
Kim, Beop-su;Bang, Hong-soon;Choi, Byung-Ju;Kim, Ok-kyue
Korean Journal of Construction Engineering and Management
/
v.19
no.5
/
pp.61-69
/
2018
Construction projects consist of long-term on-site production, and most disciplines are featured by outdoor works. Therefore, when a process plan is established, non-working days are calculated and reflected in a process schedule to comply with the planned construction period. However, necessary information and working methods are different in the course of the work, so the method of calculation varies depending on persons even for the same site, and the result is also very different. Therefore, scientific and quantitative understanding of business information is needed. This study reconstructed non-working day estimation process by collecting and organizing the information necessary for non-working day estimation, and designed the demonstration screen based on the reconstructed process and verified through expert interview at each stage. As a result, it showed about 69% reduction of work time and reliability of 92% work information matrix, and 80% of the experts evaluated the systemization of the relevant work. This study is expected to improve the understanding of work and increase the efficiency of work performance, and the study on systemization in the future should be continued.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2003.05a
/
pp.532-535
/
2003
Vibration of rotating machinery is a factor that is something to do with abnormal machinery. Former days, Perception of vibration at rotating machinery had used Shaft rider type. Shaft rider type was adhered to surface of shaft and detected vibration of rotating machinery. Recently, Perception of vibration at rotating machinery uses to non-contact sensor. Working principle of non-contact sensor is used of eddy current. Vibration at rotating machinery appears to deviation of eddy current. In this paper, We investigate abnormal vibration due to non-contact sensor.
I estimate the non-market effects of implementing five-day workweek controlling for the individual-job fixed effect. I find that the implementation of five-day workweek has improved an individual's subjective health status, increased the frequency of exercises, increased the probability to get education or training other than job training, improved subjective quality of life, increased spending for leisure and cultural activities, and improved an individual's satisfaction with the job and the employer. Much of the effects are due to reduction not of working hours but of working days.
Korean Journal of Construction Engineering and Management
/
v.5
no.6
s.22
/
pp.138-145
/
2004
The construction duration for any building or facilities such as high school building influence the quality of the building as well as the total cost for them. Since there are no guidelines to estimate construction duration correctly, an employer(or owner) estimate it by their own experience or intuition. Therefore some conflicts related to construction duration happen between contract parties during construction. The purpose of this study is to suggest a predictive model which helps decision makers calculate exact net working days for high school building construction at the early stage of the construction project. To measure net working days for high school construction, 15 data were collected from actual spot in Incheon region. Multiple linear regression analysis was conducted to obtain the model which calculate construction duration for the substructure, the superstructure and the finishing works. total construction duration could be obtained by adding net working days to non working days which would be based on the meteorological statistics for Incheon region since 1974 to 2003.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.