• 제목/요약/키워드: Model construction

검색결과 8,602건 처리시간 0.032초

적산온도를 활용한 강도예측모델의 건설생산현장 적용성 검토에 관한 연구 (A Study on the Investigation of Application in Construction Field of Strength Prediction Model using Maturity Method)

  • 주지현;장종호;김재환;길배수;남재현;김무한
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2004년도 학술.기술논문발표회
    • /
    • pp.101-104
    • /
    • 2004
  • If predicting of compressive strength of construction in construction field at early age is possibile, rational strength management & schedule plan is possible. With method for predicting strength of concrete, many researchers have been making study of maturity method. On the other hand, nowadays rationalization of construction capacity and reduction of a term of works due to improvement of construction capacity and application of a new method of construction is gathering strength with important issue. In accordance with this present condition, construction is being progressed in winter, but proper construction mothed and countermeasure for strength management is not established in case of winter construction. Therefore to investigate application in construction field at winter of strength prediction model that developed at former study, this study aim to measure application of developed strength prediction model through manufacture of mock-up concrete according to kind of strength level at 5$^{\circ}C$.

  • PDF

원자력 발전설비의 3D 모델 상세화 방안에 대한 기초 연구 (A basic study 3D model advancement method for nuclear power plant)

  • 임병기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.37-38
    • /
    • 2018
  • BIM(Building Information Modeling) in the architecture, VDC(Virtual Design and Construction) defined CIFE(Center for Integrated Facility Engineering) of Stanford university in USA, and Data-driven design definition issued by TECDOC-1284 of IAEA are doing data-level design generated by 3D CAD technology, integrating and managing related information based on the 3D model, and Using 3D models effectively during nuclear power plant life cycle. 3D model of domestic nuclear power industry is using interference review between design fields, 4D system linked 3D construction model and schedule activity, but the 3D model generated in the design phase is effectively not utilized during the construction, operation, decommissioning. therefore, This study is aimed to suggest 3D model LOD(Level of Detail) advancement method through the analysis of existing literature, 2D drawings, and 3D models throughout nuclear power plant lifecycle.

  • PDF

PERFORMANCE EVALUATION FOR CONSTRUCTION VALUE ENGINEERING STUDY

  • Wei Tong Chen;Hong-Long Chen;Po-Yi Chang;Tsang-Jung Wang
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.347-352
    • /
    • 2005
  • This paper presents an evaluation model for the performance of Value Engineering Study (VES) for construction projects. The proposed model consists of 6 PEGs and 32 PEIs. The expertise of the proposed model was collected from VE experts in Taiwan using two-phase questionnaire survey. One real-life VES of construction projects was used to demonstrate how the proposed model works. The proposed model not only can be used by project owners to appraise the performance of VES team but also be used by the VES teams to conduct self-diagnosis, improvement, and motivation for achieving better performance. Additionally, the proposed model is capable of: (1) clarifying the defects of VES and avoiding committing same mistakes, (2) assisting inexperience team members to implement VES and catch the critical issues of a VES.

  • PDF

인공신경망 모델 구축을 통한 건설장비별 이산화탄소 배출량 예측 (Development of Artificial Neural Network Model for Predicting Carbon Dioxide Emissions by Construction Equipment)

  • 임소민;노상우;김하윤;이민우;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.16-17
    • /
    • 2020
  • In this paper, we intended to present a model for estimating carbon dioxide emissions by work of construction equipment using Artificial Neural Network(ANN) analysis. In this study, data of excavators and trucks are classified according to the work carried out, and carbon dioxide emissions are predicted through ANN based on equipment information and work information. As a result, the effect of each model was validated, and a carbon dioxide emission prediction model was derived for each work. This has the expected effect of establishig an eco-friendly process plan using this model from the construction planning stage.

  • PDF

건설장비 가이던스 시스템 도입을 위한 비즈니스 모델 효과 (Effectiveness of a Business Model for Adopting a Construction Machine Guidance System)

  • 문성우
    • 한국BIM학회 논문집
    • /
    • 제8권1호
    • /
    • pp.24-32
    • /
    • 2018
  • A construction machine guidance system is an assistance system that helps construction equipment operators dig grounds during excavation work at a construction site. This system has long been applied in the overseas countries of the United States, Japan and Europe. However, the system has not been paid much attention in Korea. The objective of this paper is to present a business model for adopting construction machine guidance systems in Korea and evaluate the effectiveness of applying the system to excavation work. The business model in this study shows a new process of applying construction machine guidance system, business stakeholders and revenues, and suggests the benefits to the business stakeholders. A field test of the construction machine guidance system proves that the system can be applied as a tool that can improve the productivity of excavation work. This productivity improvement consequently demonstrates that the business model in this study is a prospective challenge in improving the effectiveness of excavation work at the construction site.

건축공사감리 문서 기반 연관규칙 및 비용효율성 분석 모델 (A Study on Association Rule and Cost Efficiency Analysis Model Using Construction Supervision Reports)

  • 송태근;유위성
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.389-390
    • /
    • 2023
  • To improve the cost performance of construction sites, various systems and standards are constantly being developed and implemented. Although legal requirements for these system and standard improvements have been increasing, the cost efficiency performance of construction sites remains stagnant. We have digitized documents generated through construction supervision work at 39 building construction sites and proposed a model that can support decision-making in cost efficiency evaluation. This model selects key keywords that are considered to be highly related to cost efficiency by identifying the patterns and relationships of keywords through associated rule analysis and social network analysis using keywords derived from documents. In addition, it is expected to be used as a decision-making aid to determine the cost efficiency of a specific building construction site by establishing a logistic regression model using core keywords. As a systematic database of construction supervision documents and an integrated system of massive data generated by digital technology are established in the future, the accuracy and reliability of the cost efficiency evaluation model are expected to be reinforced.

  • PDF

원자력 발전 플랜트 RCB 시공의 리스크 요인에 관한 분석 모델 (Analysis Model on Risk Factors of RCB Construction in Nuclear Power Plant)

  • 신대웅;신윤석;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.212-213
    • /
    • 2014
  • The purpose of this study is to suggest analysis model of RCB construction in nuclear power plant. For the objective, This study drew the risk factors of RCB construction from existing literature. The results of the study proposed analysis model made hierarchy in rebar, form, and concrete work. These will be baseline data for risk management in construction project of nuclear power plant.

  • PDF

소리의 전달 모형구성 수업에서 나타난 개인모형 구성 단계 중 정보의 흐름과 모둠모형 구성의 유형 (Information Flow During Individual Model Construction and Group Model Construction Type in the Sound Propagation Model Co-Construction Class)

  • 박정우;유준희
    • 한국과학교육학회지
    • /
    • 제38권3호
    • /
    • pp.393-405
    • /
    • 2018
  • 본 연구에서는 소리의 전달에 대해 개인모형 구성과 모둠모형 구성이 혼합된 수업 전략의 실행에서 나타나는 실제 교실 상황에서의 모둠모형 구성 유형을 분류하고 각 유형별 정보의 흐름을 분석하여 실제 교실 환경에서 모형의 공동 구성을 위한 시사점을 얻고자 하였다. 서울 소재 남녀 공학 중학교 2학년 1개 학급의 33명을 대상으로 소리전달에 대한 2차시 수업이 진행되었고 총 65개의 개인모형과 16개의 모둠모형 구성 과정이 분석되었다. 모둠모형 구성 유형은 정체형(Unchanged), 열거형(Enumerated), 정교형(Elaborated)으로 분류하였다. 정체형(Unchanged) 구성은 8개 모둠, 열거형(Enumerated) 구성은 3개 모둠, 정교형(Elaborated) 구성은 5개 모둠에서 나타났다. 정체형과 나열형 구성에서는 정보의 1차 전파자이며 개인 모형의 독자적 구성자(i.I)가 모둠모형에 기여하는 경우가 많이 나타났다(각 50.0%, 54.5%). 정체형 구성에서는 1명의 정보가 모둠원 전체에게 전달되는 방사형 흐름이 나타났으며, 나열형 구성에서는 정보 전파의 시작점이 두 군데에서 나타났다. 정교형 구성에서는 모둠 내 정보의 흐름이 선형으로 전달되는 '전달형' 흐름이 나타났으며, 정보의 2차 전파자이며 반성적 구성자(2d.R)가 모둠모형에 기여한 경우가 두드러지게 나타났다(58.3%). 본 연구는 이상적인 상황이 아닌 실제 교실 맥락에서 나타나는 복잡한 모형구성 과정을 이해할 수 있는 하나의 관점을 제안하였으며 이를 통한 실질적이고 구체적인 전략을 제안하였다. 본 연구의 결과는 한국 소집단 문화의 특징을 고려한 모형구성 전략의 필요성을 제안하며, 추후 연구를 통해 풍부한 논의가 진행될 수 있을 것으로 기대한다.

공사규모에 따른 공공건축물 공사비의 산정방법 (Cost Estimating Method of Public Building Construction through Construction Scale)

  • 임진호;박준모;김옥규
    • 한국건축시공학회지
    • /
    • 제15권3호
    • /
    • pp.307-316
    • /
    • 2015
  • 공공건축물공사의 실적공사비제도에서 공사규모에 대한 건축공사비 차이가 크게 나타나므로, 산정방식에서 많은 문제점으로 제기된다. 이에 공사규모에 따라서 선별적, 차등적으로 적용할 예측모형의 개발이 필요하다. 이에 본 연구는 조달청에서 2011~2012년에 발주한 이미 준공된 42개 현장의 실적자료에서 공사규모 $5,000m^2{\sim}20,000m^2$으로 선정하여, 회귀분석을 통해서 추정된 모형을 도출하였다. 이를 근거로 신규공사에 적용하여 검증함으로써 합리적인 건축공사비 예측모형을 제시하였다.

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF