• Title/Summary/Keyword: Model Co-construction

Search Result 616, Processing Time 0.026 seconds

Numerical study of stress states near construction joint in two-plate-girder bridge with cast-in-place PC slab

  • Yamaguchi, Eiki;Fukushi, Fumio;Hirayama, Naoki;Kubo, Takemi;Kubo, Yoshinobu
    • Structural Engineering and Mechanics
    • /
    • v.19 no.2
    • /
    • pp.173-184
    • /
    • 2005
  • For reducing construction cost, two-plate-girder bridges are getting popular in Japan. This type of bridge employs a PC slab, which is often cast-in-place. In such a case, concrete is not usually cast over the whole slab at one time: some portions are constructed earlier than the rest. Therefore, a construction joint is inevitably created. Due to the drying shrinkage of concrete, tension stress may occur in concrete slab. High tensile stress can be expected near the construction joint where concretes with different ages meet. Moreover, prestressing is not applied over the whole length of slab at one time. This may also serve as a source of tensile stress in the slab. Thus there is a chance that cast-in-place PC slab, especially near the construction joint, may be subjected to tensile cracking. In the present study, stress states near the construction joint in the cast-in-place PC slab of a two-plate-girder bridge are investigated numerically. The finite element method is employed and the three-dimensional analysis is conducted to see the influence of dry shrinkage and prestressing. The stress states in the PC slab thus obtained are discussed. The simplified model of a plate girder for this class of analysis is also proposed.

The Program Development for Environmental Quality Level and Evaluation of Carbon Dioxide Emission in Construction Works (건설사업의 환경성 및 CO2 배출 평가 프로그램 개발)

  • Lee, Kyoung Hee;Kim, Hyo-Jin;Kwon, Suk-Hyun;Kim, Min-Ji
    • Land and Housing Review
    • /
    • v.3 no.4
    • /
    • pp.399-406
    • /
    • 2012
  • One-third of total energy and 50% of $CO_2$ emissions arise from construction phase. Because of this global amount of energy consumption and $CO_2$ emission, we must do our best to solve this problem. But our existing ways of meeting this problem has focused on the energy consumption saving of the construction and dwelling stage. On the other hand, we has been treated too lightly for handling the $CO_2$ emissions problem during the maintenance management and the demolition process so far,. In this paper, we quantitatively predicted and evaluated the environmental load in each construction step during all life cycle. And, we developed the environmental load assessment program for each construction step. And we proposed the reliable decision support model for objective and reliable environmental load assessment and reduction. This result must help the development of construction technology and low carbon & green growth.

A Study on 3D Geospatial Information Model based Influence Factor Management Application in Earthwork Plan (3차원 지형공간정보모델기반 토공사 계획 및 관리에 미치는 영향요인 관리 애플리케이션 연구)

  • Park, Jae-woo;Yun, Won Gun;Kim, Suk Su;Song, Jae Ho
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.2
    • /
    • pp.125-135
    • /
    • 2019
  • In recent years, the digital transformation age represented by the "Fourth Industrial Revolution", which is a universalization of digitalization across all industries, has become a reality. In the construction sector in 2018, the Ministry of Land, Infrastructure and Transport established the Smart Construction 2025 vision and established the 'Smart Construction Technology Roadmap' aiming to complete construction automation by 2030. Especially, in the construction stage, field monitoring technology using drones is needed to support construction equipment automation and on-site control, and a 3D geospatial information model can be utilized as a base tool for this. The purpose of this study is to investigate the factors affecting earthworks work in order to manage changes in site conditions and improve communication between managers and workers in the earthworks plan, which has a considerable part in terms of construction time and cost as a single type of work. Based on this, field management procedures and applications were developed.

Plan for Construction and Utilization of Knowledge-Service Platform for Supporting Biomimicry Technology Development

  • Seo, Hyunjin;Bae, Haejin;Kim, Sun-Joong;Kim, Jinhee
    • Proceedings of the National Institute of Ecology of the Republic of Korea
    • /
    • v.3 no.3
    • /
    • pp.178-186
    • /
    • 2022
  • In order to support biomimicry technology development, it is necessary to develop an omnidirectional service platform which can recommend principles of biomimicry and business ideas, providing experts' networks and carrying out their relevant education and promotion on the ground of baseline data and application research materials related to biomimicry. This study was conducted to establish any probable plans for construction and utilization of the future open-platform which will collect and serve the technology of biomimicry. Accordingly, biological and ecological information databases were examined along with the appreciation of construction and management of major biomimicry DB, and, based on the materials from the interview of related experts, a customer journey map was schematized. Lastly, in order to suggest a mid-to-long-term target-model, the roles of a future biomimicry knowledge service-platform were determined along with the potential plans for its construction and management based on case analysis and customers' needs.

A CASE STUDY ON INVESTMENT EVALUATION OF A PRIVATE SECTOR PROJECT WITH GEOTECHNICAL RISKS

  • Yoshiki Onoi;Hiroyasu Ohtsu
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.824-829
    • /
    • 2005
  • This paper focuses on construction cost volatility for the purpose of private sector investment by use of a financial model with key indices of IRR and DSCR (Debt Service Coverage Ratio). A case project, 1,000 MW pumped storage hydropower plant, has shown that its financial impacts by cost volatility of underground works are less measured than interest rates impacts by interest rate of loans. Probabilistic analysis of costs under geotechnical conditions has been made by Indicator Kriging method. And, in the modeling of interest rates, geometric Brownian motion has been applied. Both of these impacts are measured on the same financial model.

  • PDF

A Study on Effect of Beachface Gradient on 3-D Currents around the Open Inlet of Submerged Breakwaters (해빈경사에 따른 잠제 개구부의 3차원적인 흐름특성에 관한 연구)

  • Lee, Woo-Dong;Hur, Dong-Soo;Park, Jong-Bae;An, Sung-Wook
    • Journal of Ocean Engineering and Technology
    • /
    • v.23 no.1
    • /
    • pp.7-15
    • /
    • 2009
  • The aim of this study was to survey the effects of the beachface gradient on 3-D currents around the open inlets of submerged breakwaters. First, the numerical model was validated by a comparison with existing experimental data. This model is able to consider the flow through a porous medium with inertial, laminar, and turbulent resistance terms, i.e. simulate directly WAve?Structure?Seabed/Sandy beach interaction, and can determine the eddy viscosity with a LES turbulent model in a 3-Dimensional wave field (LES-WASS-3D). Using the numerical results of this model, the 3-D currents around the open inlets of submerged breakwaters were examined in relation to the beachface gradient. Moreover, the wave height distribution and mean flow around them are also discussed, as well as the distribution of the wave breaking points over the crest.

A Study on Key Factors of Ground Settlement Due to Shield TBM Excavation using Numerical Analysis and Field Measurement Comparison (수치해석과 현장 계측값 비교를 통한 Shield TBM 지표침하 영향요소 검토)

  • Jun, Gychan;Kim, Donghyun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.16 no.1
    • /
    • pp.63-72
    • /
    • 2017
  • This study estimates the degree of influence of factors influencing ground surface settlement during tunnel excavation using Shield tunneling trough 3D FE-analyses. Numerical analysis was carried out by considering face pressure, skinplate pressure, excavation length, soil model, element size and soil material properties. Also, Actually constructed shield TBM comparative analysis was conducted by compared with Volume loss model, Pressure model and field measurement data. Skinplate pressure and soil model were the most influential factors, and the analysis results were similar to field measurements when the appropriate skinplate pressure was applied according to the passing stratum.

Reliability analysis of surface settlement by groundwater drawdown from tunnel excavation (터널굴착시 지하수위저하에 의한 지표침하의 신뢰성 해석)

  • Jang, Yeon-Soo;Kim, Hong-Seong;Park, Jeong-Yong;Park, Joon-Mo;Lee, Seong-Ki
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1426-1433
    • /
    • 2005
  • In this paper, reliability analysis of surface settlement by ground water drawdown is performed using a reliability-groundwater flow numerical model. The result is compared with that of the deterministic model to evaluate the influence of the uncertainty from hydraulic conductivity in the soft ground as well as to determine the range of hydraulic conductivity of grouted ground. From the analyses, it was found that probability of failure to exceed the tolerable settlement was very high, if the hydraulic conductivity of grouted ground is decided from the deterministic flow model only. Reliability analysis which evaluates variance of hydraulic conductivity should be used together with the deterministic model for grouting design of tunnels to prevent ground water drawdown.

  • PDF

Identification of the Relationship Between the Discrete TDCIM and the Discrete PID Controller (이산 TDCIM과 이산 PID 제어기 사이의 관계 규명)

  • Park, Sang Hyun;Jeong, Eui In;Shin, Dong Gwan
    • Journal of Drive and Control
    • /
    • v.14 no.4
    • /
    • pp.23-28
    • /
    • 2017
  • Time-delay control with internal model (TDCIM) is the controller for robot manipulators that applies the time-delay estimation and the concept of internal model control (IMC). TDCIM is robust against unknown dynamics and non-linear friction like coulomb friction and static friction. It is simple and computationally efficient. This study presents the relationship between the discrete TDCIM and the discrete PID controller. The PID controller is the most popular control law in the real application. But often the PID controller can be difficult to achieve the desired level of control performance. The result in this study provides a good candidate solution to these situations.