• Title/Summary/Keyword: Medium-sized Construction Company

Search Result 41, Processing Time 0.024 seconds

A Study on the Methodology to Performance Security on the Korea Small/Medium Sized Construction Firms for Venturing into International Market (국내 중소건설업체의 해외 진출 활성화를 위한 건설 보증 확대 방안에 관한 연구)

  • Ahn, Hyoung-Jun;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.225-229
    • /
    • 2009
  • International construction market has been open to other countries, and it derives the development of our overseas construction industry quantitatively as well as qualitatively. Until now, the major companies have an absolute majority in the overseas construction market, and the small and medium enterprises have had difficulty to get a leadership in the international construction market because of the lack of the technical expertise and the capital strength. Especially in the Middle East Asia, our construction companies has touched off a boom, so our market share also has grown, which derived from the up toward ratchet oil prices and a worldwide boom in real estate development. The small and medium enterprise minority have recognition that the overseas construction market is the major company's native territory. But Data from the existing researches and many statistics indicate the most companies tend to underestimate the capacity and international competitiveness of the small and medium enterprises. As a matter of fact, hundreds of small and medium enterprise cut a conspicuous figure in overseas market. Consequently, it is indispensable to overcome the international financial crisis by revitalizing our overseas construction industry which obtains excellent results in international market. this study suggested the ways to expand overseas bonding capacity of Korean financial institution. This study proposed the Korean government to allow Construction Guarantee (former Korea Construction Financial Cooperative) to deal with foreign exchange so that Construction Guarantee will underwrite the overseas construction bond.

  • PDF

Material Planning Model for Multi-Project Management in Medium-sized Construction Companies (중견건설업체의 다중현장관리를 위한 자재소요계획모델)

  • Jung Sung-Lim;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.598-601
    • /
    • 2003
  • As the scale of construction work is enlarged, complicated and diversified, construction information from the large number of construction sites is happened and reported to the head office. To control much information generated in construction sites simultaneously, the necessity of supporting system which can extract necessary information is increased. However, compare with large companies, medium-sized companies's organization of head office and management system is weak, so it's difficult to manage multi-projects. Among these site managements, resource management is an important management area. But, resource planning is based on experience and judgement and have not associated with schedule information. So when schedule if changed, the plan must be amended manually. This study investigates material-planning model for multi-project management which is connected with daily report system and scheduling software.

  • PDF

Material Planning Model for Multi-Project Management in Medium-sized Construction Companies (중견건설업체의 다중현장관리를 위한 자재조달계획 지원 모델)

  • Jung Sung-Lim;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.106-114
    • /
    • 2004
  • As the scale of construction work is enlarged, complicated and diversified, much construction information from the large number of construction sites is generated and reported to the head office. To control much information generated in construction sites simultaneously, the necessity of supporting system which could extract necessary information is increased. However, comparing with those of large companies, medium-sized companies's organization of head office and management system are weak. So it's difficult to manage multi-projects. Among these site managements, resource management is an important management area. But, resource planning is based on experience and judgement and has not associated with schedule information. So when schedule is changed, the plan must be amended manually. This study investigates material-planning model for multi-project management which is connected with daily report system and scheduling software.

Development of a Web-based Performance Management System using Benchmarking for Small and medium-sized Construction Companies (중소건설기업을 위한 웹 기반 성과관리시스템 구축)

  • Jang, You-Jin;Park, Moon-Seo;Lee, Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.682-685
    • /
    • 2008
  • In globalization and information-oriented society, the domestic construction companies are competing with others in domestic and overseas market. To survive in the age of limitless competition, companies have to manage their performance systematically. However, domestic small and medium-sized companies which are holding a large majority don't have their own Performance Management System(PMS) yet. The purpose of this study is to analyze the existing PMS and to extract key drivers for developing PMS. Through case studies of KPI(UK), NBS(Chile), CII BM&M(USA) and SISIND-NET Project(Brazil), the key drivers are derived. Having these key drivers, this study suggested the conceptual model of PMS using benchmarking for small and medium-sized construction companies.

  • PDF

Improved Approach to ISO 9002 Certification for Small and Medium Construction Company (중소건설업체 ISO 9002 인증추진 절차 개선방안)

  • 이재훈;강창욱
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.19 no.40
    • /
    • pp.351-360
    • /
    • 1996
  • Korean construction companies are now in very difficult situation due to the recent construction accident, opening of domestic market, the advent of boundless competition period in WTO, etc .Introduction of quality management system is quite urgent in order to strengthen our international competitiveness through the superiority of quality and foster the long term growth of organization. Substantially, many companies are proceeding with or completed the introduction of quality management system but small and medium sized construction companies have difficulties due to lack of money and man power. In this paper, five stage procedures, which can be efficiently applied to introduction and operation of qualify management system, have been suggested to help the minor construction companies which want to adopt the quality management system. This study is considered to be helpful for the companies which will introduce quality management system.

  • PDF

An Elective Multi-Project Management for the Small and Medium-sized Construction Companies - Focused on the Planning and Scheduling - (중소건설업체의 다중현장관리를 위한 공사관리업무의 효율화 방안 - 공정관리업무를 중심으로 -)

  • Choi Kwang-Hee;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.504-510
    • /
    • 2002
  • As the Scale of construction work is enlarged, complicated and diversified, construction information from the large number of construction sites is happened at site and reported to the head office. To simultaneously control the individual or large number of sites in large number of construction information, the necessity of making extract the important point of the information and the board of director's making a suitable decision to support the fields is increased. Also, as driving the construction industry to be informative, efficiently aggregating the information created in fields, efficiently making decision and controlling the construction work is increased the importance of the company's competitiveness factor. To simultaneously control multi-construction sites in the small and medium size construction firms define the fundamental and core information factor which needed in the head office and suggest the appling method.

  • PDF

A Study on the Establishment of Smart Factory through the Environmental Factors and Absorption Capacity of Small and Medium Businesses (중소기업의 환경요인과 흡수역량을 통한 Smart Factory 구축 연구)

  • Jin, Sung-Ok;Seo, Young Wook
    • Journal of Convergence for Information Technology
    • /
    • v.9 no.7
    • /
    • pp.67-77
    • /
    • 2019
  • Many small and medium-sized enterprises are deploying Smart Factory without due consideration of the circumstances in which the entity is in or outside of the entity, such as environmental changes and the capabilities of its members. Therefore, utilization and effectiveness are also low after deployment. This study verifies 'the establishment of a Smart Factory through the environmental factors and absorption capabilities of small businesses' through empirical research. The survey was received by people working for small and medium-sized companies that have established Smart Factory. The results of the study showed that first, environmental factors within and outside the company had a positive effect on the absorption capacity within the company. Second, the absorption capacity within a company has had a positive effect on the deployment of a Smart Factory. Based on the above proof, it has been proved to be effective if the core areas of the Smart Factory are built on the basis of the company's internal and external environmental factors and absorption capabilities when constructing Smart Factory in small businesses. In the future, we will study the achievements of smart factory construction.

A Case Study on the Construction e-Collaboration Process Control System of Middle and Small Manufacturing Industry (중소제조업의 협업공정관리시스템 구축 적용 사례)

  • Kim, Jong-Tae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.32 no.2
    • /
    • pp.13-20
    • /
    • 2009
  • The purpose of this paper is to give information on e-CPC implementation in the manufacturing industry by studying and analyzing a small and medium sized manufacturing company. After analyzing Various factors on J's e-CPC implementation such as environmental factors, process management factor, and result factors, success factors on J's e-CPC implementation are analyzed. The results of this paper can be summarized as follows. First, the most leading role on J's ERP implementation is the will and support of CEO and team leaders. They led the implementation to be stability successfully by settling the different opinions among teams, showing their ability on process decision and communication with consultants. Second, J tried to prompt system stability by mapping out and conducting the long term change management strategy. Third, J organized ERP project team to implement ERP quickly, and it turned out to be successful Finally, J tried to get outside information from consultants and collaborative companies that have experience in implementing ERP. Especially J made full use of overseas consultants. In respect that this paper giver lots of information on e-CPC implementation in manufacturing industry by a case study of a small and medium sized manufacturing company which has not been carried out so far, it would be useful enough.

A Basic Study on the Risk Assessment of Domestic Construction Companies (국내 건설업체의 위험성평가 실태조사 기초 연구)

  • Park, Hwan-Pyo;Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.240-241
    • /
    • 2019
  • Construction disasters have more distinctive characteristics than other industrial disasters. Since it is likely that construction disasters will spread to severe accidents, the accident mortality rate is very high compared to the disaster incidence rate. Therefore, the purpose of this study is to compare and analyze the operation status of construction risk assessment by domestic large and medium sized construction companies to prepare improvement direction of risk assessment system. The survey results for safety management experts of construction companies are as follows: Large companies have developed and utilized risk assessment systems in their respective companies, while small and medium construction companies have developed and evaluated risk factors through the Excel program. Rather than performing risk assessment tasks based on historical safety accident data, construction companies have limitations in developing risk factors and preparing solutions with suppliers for each major construction. Therefore, it is necessary to prepare a risk assessment system in the future by analyzing the types of safety accidents, such as the safety accident data of each company as well as the safety accident data.

  • PDF

Construction on Lot Tracking System for Failure Cost Reduction of a Small and Medium Precision Parts Processing Company (중소정밀부품가공기업의 실패비용 감소를 위한 로트추적시스템 구축)

  • Ha, Young-Soo;Park, Soo-Yong;Lee, Dong-Hyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.42 no.3
    • /
    • pp.80-88
    • /
    • 2019
  • Recently, automobile manufacturing companies, which are major customers of them, are requiring IATF 16949 (ISO/TS 16949) certification as a mandatory requirement to secure product quality. In particular, IATF 16949 : 2016, revised in October 2016, was reinforced product traceability requirements for production information management by lot in the production process. Therefore, small and medium-sized precision parts processing companies in the automobile industry are very difficult to survive due to quality and price competition for customers satisfaction. MES (Manufacturing Execution System) is required to solve this problem. However, small and medium sized precision parts processing enterprises are reluctant to introduce the MES which is not suitable for the manufacturing environment of them such as high cost and low utilization. Even if the system is introduced, it is difficult to operate and maintain the system because the lack of computer manpower. In this paper, we propose a method for building a lot tracking system for small and medium precision parts processing companies by reviewing relevant literature and analyzing cases. In addition, by managing the production history for each lot of the final product in the system, we will grasp the effect of reducing the quality failure cost obtained by minimizing the range of defect selection.