• Title/Summary/Keyword: Marine environmental impact survey

Search Result 33, Processing Time 0.019 seconds

Improvement of the EIA for Land Reclamation Projects in the Coastal Areas of Korea (해양매립사업 환경영향평가의 개선방안)

  • Jang, Ju-Hyoung;Eom, Ki-Hyuk;Kwon, Kee-Young;Hong, Sok-Jin;Park, Jae-Hyeon;Kim, Gui-Young
    • Journal of Environmental Science International
    • /
    • v.16 no.7
    • /
    • pp.847-853
    • /
    • 2007
  • In Korean coastal areas, land reclamations are main development projects that should be based on environmental impact assessment(EIA), because those human interventions can change coastlines, damage tidal flats, and pollute adjacent areas to threat seafood safety and devaluate overall ecosystem service value. Existing procedures of the EIA for land reclamation projects were diagnosed and evaluated to enhance them. Problems were identified in the designation of survey areas, the consistency in survey sites and periods, the standardization of survey methods and reports, the confidence of survey results and the verification of predictions. Lack of integration was noticeable and could be improved by synthesizing different assessments from topography geography, marine physics, marine chemistry and marine biology. We suggest that successful precautionary marine environment management requires readjusting the cost of EIA, recruiting experts in marine environment, constructing database and establishing specialized assessment system.

A Study on Determinations of Survey Station in Marine Ecosystems Based by Impact Prediction of Environment Impact Assessment in Coastal Development Projects (연안개발사업 환경영향평가 영향예측 결과에 근거한 해양생태계 조사정점 선정방안에 관한 연구)

  • Cho, Beom-Jun;Maeng, Jun-Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.21 no.5
    • /
    • pp.767-779
    • /
    • 2012
  • In case of executing surveys in marine ecosystems, the most important things are scientific selection measures of survey stations that can represent various ecosystems characteristics in subjected areas. The situations show a lot of differences that understand characteristics of marine ecosystems in targeted areas according to selection methods and positions in survey stations. Investigation ranges and station numbers in marine ecosystems are classified according to project characteristics and scales. But, currently a clear divisions or objective standards are not. Therefore, this study tried to provide selection measures of survey station in scientific and objective marine ecosystems through precise analysis among environmental impact statements of coastal development projects until now. In this study, impact scopes of marine ecosystems correspond to physical impact predictions by undertaking projects. Impact ranges were divided into three(physical impact ranges) coastal waters. In case of proposing numbers of survey stations according to this survey ranges, numbers of investigation stations due to minimum survey scopes in targeted projects applied 20~30% of all numbers in survey stations. Number of survey stations due to average investigation scopes within physical impact ranges applied 60~70% of all numbers in investigation stations. Numbers of survey stations due to maximum survey ranges within physical impact scopes applied 10~20% of all numbers in survey stations. So, improvement measures were deducted. Finally, according to prediction ranges in impact of various coastal development projects, several kinds of conclusions are suggested. And, it is thought to be able to use as fundamental database to select investigation stations in marine organisms through this study.

Assessment and Improvement of Documentation Status on the Statements for the Sea Area Utilization Consultation according to the Project of Ports and Fishery Harbors (항만·어항개발사업의 해역이용협의서 작성실태 평가 및 개선방안)

  • Tac, Dae-Ho;Oh, Hyun-Taik;Kim, Gui-Young;Lee, Dae-In
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.21 no.4
    • /
    • pp.361-371
    • /
    • 2015
  • This study analyzed the 91 cases of the statements for the Sea Area Utilization Consultation according to the developmental projects of ports and fishery harbors for 2012 2014 and the status of the record of document, and suggested the improvement way to go. The marine environmental timpact assessment items both marine chemistry such as water quality, sediment and marine biology such as benthic animal, plankton, and fisheries show highly rate of site survey. But, the utilization of those data through site survey is too low, and it is necessary to adopt the QA/QC for the reliability of survey data. The items of marine physics such as tide, tidal current analyzed based on references not a site survey. However, the simulation performed actively without calibration and verification compared to the result of site survey. When the projects of port and fishery harbor perform, it is necessary to monitor the physical parameter such as wave, tide and tidal current especially. Based on the scale and the type of project, we need introduce the system of scoping for prediagnosis the key assessment items and checklists.

Improvements in the Marine Environmental Survey on Impact of Seawater Qualities and Ecosystems due to Marine Sand Mining (바다모래 채취 시 해수 수질 및 생태계 영향에 대한 해양환경조사 개선 방안)

  • Kim, Yeong-Tae;Kim, Gui-Young;Jeon, Kyeong-Am;Eom, Ki-Hyuk;Kim, In-Chul;Choi, Bo-Ram;Kim, Hee-Jung;Kim, Jin-Min
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.20 no.2
    • /
    • pp.143-156
    • /
    • 2014
  • We reviewed investigation status on turbidity plume in the statement of marine environmental survey(2008 to 2012) associated with marine sand extraction projects. The survey statement from seven marine sand extraction sites (extraction area of Southern EEZ, extraction area of Western EEZ, relocation zone in the Western EEZ, sea area under jurisdiction of Taean-gun, sea area under jurisdiction of Ansan City, and two discrete sea areas under jurisdiction of Ongjin-gun) in the nearshore and offshore of Korea showed that in situ observations were carried out for the dispersion and transport of suspended sediments on two areas (One is a extraction area in the EEZs, the other is an area of coastal sites). However, sampling station and range have not been selected considering physical, geographical factors (tide, wave, stratification, water depth, etc.) and weather conditions (wind direction and velocity, fetch, duration, etc). Especially turbidity plumes originating from three sources, which include suspended sediments in overflow(or overspill) discharged from spillways and reject chutes of dredging vessel, and resuspended sediments from draghead at the seabed, may be transported to a far greater distance outside the boundary of the extraction site and have undesirable impacts on the marine environment and ecosystem. We address that behaviour of environmental pollutants such as suspended solids, nutrients, and metals should be extensively monitored and diagnosed during the dispersion and transport of the plume. Finally we suggest the necessity to supplement the current system of the sea area utilization consultation and establish the combined guidelines on marine sand extraction to collect basic data, to monitor cumulative effects, and to minimize environmental damages incurred by the aftermath of sand extraction.

Improvements of Post-Project Environmental Management for the System of the Sea Area Utilization Consultation (해역이용협의제도의 사후환경관리 개선방안)

  • Kim, Gui-Young;Lee, Dae-In;Eom, Ki-Hyuk;Jeon, Kyeong-Am;Kang, Sung-Kyung
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.16 no.2
    • /
    • pp.121-129
    • /
    • 2013
  • This study investigated the status and problems of the post-project environmental management for development projects and suggested improvements of the system to achieve effectiveness for the system of the sea area utilization consultation. The post-project environmental management has had several problems such as the neglect of implementations and checks for the consultation items, the lack of actions and notifications of results, the absence of awareness and expertise of the post-project environmental management. In addition, although it is very important to verify results of actual change and modelling of marine environment before and after the projects, the marine environmental monitoring and assessment have been perfunctorily carried out. Thus, for the improvements of the post-project environmental management to the system of the sea area utilization consultation, it is extremely necessary for related stakeholders to raise awareness of the post management and implement it faithfully, and establish the post management system for conflict resolution and enforce sanctions and accountability against executory items. Furthermore, it should establish systematic monitoring system of marine environmental impact survey.

A Study on Environmental Impact Assessment Guidelines for Marine Environments in Harbor Construction Projects (항만건설사업의 해양환경 환경영향평가 가이드라인 개발 연구)

  • Maeng, Junho;Kim, Taeyun;Lee, Haemi
    • Journal of Environmental Impact Assessment
    • /
    • v.31 no.3
    • /
    • pp.141-160
    • /
    • 2022
  • The harbor construction projects can lead to various marine environmental problems including habitat degradation and loss, marine water pollution, change of flow patterns, erosion, scour, sedimentation, and so on. The EIA is a measure to prevent various environmental problems in advance from examining and minimizing the environmental impacts before the proposed developments are implemented. In addition, institutions reviewing EIA reports have made efforts to conduct scientific and standardized EIA by applying EIA guidelines for each project. This study aims to create a EIA guideline focusing on the harbor construction projects. Based on the review comments of the harbor construction EIA reports for the past 13 years (2009-2021) and the EIA guidelines of different types of projects, we identified the marine environmental problems and provided the appropriate guideline. This guideline summarizes and presents the contents which must be reviewed in the baseline condition survey, impact assessment, mitigation, and post-environmental impact investigation in the fields of marine fauna and flora, marine physics, and marine water and sediment quality. In the case of a baseline condition survey of marine fauna and flora, a method for selecting survey points considering the characteristics of sea area and project was presented. When estimating the impact of marine fauna and flora, we presented methods for predicting the impact on them due to the spread of suspended sediments and the damage to benthic habitats due to dredging and reclamation. In consideration of the characteristics of the sea area, we divided the survey items of the marine physics into essential items and supplementary items. In predicting the impact of marine physics, various methods for major issues such as seawater circulation, suspended sediment and bottom sediment transport, water temperature and salinity diffusion, seawater exchange, wave transformation, harbor tranquility, and shoreline change were presented. The research results will contribute to protect the marine environment by inducing more systematic and scientific surveys, impact assessments, and mitigation in the EIA process.

Improvement for Impact Assessment of Marine Physical on the Development of Ports and Fishing Harbors in the East Coast (동해안 항만 및 어항 개발사업에 따른 해양물리학적 영향평가 개선방안)

  • Kim, In-Cheol;Kim, Gui-Young;Jeon, Kyeong-Am;Eom, Ki-Hyuk;Yu, Jun;Lee, Dae-In;Kim, Young-Tae;Kim, Hee-Jung
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.19 no.2
    • /
    • pp.111-118
    • /
    • 2013
  • This paper suggested the improvement of marine environmental impact assessment in eastern coast as analyzing consultation on the coastal area utilization for development of ports and fishing harbors for 3years in the east coast. The results of survey are only 3cases, 12cases and 16cases each for ocean currents, wave and sounding data. However, for development of ports and fishing harbors in eastern coast, ocean characteristics in eastern coast different than in the West Sea, South Sea is considered to marine environmental impact assessment. For development of ports and fishing harbors in east coast where the influences of ocean currents, wind-driven current and waves are dominant, the effect of the current should be considered to improve the reproducibility of tidal current. The wave should also be considered as an assessment criteria to obtain the validity of project such as harbor tranquility, functionality of breakwaters and stability. In addition, sediment inflow in river and exact water depth data of the ocean should be applied to numerical modeling and set wave-induced current to external force of sediment transport to predict the problems such as the harbor siltation and the coastal erosion considering ocean characteristics in the east coast.

An Analysis of the Impact of Japan's Contaminated Water Release from Nuclear Power Plant on Korean Consumption of Seafood - Focused on Survey Results (일본의 원전 오염수 방류가 국내 수산물 소비에 미치는 영향 분석 : 설문조사 결과를 중심으로)

  • Yun, Yu-Jin;Kim, Eun-Kyeong
    • The Journal of Fisheries Business Administration
    • /
    • v.53 no.2
    • /
    • pp.58-72
    • /
    • 2022
  • Fishery products play an important role in Korean food culture, and awareness of the safety of fishery products is increasing in the seafood market. Against this backdrop, Japan has announced a plan to release radioactive water to the sea from 2023. In the case of Korea, it is adjacent to the area to be discharged, so there are concerns about securing the safety of marine products. Therefore, it is necessary to analyze the change in perception and impact of marine product consumers due to the discharge of contaminated water and to study appropriate countermeasures when discharging contaminated water from nuclear power plants. In this study, the current status of radioactive contaminated water discharge in Japan was summarized, and a survey was conducted on the change in the consumption perception of marine products according to the discharge of contaminated water to analyze the factors affecting the consumption change of domestic consumers. According to the survey, 85.3% of the respondents said that it will affect the purchase of domestic marine products if Japan starts discharging contaminated water from nuclear power plants. Moreover, 85.5% of the respondents said it will affect the purchase of imported marine products.

Improvement of the Environmental Impact Assessment and Post-environment Impact Survey Reports Using Marine Environment Assessment Indices (해양환경 평가지수를 활용한 환경영향평가서 및 사후환경영향조사결과 통보서 개선 방안 연구)

  • Lee, Eojin;Kim, Taeyun
    • Journal of Environmental Impact Assessment
    • /
    • v.30 no.2
    • /
    • pp.61-74
    • /
    • 2021
  • In this study, we used marine environment assessment indices to evaluate impacts of various development projects on the marine environment. TheWaterQuality Index (WQI) was applied in the field of marine water quality and the Cleanup Index of Harmful Chemicals (CIHC), the Cleanup Index of Eutrophication (CIET), the Enrichment Factor(EF) were used in the field of marine sediment. In the field of marine benthic organisms, the Benthic Health Index (BHI) and the Benthic Pollution Index (BPI) were utilized. Each assessment index was calculated using the data observed in the development project, and its characteristics and usefulness were evaluated. The assessment method and criteria were clearly defined for WQI, CIHC, and BHI. Furthermore, through these indices, an integrated environment impact analysis was possible. Apart from the indices presented in this study, there are various indices that can be used for evaluating the marine environment. Therefore, it is important to utilize appropriate indices according to the characteristics of each project.

Improvement of the Estimation Method for Harbor Tranquility of Fishery Harbor (어항의 항내 정온도 평가사례 및 개선방안)

  • Tac, Dae-Ho;Kim, Gui-Young;Jeon, Kyeong-Am;Lee, Dae-In
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.21 no.6
    • /
    • pp.637-644
    • /
    • 2015
  • In order to estimate harbor tranquility, it is needed to simulate wave propagation in a harbor by using both methods under abnormal wave condition and normal wave condition. The problem is the latter case was not simulated in the statement for the Sea Area Utilization Conference. As harbor calmness about normal wave condition has the same meaning as harbor serviceability, in order to assess harbor tranquility, it is needed to survey wave data for long periods but the survey was not done by reason of a lack of budget and shortage of time for plan. It is more important to make a plan for minimizing environmental impact and to assess an improvement of fisherman's living environmental as the assessment of the harbor serviceability is related with the propriety of the plan. In order to assess it, it is needed to understand it clearly, survey for long period of wave data, and clarify the procedure for computation of it. And also providing wave data like tide and tidal current data from KHOA (Korea Hydro graphic and Oceanographic Agency) and making a guideline for assessing it are needed.