• Title/Summary/Keyword: Management priority

Search Result 1,923, Processing Time 0.029 seconds

Diagnosing communication management using SW-CMM concept (SW-CMM 개념을 활용한 의사전달관리의 진단)

  • Lee, Seon-Gi;Park, Jeong-Ha
    • 시스템엔지니어링워크숍
    • /
    • s.1
    • /
    • pp.15-20
    • /
    • 2003
  • Construction industry recognizes the necessity to manage is business from viewpoint of processes, and consider developing, evaluating and improving standard processes as important managerial target. SW-CMM provides basic framework for this process management. However, appropriate tailoring and adjustment are essential for SW-CMM concept to be applied to construction business. SW-CMM makes construction manager understand the capability of business process, based on which the priority of process improvement is judged. The capability is prescribed by common features. This paper introduces the basic frame for diagnosing construction business processes with SW-CMM, and presents the case study of analysing processes focusing on communication management.

  • PDF

Performance and comparison resource management policies with channel De-Allocation in GPRS Network (GPRS에서 채널 de-allocation 이용시 자원관리 정책 평가 비교)

  • 송윤경;박동선
    • Proceedings of the IEEK Conference
    • /
    • 2003.07a
    • /
    • pp.61-64
    • /
    • 2003
  • GPRS is designed for transmitting packet data and supposed to take its radio resource form the pool of channels unused by GSM voice services. In this paper, The GPRS and GSM circuit switched services share the same radio resource. Whenever a channel is not used by circuit switched services, it may be utilized by GPRS. In this paper, the main aim is performance and comparison resource management policies with channel de-allocation in GPRS network. Three resource management policies is voice priority, R-reservation, dynamic reservation.

  • PDF

Prioritized Channel Allocation for Cellular Mobile Systems Using Simulated Annealing

  • Chang, Kun-Nyeong
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.23 no.3
    • /
    • pp.37-47
    • /
    • 1998
  • Under the cutoff priority discipline, the prioritized channel allocation problem is formulated, which minimizes the overall blocking probability while ensuring the co-channel interference constraints. To deal with the problem more conveniently, the concept of pattern is used. A simulated annealing approach is applied to the problem, and computational experiments show that a high-quality solution is obtained.

  • PDF

On the Consideration of Logistics Network Establishment and Priority Evaluation between Korea and China Using AHP method (AHP법을 이용한 한중간 물류네트워크 구축에 따른 우선과제 평가에 관한 연구)

  • Yeo, Gi-Tae;Park, Chang-Ho;Seo, Su-Wan
    • Journal of Korea Port Economic Association
    • /
    • v.20 no.2
    • /
    • pp.169-185
    • /
    • 2004
  • It is an urgent problem that Korea logistics enteprises' expansion of advance into China market and the logistics network establishment between Korea and China to back up the former are to be solved. Accordingly, the purpose of this study is to deduce the subjects to establish the logistics network between Korea and China, and to evaluate the priority order. The results of this research are as follows: First, we conducted face-to-face interviews on the advisery group in China and Korean enterprises which advanced into China, and drew out 6 promoting subjects to build the logistics network between the two. Second, the AHP model was adopted, which is a multi-criteria?multi-hierarchical decision making method, to draw out the weight and priority order of the deduced 6 promoting items. Third, the resultant priority order of the promoting subjects is as follows: No.1 - to establish the distribution & logistics support center by region(0.3900); No.2 - to support various taxes in investing the logistics business abroad(0.1980) ; No.3 - to improve the management of CIQ(0.1958); No.4 - to back up the joint-venture of logistics firms(0.1169); No.5 - to enhance trade and foreign policies to deregulate the entry into logistics markets(0.0536); No.6 - to construct the logistics information system of China(Northest Ssia)(0.0458). This paper resulted in finding out Korea logistics enterprises that have not secured their own inland-transport network in China and the actual difficulties of Korean enterprises with using the inferior network that advanced into China. These problems were developed into the analysis adopting the AHP method, and the significancy of this paper is to present the priority order of promoting problems using a sophisticated technique.

  • PDF

Priority Control Using Cell and Windows Counter in ATM Switchs (ATM 교환기에서 셀 및 윈도우 카운터를 이용한 우선순위 제어)

  • Kim Byun-Gon;Seo Hae-Young;Jang Ting-Ting;Park Ki-Hong;Han Cheol-Min;Kim Nam-Hee
    • The Journal of the Korea Contents Association
    • /
    • v.6 no.3
    • /
    • pp.1-11
    • /
    • 2006
  • With the improvement of information telecommunication technology, the various service in broadband integrated services digital networks have a wide range of delay, delay jitter and cell loss probability requirements according to traffic specification. Therefore, the design of appropriate control schemes that can satisfy the cell loss, delay requirements with various traffic specification for B-ISDN is an extremely important challenging problem. In this paper, we propose a priority control scheme using a window counter and a cell counter per each type of class. In the proposed priority control scheme, for satisfying required service quality, we performed the priority control scheme using the delay/loss factors obtained by comparing window counter with cell counter. The performance of proposed control scheme is estimated by computer simulation. In the results of simulation, we verified that the proposed method satisfied per class requirements as the results showed that cell loss probability has a order of video, data, voice and delay time has a order of video, voice and data.

  • PDF

Analysis of Priority Investments for Preventing Roadside Slope Failures (도로비탈면 투자우선순위 결정에 관한 연구)

  • Kim, Seung-Hyun;Kim, Hong-Gyun;Oak, Young-Suk;Lee, Jong-Hyun;Koo, Ho-Bon
    • The Journal of Engineering Geology
    • /
    • v.23 no.3
    • /
    • pp.257-269
    • /
    • 2013
  • Prevention plans for landslide and slope disasters should be appropriate for a country's budget when considering a systematic investment plan. The systematic management of slopes adjacent to national highways should incorporate reasonable investment risk and the expected degree of damage should be calculated by considering the investment priorities. In terms of priority of investment, the major factors used to determine the degree of hazard are gradient, soil characteristics, RMR (Rock Mass Rating), stability interpretation, type of discontinuities, and history of collapse, among others. The likely consequences of slope failure can be determined by considering traffic volume, the number of lanes, and average vehicle risk. We performed such calculations regarding the priority of investment and performed a regression analysis for 392 slopes located in Yeongseo region, Gangwon province. The calculation results show that collapsed slopes have a higher priority for investment, as do slopes with a high proportion of dangerous sections and locations in valleys.

Establishment and Effectiveness Analysis of Emergency Vehicle Priority Signal Control System in Smart City and Directions for ISMS-P Technical Control Item Improvement (스마트시티 내 긴급차량 우선신호 제어시스템 구축과 효과성 분석 및 ISMS-P 기술적 통제항목 개선 방향성 연구)

  • Yoon, TaeSeok;Park, Yongsuk
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.25 no.9
    • /
    • pp.1166-1175
    • /
    • 2021
  • We investigate the current situation and development trend of domestic smart city and emergency vehicle priority signal control system analyzing the existing effectiveness of 1) emergency vehicle priority signal control system and 2) control emergency vehicle priority signal, based on domestic and foreign prior research for signal control system security. The effectiveness of time reduction was analyzed through actual application and test operation to emergency vehicles after establishing the system. In addition, for security management and stable service of real-time signal system control we propose improvement for the technical control items of the ISMS-P certification system to secure golden time to protect citizens' precious lives and property in case of emergency by classifying and mapping the existing ISMS-P certification system and the Korea Internet & Security Agency's cyber security guide according to the items of security threats.

A Study on the Establishment of Priority for IT Project Management Using AHP (AHP 기법을 이용한 IT 프로젝트 관리 우선순위 수립에 대한 연구)

  • Kyung, Tae-Won;Kim, Sang-Kuk
    • Information Systems Review
    • /
    • v.9 no.3
    • /
    • pp.157-181
    • /
    • 2007
  • Main concerns of IT project managements are concentrated on the output control and process management. IT project, however, is difficult to measure the quality of achievement, because it produces invisible and intangible outputs. Many studies have been carried on to quantify the intangible aspects of process management. However, most of them have been focused on the technological aspects. This study measures the priority of factors to manage IT project by applying the IT-BSC and PMBOK method. Established indexes include the factors of managerial, social and future-oriented perspectives to check the different aspects of project management over the technical factors. This study uses AHP method for quantitative measurement. This study can be meaningful because of following reasons. First, this study re-arranges IT project management evaluation indexes by balanced scorecard. Second, this model includes human factors of developers and users who are directly related to the project development and operation. Third, important items of each stakeholder have been separated, and the weights of each item have been quantified to have fixed values.

Ten Year Literature on Psychological and Behavioral Interventions Against Cancer: a Terms Analysis

  • Feng, Rui;Chai, Jing;Wang, De-Bin;Xia, Yi;Cheng, Peng-Lai;Dai, Zhao-Yang
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.13 no.10
    • /
    • pp.5171-5176
    • /
    • 2012
  • We here performed a systematic review of PBIC literature using terms analysis in a hope of both identifying potential trends and patterns and exploring methods leveraging traditional literature reviews in this specific area. Articles meeting inclusion criteria were retrieved from PUBMED and translated into dichotomized article records representing presence or non-presence of MeSH terms and a metric consisting of numbers of times of co-occurrence between all pairs of terms identified using a self-designed program. The occurrence of and relations among the terms were calculated and visualized using Excel2007 and UCINET respectively. A total of 1,742 terms were identified from 997 articles retrieved. Put in a descending order, the lines representing the times of term occurrence formed a typical hyperbolic curve; when plotted along the x-axis of whole MESH terms, the lines clustered within four specific regions. Comparison of term occurrence between 2002 and 2011 revealed priority changes in population and subjects (from general groups to priority groups), intervention approaches (from medicine to exercise and psychotherapy), methodology and techniques (from cohort studies to randomized controlled trials) and outcomes (from health and mental health to quality of life, depression etc.). Networks of the terms featured a number of closely linked groups of topics including method and questionnaires, therapy and outcomes, survival management, psychological assessment and intervention, behavioral intervention (individual and community oriented). Terms analysis revealed interesting trends and patterns about PBIC publications and both the analysis methods and findings have implications for future research and literature reviews.

The Priority Analysis of the Risk and Countermeasures for Quality Control in the Steel Structure (강구조물 공사의 품질관리를 위한 리스크 중요도 분석 및 대응방안)

  • Cho, Hang-Min;Song, Young-Woong;Ahn, Jae-Bong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.87-96
    • /
    • 2007
  • Recently construction environment is being professionalized. oversized and diversified. Due to fluctuation of construction environment, the demand for the project of steel structure is ieased gradually and steel construction is needed the efficient quality management. The construction of steel structure which required a variety of sub-contractors, the progress of works and technologies are comprehensive of various risks and uncertain factors. But currently the construction of steel structure is conducted the risk management by perception and experience of constructors. Therefore, the analyzing factors of the risk and establishing the device are able to manage the quality management efficiently. In this study, we have conducted the interview of experts, polls and through the Analysis Hierarchy Process (AHP) for the scientific and systematic risk management. This paper will propose a plan for systematization of the construction of the steel structure.