• Title/Summary/Keyword: Management Works

Search Result 2,114, Processing Time 0.027 seconds

A Study on Classification of the Management Works in the Apartment House (공동주택 관리업무 유형화에 관한 연구)

  • 박현옥
    • Journal of the Korean Home Economics Association
    • /
    • v.26 no.3
    • /
    • pp.125-134
    • /
    • 1988
  • This study is for classification of the management works in the Apartment House. The approach of this study depends on the consultation of concerned references and direct interview by structured questionnaire. The management works are classified and compared, analysized with foreign cases. 1) It is 13 hour a day to carring out the management works in the Board. 2) Compared the management works in the Apartment House with England and the united states, the leaders, they are the first I performing all of management. The secondaries are the Japan and Korea. Specially Japan is collecting data in the maintenance. In case of Korea, they are performing all of management but little. We expect a more thoroughgoing preinvestigation, control of planning and management of community life for the inhabitants in time to come. 3) the management works of the Apartment House are classified three types. \circled1management of administration \circled2 management of maintenance \circled3 management of community life control.

  • PDF

Process Interference Management for Finish Works using Mobile Technology (모바일 기술을 이용한 마감공사의 작업간섭 관리)

  • Ko, Yong-Ho;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.35-36
    • /
    • 2017
  • The finish works of construction projects comprises approximately 40% of the total construction duration. Thus, the management of finish works have as big as impacts on total project duration as the earthworks, foundation and structure works. Process interference management is considered one of the most important issues dealt during finish works. However, it was investigated that effective management systems have yet not been applied for practical use. Accordingly, this paper suggests a mobile technology based finish works management system that mainly focuses on preventing process interference occurred due to ineffective communication between general and sub-contractors.

  • PDF

Development of Construction Project Management System Applicable to Earth-Work Field (토공 현장관리 중심의 시공관리시스템 개발에 관한 연구)

  • Kwon, Oh-Yong;Jo, Jae-Ik;Kim, Do-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.301-304
    • /
    • 2008
  • The purpose of this study is to embody the integrated working management system for public works, focused on the management of surplus soil at a field of public works. The contents and results of this study can be classified into the design of working management DB for public works and the embodiment of working management DB. First, the design of working management DB for public works consists of three DBs - process management to analyze work plan and performance. for backhoe loader, working management and resources management for equipment and labor management - in connection with work and resources classification system. Secondly, the working management system for public works can describe work plan and performance on a floor plan using graphic. Based on this, the status of process and progress report with visual expression had been developed to facilitate the communications and performance of duties among staff in charge at the field of public works. This study is a specialized system for a company specializing in public works and a system that can be put into practical use if practicality is proved through test-bed with regard to business.

  • PDF

Classifying Management Tasks to Improve PC Construction Management System (PC공사 관리체계 개선을 위한 주요 관리업무 분류)

  • Mun, Seong-Hwan;Kim, Taehoon;Cho, Kyuman
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.177-178
    • /
    • 2020
  • In the construction industry, expectations for the Precast Concrete(PC) construction method are rising due to demands for high quality and productivity and social and environmental issues. However, although technical problems that occurred in the early stages of technology introduction have been solved, research related to proper construction management for PC construction methods has been relatively neglected and the advantages of PC construction methods have not been fully utilized. In this study, each group involved in PC works was surveyed to identify important management tasks affecting productivity of PC works to improve PC contruction management system. Based on factor analysis, 22 tasks were calssified into 5 management groups. The results of this study will be used to present a framework for the application of automation and information technology to improve the productivity of PC works.

  • PDF

Study on the Maintenance and Management using DB Program of Inspection Data for Tunnel (터널의 진단자료 DB화에 의한 유지관리 연구)

  • Lee, Song;Shim, Min-Bo
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.503-510
    • /
    • 2000
  • Recently, many kinds of research has been actively developing for a standardization and information related to the construction works. These works include the general field of design, construction, supervision, maintenance and management on facilities. The works of database construction for a standardization and information were chiefly propelled centering around the present conditions related to the design, construction work. The field related to maintenance and management on facilities lags behind in the works of database construction. The establishment of standard classification system(SCS) on facilities and inspection data is most important among the things related to maintenance and management to have a efficiently maintenance and management. This paper suggests SCS on facilities and inspection data according to that of facilities. On the basis of SCS of facilities and inspection data, code work with classification system and input work for a data of maintenance and management was practised. The purpose of this paper is to suggest a kind of statistics data and investigate a characteristics of inspection using statistic data on tunnel structures

  • PDF

Safety Management Information System in Plants Construction Work (플랜트 건설공사의 안전관리 정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.4
    • /
    • pp.23-29
    • /
    • 2012
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as appurtenant works, temporary works, structural works, equipment work, finishing work and etc based on accident examples and investigation on actual condition in plants construction work. In addition, the safety management system was developed to perform risk assessment of plants construction and use it for effective safety training for labor.

Study on the Necessity of Risk Assessment for The Live-Line working of Electrical Construction (전기공사업 활선작업의 위험성평가 필요성에 관한 고찰)

  • Choi, Seung-Dong;Hyun, So-Young;Han, Hyeong-Ju;Hong, Yong-Soo
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2011.04a
    • /
    • pp.719-730
    • /
    • 2011
  • The live-line works are very dangerous works on direct contacts or neighboring contacts with the distribution line. But most of domestic electrical construction companies that have performed live-line works are small-scale companies. Accordingly, safety management system and manuals to insure worker's safety haven't sufficiently had. In this paper, risk and status of accidents for the live-line works were analyzed and the necessity of introducting risk assessment for live-line works was identified by a questionnaire survey of electrical construction companies and education institutions.

  • PDF

A Study on Standard Process of Risk Management for Defense Systems Test Works (무기체계 시험업무에 대한 리스크 관리 표준 프로세스 연구)

  • Taeheum Na;Dongeun Heo;Youngmin Kim;Jooyeoun Lee
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.27 no.3
    • /
    • pp.364-374
    • /
    • 2024
  • Today, risks created by uncertainty must be managed for successful project execution. From this perspective, applying a risk management process is very important for successful defense systems test works. This paper describes 'the implentation of risk management process for test work' carried out by DTERI's process improvement activities. In this study, the concept of risk management process, and details of the risk management process are examined through PMBOK and ISO/IEC/IEEE 15288, CMMI. After that, we defined 'Standard Process for Risk Management' of defence systems test works. And, we describe 'Risk Management Function' of DTERI's Project Management System(PMS) and the risk management process of DTERI. Finally, the effectiveness of the risk management standard process is verified through quantitative analysis.

A Study on the Improvement of the Test Process for Defense Systems Based on Quantitative Management (정량적 관리 기반 무기체계 시험업무 프로세스 개선 연구)

  • Tae Heum Na;Joo Yeoun Lee;Young Min Kim
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.20 no.spc1
    • /
    • pp.1-11
    • /
    • 2024
  • Today, the importance of test and evaluation of defense systems is increasing day by day. In performing efficient defense systems test works, process improvement based on quantitative management is essential. The purpose of this paper is to present the results of process improvement for the defense systems test works of the test organization based on quantitative management activities. As a methodology to confirm process improvement performance, the 'MPM(Managing Performance and Measurement)' practice area of the CMMI model was applied. The quantitative management model for defense systems test works was developed so that it could be practically applied not only to the entire test organization but also to the organization at the department level that actually performs the test work. Finally, the application cases of the quantitative management model for defense system test works and the results of process improvement were described.

XML-base Process Improvement for Change Order of Construction Steel Works (XML 적용 철골공사 설계변경 프로세스 개선)

  • Nam, Gyoung-Woo;Seo, Yong-Chil;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.64-72
    • /
    • 2006
  • The participants of steel works should exchange a variety of information with others through documents. However construction steel works in the multistage contract system has a difficulty in exchanging information through the documents promptly. So if the trouble as change orders arise, conducting steel works will take much time, and the participants may not discuss the trouble sufficiently. Consequently this study improved the current business process of steel works. And this developed business support system(XCOS) based on XML so that participants of steel works achieve a successful management of steel works through conducting business rapidly and correctly.