• 제목/요약/키워드: Management Method of Park

검색결과 4,155건 처리시간 0.031초

오염부하지속곡선(LDC)을 이용한 수질오염총량관리 단위유역 목표수질 달성여부 평가방법 (Methodology for the Identification of Impaired Waters Using LDC for the Management of Total Maximum Daily Loads)

  • 박준대;오승영
    • 한국물환경학회지
    • /
    • 제28권5호
    • /
    • pp.693-703
    • /
    • 2012
  • Load Duration Curve(LDC) is a useful tool for analyzing water quality characteristics under various stream flow conditions. This study investigated the methods to identify impaired waterbodies in the assessment of water quality goal attainment by using LDC for the management of Total Maximum Daily Loads (TMDLs). Three methods were proposed. Non-typical regime exclusion method is a method to exclude water quality observations in the non-typical extreme flow conditions in order to minimize the influence of non-ordinary water quality. Flow regime weighted average method is a method to calculate weighted mean water quality instead of arithmetic mean in order to consider water characteristics properly on stream flow regime in addition to the effect of Non-typical regime exclusion method. Load exceeded interval comparison method is a method to compare the intervals between the attained and non-attained load duration periods on the LDC. The assessment of water quality goal attainment can be performed more reasonably and precisely considering water quality variations on stream flow conditions by applying these proposed methods.

철도 시설물의 진도관리를 위한 시뮬레이션 기법 연구 (A Study on Simulation Method for Progress Management in Railway Structures)

  • 김현승;박남진;서화진;김창학;신민호;강인석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1513-1517
    • /
    • 2010
  • Recently, the important of Progress Management is being emphasized because construction have become more complex and increasingly specialized. The existing progress control method needs to be changed because only numerical information is being provided and is very difficult to understand all poor progress. To resolve these problem, this study suggests a simulation method for progress management by using 4D CAD System because 4D CAD system has effective functions to convert numerical information to visualized information. The suggested simulation method not only are reviewed an application of railway construction but enables managers to understand problems in managing this system for verifying the suggested simulation method.

  • PDF

Genetic Algorithm을 이용한 RFID 건설 자재 관리 시스템 최적화 (Optimization for RFID Based on Construction Material Management System Using Genetic Algorithm)

  • 김창윤;김형관;한승헌;박상혁
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.511-514
    • /
    • 2006
  • 자재 관리는 건설프로젝트에서 소요되는 전체 비용의 50%이상에 해당하는 가장 중요한 현장 관리 중 하나이다. 건설 분야의 자재 관리 방법 증 하나로 무선 주파수 인식(Radio Frequency Identification)을 사용한 관리가 시도되고 있다. 하지만 현재 RFID의 트랜스폰더(Transponder)를 어떻게 그리고 어디에 설치하여야 효율적인 자재 관리가 이루어지는 지에 대한 연구가 미비한 실정이고 어떠한 방법으로 최적화를 하여야 효율적인 설치가 될 것인지에 대한 연구도 이루어 지지 않고 있다. 따라서 본 연구에서는 RFID 트랜스폰더를 공사 현장에서 어떻게 그리고 어디에 설치하여야 효율적인 위치 설정이 될 수 있는지 유전자 알고리즘(Genetic Algorithm)을 이용한 최적화 방법에 대하여 알아본다.

  • PDF

CMMI와 PMBOK의 비교 분석을 통한 정량적 프로젝트 관리 (Quantitative Project Management Using Comparison of CMMI and PMBOK)

  • 김경환;김흥재;박용범
    • 정보처리학회논문지D
    • /
    • 제12D권4호
    • /
    • pp.601-608
    • /
    • 2005
  • 소프트웨어 개발 프로젝트에 있어서 품질, 비용, 개발기간의 개선은 매우 중요하다. 소프트웨어의 품질, 비용, 개발기간의 개선을 위해서는 프로젝트의 결과물만을 다루어서는 안되고 소프트웨어 개발프로세스의 기획과, 프로세스 자체의 개선이 포함되어야 한다. SEI의 CMMI와 ISO/IEC 15504(SPICE)에는 프로젝트 관리를 위한 프로세스가 정의 되어있다. 또한 인력, 자금, 스케줄 등을 포함하여 프로젝트 전체의 진행상황을 관리하는 방법으로 PMBOK가 도입 되었다. PMBOK은 프로젝트 관리 방법에 관해서 CMMI, SPICE보다 상세하게 그리고 구체적인 방법이 제시되어 있어 많은 기업들이 CMMI 혹은 SPICE 에 PMBOK을 통합시켜서 프로젝트 관리를 시도하고 있다. 본 논문에서는 CMMI와 PMBOK를 통합하여 프로젝트 관리에 근W를 따르면서도 PMBOK의 구체적인 관리 방법을 적용할 수 있는 방안을 제안하고 그에 필요한 매트릭스를 제시한다.

Kano 품질분석을 위한 아이디어 발상법 적용에 관한 연구 (Application of Idea Generation Methods to Kano Quality Model)

  • 김태영;박영택
    • 한국품질경영학회:학술대회논문집
    • /
    • 한국품질경영학회 2010년도 춘계학술대회
    • /
    • pp.283-290
    • /
    • 2010
  • This paper suggest that the derivation of good and practical ideas is important for the successful use of Kano model. Wish List, Bug List and Forced Connection Method as well as Brainstorming were applied to PMP(Portable Multimedia Player) in order to derive customer attributes. Wish List and Bug List are variants of Brainstorming, which are contrary to each other. Forced Connection Method is designed to bring about bisociation which is a typical characteristic of creative thinking.

  • PDF

현장작업 개선을 위한 Lean-SMAIS 방법론 연구 -프로아이(ProEye) 소프트웨어 활용 중심으로- (A Study on Lean-SMAIS Methodology for Field Work Improvement - By using ProEye Software -)

  • 박창도;이상복
    • 품질경영학회지
    • /
    • 제40권2호
    • /
    • pp.166-175
    • /
    • 2012
  • Enterprises are continuously trying management innovation activities for survival. Among representative management innovation activities in domestic manufacture enterprise, which are TPS, 6 sigma, Lean 6 sigma etc. Many enterprises through these reform activity have gotten good result. However, these techniques have merits and demerits according to circumstance of enterprise. Specially, there are a lot of difficulties in medium and small size enterprises. In this research, We introduce Lean-SMAIS Method for medium and small size enterprises that is consists of the merit of lean 6 sigma and software(which is called ProEye). We prove Lean-SMAIS method is useful by applying medium and small size enterprise A company.

RFID를 활용한 공동주택 건설공사 자재관리 방안 연구 (Materials management using RFID in the apartment construction)

  • 박소현;송정화;오건수
    • 한국주거학회:학술대회논문집
    • /
    • 한국주거학회 2008년도 춘계학술발표대회 논문집
    • /
    • pp.251-255
    • /
    • 2008
  • Nowadays the scale of domestic construction becomes large, sophisticated and specialized. It has led to a growing need for the high quality, cost reduction, safety and reduction of work duration. Therefore the importance of construction materials management is emphasized to perform the project successfully. It becomes an current issue about method of construction material management according to the flow of construction progress in the construction field. Therefore, various researches using RFID for efficiency of construction material are being studied. We analyzed the case study using RFID, drew the problems through the investigation of status about the management of material in the field, and then suggested the method of material management using in the apartment building construction field.

  • PDF

ERP 환경에서 EAI시스템 실증적 적용 사례 연구 (The Implementation of Enterprise Application Integration System in ERP Environment)

  • 남호기;박상민;김종현;정성아
    • 대한안전경영과학회지
    • /
    • 제12권3호
    • /
    • pp.197-205
    • /
    • 2010
  • The company protects the information of legacy system to satisfy all member in company. Integrating between applications is increasing recently because of e-Business activation. The e-Business activation also make between extra companies and intra companies integrated. This paper suggest on implementing the ERP using Phased Approach Method and the EAI(Enterprise Application Integration) with legacy system. This paper also suggest the standard method which would be used in implementing the EAI in another company and reduce the mistake during the EAI project. Therefore, it would be the one system between complicated systems through application integration, it would be also make shop floors visualized. This research would help users and service suppliers getting more advantages of e-Business system.

건설프로젝트 계획단계에서 폐기물 관리방안 연구 (A Study on Waste Management Method of Construction Project in Planning Stage)

  • 조성;조용;박원호;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 추계 학술논문 발표대회
    • /
    • pp.155-158
    • /
    • 2008
  • This paper shows construction management focused on waste management in construction project in planning stage Construction waste is given a great deal of weight on total waste. And it is issued in government policy. But it show the limit of problem.As a result of having referenced idea as describe above, this paper will be studied by this process. First, present condition of development waste, cases is researched in construction projects. Second, problems of development pattern and management system are investigated and checked in project cases. Third, maintenance and management method project are proposed by application of planning Stage.

  • PDF