• Title/Summary/Keyword: Man-hour Analysis

Search Result 51, Processing Time 0.022 seconds

An Analysis of Multidimensional Productivity for the Shipbuilding Performance (조선 성과 측정을 위한 다차원 생산성의 분석)

  • Kim, Yearnmin
    • Korean Management Science Review
    • /
    • v.34 no.2
    • /
    • pp.57-66
    • /
    • 2017
  • The purpose of this study is to analyze the multidimensional productivity of the shipbuilding performance and to explain the role of different factors, such as man-hour, dock period, number of building block, launching process rate, automatic welding percent, and drawing fault rate which are important production-related variables in most shipbuilding companies. The shipbuilding productivity is obtained using Data Envelopment Analysis (DEA) approach. Then, a Tobit model is considered to measure the influence of different factors on the measured productivity. The results reveal that this productivity measure can substitute a representative shipbuilding productivity index (CGT/man-hour) in shipbuilding industries. Also, this multidimensional productivity analysis using DEA and Tobit reveals complex relationships between production-related variables and CGT and sale.

Empirical Analysis of Man-hour Data to Support a Cost-Plus Pricing Approach for Estimating BIM Service Costs

  • Koo, Bonsang;Lee, Ghang;Kim, Chung-woon;Shin, Byungjin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.660-661
    • /
    • 2015
  • Building Information Modeling (BIM) is a nascent technology in Korea, and currently lacks formal guidelines to assist Architectural and Engineering (AE) firms in estimating BIM service fees, while also allowing government agencies to allocate budgets for the rendered BIM services. This research provides a method to estimate costs for BIM services based on the cost-plus pricing framework. The approach requires a generalized estimate of the man hour per floor area data to calculate the direct labor costs. Man-hour data were collected from forty five projects that have implemented BIM. Interpolation of the man-hours was performed to develop a general reference table for 'Type 2' (i.e., public schools and office buildings, etc.) projects. By providing an objective approach for estimating the costs of BIM services, it allows clients and AE firms to agree upon a fair cost for BIM related services, and thus expedite its adoption in Korea.

  • PDF

A Study on the Method of Computing Standard Wartime Maintenance Man-Hour Incorporating Wartime Maintenance Condition (전장 정비환경을 고려한 전시 표준정비인시 산출방안 연구)

  • Kim, Min-Hyuk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.6
    • /
    • pp.477-483
    • /
    • 2021
  • In a military maintenance system, the standard maintenance man-hour of weapon systems is a tool to estimate the maintenance capabilities of maintenance units, provide standards for determining the maintenance needs and workload, and provide basic data for establishing a maintenance plan. The standard maintenance man-hours of major weapon systems have already been derived and used, but the standard maintenance man-hour in a wartime maintenance environment has not been computed. Therefore, the standard wartime maintenance man-hours need to be derived and This study proposes a process and method of computing the maintenance man-hours. In addition, this work suggests the criteria of collecting and screening data that is necessary for estimating the standard maintenance man-hours and introduces a methodology for analyzing the characteristics of maintenance man-hour distribution in the process. The proposed process first designs a model that reflects the wartime maintenance environment, selects statistical techniques, collects maintenance data, analyzes the descriptive statistics, estimates the distribution, and finally presents representative values of maintenance man-hour. Based on the proposed method, the standard wartime maintenance man-hours of the four weapon systems were calculated, and the distribution of the maintenance man-hours was analyzed to follow a lognormal distribution, and the method presented reliable results.

A Study on the Material Supply Man-Hour Computation based on MODAPTS in Automobile Assembly Line (MODAPTS 기반 자동차 조립공정 부품공급 공수 산정에 관한 연구)

  • Jang, Jung-Hwan;Jang, Jing-Lun;Quan, Yu;Jho, Yong-Chul;Kim, Yu-Seong;Bae, Sang-Don;Kang, Du-Seok;Lee, Jae-Woong;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.3
    • /
    • pp.127-135
    • /
    • 2016
  • Korean automobile industrial is in a difficult situation because of more competitive global market and lower demand. Therefore, domestic as well as global automobile manufacturers are making greater efforts in cost reduction to strengthen the competitiveness. According to statistical data, logistics cost in domestic manufacturers is higher than advanced countries. In this study, we developed program to effectively manage standard time of procurement logistics, and confirm based on A-automobile factory data. For the purpose, we develop the system which is possible to manage standard time as well as calculate man-hour. Program is not just for calculating and managing standard man-hour, scenarios analysis function will be added to calculate benefit while introduce logistics automated equipment. In this study we propose scenario using AGV instead of electric motor while move component. In the scenario analysis, job constitution is changed, and then we use system to compare the result. We can confirm standard man-hour is reduced from 22.3M/H to 14.3M/H. In future research, it is necessary scenario analysis function, and develop algorithm with realistic constraint condition.

A Study on the Productive Capacity Setting of Women's Jacket (여성 재킷의 생산능력 설정을 위한 연구)

  • Kim, Jin-Sun;Shim, Kyu-Nam;Oh, Soon
    • Fashion & Textile Research Journal
    • /
    • v.13 no.2
    • /
    • pp.269-278
    • /
    • 2011
  • This study aims at setting up productive capacity which can be usefully utilized for work management of apparel manufacturers. So as to achieve this goal, an apparel manufacturing company which has been operated by miniline system in Seoul was selected. Standard time and man-hour were calculated to create the accurate productive capacity by observing and measuring a work flow included cutting, sewing and finishing processes. And the result is as following. The standard time for each process was presented as cutting process 47004.5s, sewing process 671050.5s and finishing process 22426.3s. And 15284.4ms was computed as total procession man-hour per day of the manufacturer which is organized of 16 people. Also, the procession man-hour for each process was revealed as cutting process 396.7ms(2.6%), sewing process 14509.3ms(94.9%) and finishing process 378.5ms(2.5%). +Surplus was found in the productivity for each process included the cutting process(outshell, lining and seam process), the sewing process(preparation and arrangement process) and the finishing process. But, additional man-hour 52436.18ms was required because the productive capacity was calculated as -surplus(-13.9%) in the sewing process(part and assembly process). Therefore, a work schedule was planned based on the previous result. However, loading can be ideal when a capacity and a load become '0'. The object company should find the way to reduce allowance(26.25%) of the sewing process through reconstruction of consciousness and improvement in functions with analyzing works of operators. Also, they need to consider an additional supplement of the personnel.

An Effect Analysis for Productivity Elevation by the System Improvement (시스템 개선에 의한 생산성 향상 효과 분석)

  • Kim, Dae-Sig
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.2
    • /
    • pp.113-123
    • /
    • 2010
  • The goal of this study is to analyze an effect of productivity elevation. For the goal, the various methods of the productivity elevation were suggested and the system improvements were conducted. The S company was established in Ban-Wol Industrial Complex, Ansan-City, Kyonggi-Do on 2007. The company was hiring 22 employees. The main manufactures were heavy duty equipment parts and the amount of sale was two billion won on 2008. Problems which the company faced were ambiguous production target management and materials loss. To solve the problems, NCT work improvement and automatic welding were induced. There were steel saving of 3,780,000won/month and man-hour saving of 144,000won/month by redesign of the steel sheet for the NCT steel job. Also, changing from handwork to automatic welding, the man-hour saving for the welding job was 320M/H and saving of 4,225,600won/month. The others of systematic improvement for productivity elevation were usage of jig and daily equipment checklist.

Integrating drafting with analysis and design of framed steel structures (철골 구조물의 통합 설계 시스템)

  • 김홍국;이병해
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1991.10a
    • /
    • pp.127-132
    • /
    • 1991
  • The purpose of this study is to integrate a structural design Process of framed steel structures. It is composed of analysis, design, drafting and construction management. However each step of these works involved with a large amount of data and man hour resources. The aim of this study is to alleviate time consuming efforts mentioned above by integrating the different stage of works. Very successful results have been achieved by setting up a common database in whole process and applying the techniques of knowledge base system.

  • PDF

Comparative Study on Waste Collection Factor in Jeju (제주도의 폐기물 수거요소 분석에 관한 비교 연구)

  • Kang, Hyun Choon;Kim, Tae Yoon;Yu, Seong Pil;Kang, Jin Young;Huh, Mock
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.17 no.1
    • /
    • pp.103-109
    • /
    • 2009
  • Analysis of collection factor was studied to compare various parameters such as collection time, transport time, amount of collection and number of man power by on-the-spot survey at one municipal area and one rural area in Jeju-do. Results showed that the amount of man and time to collect 1 ton of waste of rural area($5.853man{\cdot}hour\;per\;time$) was four times as much as that of municipal area($1.527man{\cdot}hour\;per\;time$). In case of a transport time, rural area(11.08 per km/hr) has similar value to municipal area(11.07 per km/hr) and has half or one third value to the restaurant(36.7km/hr), an apartment area(33.0km/hr) and a detached area(22.4km/hr).

  • PDF

Preparation of $Gal^3Man_4(6^3-mono-{\alpha}-D-galacto-pyranosyl-{\beta}-mannotetraose)$ by Bacillus sp. ${\beta}-mannanase$ and Growth Activity to Intestinal Bacteria (Bacillus sp.유래 ${\beta}-mannanase$에 의한 $Gal^3Man_4(6^3-mono-{\alpha}-D-galacto-pyranosyl-{\beta}-mannotetraose)$ 조제 및 장내세균에 대한 생육활성)

  • Kim, Sang-Woo;Park, Gwi-Gun
    • Applied Biological Chemistry
    • /
    • v.47 no.4
    • /
    • pp.379-383
    • /
    • 2004
  • For the elucidation of substrate specificity to the brown copra meal by Bacillus sp. ${\beta}-mannanase.$, the enzymatic hydrolysate after 24 hr of reaction was heated in a boiling water bath for 10 min, and then centrifuged to remove the insoluble materials from hydrolysates. The major hydrolysates composed of D.P 5 and 7 galactosyl mannooligosaccharides. For the separate of galactosyl mannooligosaccharides, the supernatant solution of 150 ml was put on a first activated carbon column. The column was then washed with 5 l of water to remove mannose and salts. The oligosaccharides in the column were eluted by a liner gradient of $0{\sim}30%$ ethanol, at the flow rate of 250 ml per hour. The sugar composition in each fraction tubes was examined by TLC and FACE analysis. The combined fraction from F3 was concentrated to 30 ml by vacuum evaporator. Then put on a second activated carbon column. The oligosaccharides in the column were eluted by a liner gradient of $0{\sim}30%$ ethanol (total volume: 5 l), at the flow rate of 250 ml per hour. The eluent was collected in 8 ml fraction tubes, and the total sugar concentration was measured by method of phenol-sulfuric acid. The major component of F2 separated by 2nd activated carbon column chromatography were identified $Gal^3Man_4(6^3-mono-{\alpha}-D-galactopyranosyl-{\beta}-mannotetraose)$. To investigate the effects of brown copra meal galactomannooligosaccharides on growth of Bifidobacterium longum, B. bifidum were cultivated individually on the modified-MRS medium containing carbon source such as $Gal^3Man_4$, compared to those of standard MRS medium.

Man-hours Prediction Model for Estimating the Development Cost of AI-Based Software (인공지능 기반 소프트웨어 개발 비용 산정에 관한 소요 공수 예측 모형)

  • Chang, Seong Jin;Kim, Pan Koo;Shin, Ju Hyun
    • Smart Media Journal
    • /
    • v.11 no.7
    • /
    • pp.19-27
    • /
    • 2022
  • The artificial intelligence software market is expected to grow sixfold from 2020 to 2025. However, the software development process is not standardized and there is no standard for calculating the cost. Accordingly, each AI software development company calculates the input man-hours according to their respective development procedures and presents this as the basis for the development cost. In this study, the development stage of "artificial intelligence-based software" that learns with a large amount of data and derives and applies an algorithm was defined, and the required labor was collected by conducting a survey on the number of man-hours required for each development stage targeting developers. Correlation analysis and regression analysis were performed between the collected man-hours for each development stage, and a model for predicting the man-hours for each development stage was derived. As a result of testing the model, it showed an accuracy of 92% compared to the collected airborne effort. The man-hour prediction model proposed in this study is expected to be a tool that can be used simply for estimating man-hours and costs.