• Title/Summary/Keyword: Maintenance effectiveness

Search Result 608, Processing Time 0.023 seconds

Study of Performance Criteria Methodology for Maintenance Effectiveness Monitoring Program for Nuclear Power Plants (원전 정비효과성감시 프로그램의 성능기준설정 방법론 개선)

  • Song, Tae-Young;Yeom, Dong-Un;Hyun, Jin-Woo
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.8 no.2
    • /
    • pp.26-32
    • /
    • 2012
  • The systems of the nuclear power plant are designed based on the User Requirement Document, and Korea Hydro & Nuclear Power Co. (KHNP) implements preventive maintenance activities to keep the specific design function of the system consistently. To monitor the preventive maintenance effectiveness, KHNP has also developed maintenance effectiveness monitoring (MR) program based on NUMARC 93-01 since 2003, and has implemented the program in all operating plants. Recently, KHNP has upgraded MR programs by reflecting implementing experiences ; reestablishing the performance monitoring level, improving analysis for standby function and performance criteria for passive components, reestablishing the availability performance criteria and the performance criteria for the same type of components. These upgraded MR programs will contribute to enhance safety and improve equipment reliability through monitoring maintenance effectiveness.

A Study on Maintenance Rule for the Maintenance Effectiveness Monitoring (정비 효율성 감시를 위한 정비규정에 관한 연구)

  • 황미정;김길유
    • Journal of the Korean Society of Safety
    • /
    • v.16 no.2
    • /
    • pp.110-116
    • /
    • 2001
  • The objective of the Maintenance Rule (MR) is to require monitoring of the overall continuing effectiveness of licensee maintenance programs to ensure that the safety related and certain nonsafety-related SSCs are capable of performing their intended functions. In Korea, as risk informed applications and regulation become active, the necessity of Performance Based Regulation (PBR) has increased. The objective of this article is to study the effectiveness of MR based on performance and feasibility of MR adoption at Korean Nuclear Power Plants (NPPs) for effective maintenance and regulation.

  • PDF

Variation Analysis of Power Generation according to Maintenance of Photovoltaic Equipment (태양광 발전설비의 유지관리에 따른 발전량 변화 분석)

  • Park, Byeong-Hun;Choei, Jong-Won;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.79-80
    • /
    • 2015
  • With the government's support for new and renewable energy, photovoltaic equipment has rapidly been supplied. However, compared to supply rate, maintenance has not supported enough and relevant research has not much conducted. Therefore, the purpose of this study is to analyze maintenance effectiveness of photovoltaic equipment. What is the most important in maintenance effectiveness is a rise in power generation. It was estimated that if photovoltaic equipment for detached houses is maintained well, power generation increases by 4.0% at least, and by 6.5% on average. As a result, it was analyzed that it is necessary to maximize the effectiveness of the government's budget investment through well maintenance of photovoltaic equipment for detached houses.

  • PDF

A Study on Airplane Maintenance Engineers and Pilots Relationships and Effectiveness of Flight Operation (항공정비사와 조종사의 관계 및 운항성과에 관한 연구)

  • 강인원;최세종
    • Journal of Korean Society of Transportation
    • /
    • v.21 no.3
    • /
    • pp.23-35
    • /
    • 2003
  • This paper investigates the effectiveness of flight operation between airplane maintenance engineers and pilots who work together. The developed model is to identify the relationship between the attitudes of airplane maintenance engineers and pilots and the effectiveness of flight operation. The results indicate that the shared values and balanced power between airplane maintenance engineers and pilots are positively related with trust and job satisfaction, but conflict is negatively related. Further, trust and job satisfaction positively affect the effectiveness of flight operation. These findings suggest that the improvements of the relationships between airplane maintenance engineers and pilots need more efforts to ensure the aviation safety and efficient flights.

Ordering Policy for Planned Maintenance with Salvage Value

  • Park, Young T.;Jing, Sun
    • International Journal of Quality Innovation
    • /
    • v.7 no.3
    • /
    • pp.15-23
    • /
    • 2006
  • A spare ordering policy is considered for planned maintenance. Introducing the ordering, uptime, downtime, inventory costs and salvage value, we derive the expected cost effectiveness. The problem is to determine jointly the ordering time for a spare and the preventive replacement time for the operating unit which maximize the expected cost effectiveness. Some properties regarding the optimal policy are derived, and a numerical example is included to explain the proposed model.

The effectiveness of geosynthetic reinforcement, tamping, and stoneblowing of railtrack ballast beds under dynamic loading: DEM analysis

  • Lobo-Guerrero, Sebastian;Vallejo, Luis E.
    • Geomechanics and Engineering
    • /
    • v.2 no.3
    • /
    • pp.161-176
    • /
    • 2010
  • Discrete Element Method (DEM) simulations were developed to investigate the effectiveness of geosynthetic reinforcement and the effectiveness of maintenance techniques performed on a simulated ballast bed subjected to dynamic loading. The results from four samples subjected each one to a total of 425 load cycles are presented: one unreinforced and unmaintained sample, one unmaintained but reinforced sample, one unreinforced sample subjected to maintenance in the form of stoneblowing after 200 load cycles, and one unreinforced sample subjected to maintenance in the form of tamping after 200 load cycles. The obtained values of permanent deformation as a function of the applied number of load cycles for the four cases are presented together allowing a comparison of the effectiveness of each technique. Moreover, snapshots of the simulated track sections are presented at different moments of the simulations. The simulations indicated that the geosynthetic reinforcement may not be beneficial for the analyzed case while stoneblowing was the most effective maintenance technique.

Adsorption behaviour of film-forming amine on pre-oxidized carbon steel surface

  • Genxian, Lin;Yun, Sun;Canshuai, Liu;Jun, Fang;Lijun, Song;Bin, Liu
    • Nuclear Engineering and Technology
    • /
    • v.54 no.4
    • /
    • pp.1185-1194
    • /
    • 2022
  • The maintenance of condenser main pipe is the key to achieve film-forming amine maintenance effectiveness. In this work, oxygen content, pH and temperature of the solution were controlled to simulate the condition of condenser main pipe, and magnetite coated carbon steel sample was prepared by pre-oxidization. CAM was used to characterize the hydrophobicity of film formed samples. Hydrophobic film was formed on pre-oxidized carbon steel samples when octadecylamine concentration reaches 20 mg/kg. SEM, EDS, EIS, and PD were used to characterize the influence of octadecylamine concentration on maintenance effectiveness. It was found that the maintenance effectiveness was enhanced and the corrosion rate was suppressed with the increase of octadecylamine concentration. FIB and TEM were used to detect the adsorbed octadecylamine film thickness founding that octadecylamine adsorbed onto the surface of pre-oxidized carbon steel by multi-layer adsorption mechanism.

A Study on the Development of Interactive Electronic Technical Manual to Improve the Maintainability for Underwater Guided Weapon (수중유도무기의 정비성 향상을 위한 전자식 기술교범 개발에 관한 연구)

  • Shin, Ju-Hwan;Yun, Won-Young
    • IE interfaces
    • /
    • v.18 no.3
    • /
    • pp.308-316
    • /
    • 2005
  • Delayed repair to the failure of weapon system can cause enormous damages to military operation. Various materials like diagnostic equipment, general and special tools, technical manuals(maintenance manual and illustrated parts breakdown) and drawing documents are required for maintenance. For existing weapon systems the distributed environment of these various materials reduces the maintenance effectiveness of maintenance crew. In this paper, to provide the information of maintenance procedures and supply to the maintenance crew we develope a digital interactive electronic technical manual of the technical documents which can be used easily in computer through question and answer method and improve maintenance effectiveness and minimized repairing time.

A case study on evaluating the effectiveness of maintenance policies under imperfect maintenance (시뮬레이션을 통한 불완전 유지보수하에서의 유지보수 정책의 효율성 평가에 관한 사례 연구)

  • Lee, Duk-Gyu;Lee, Hi-Sung
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1539-1544
    • /
    • 2008
  • There is a existing study dealing with the case that the effect of preventive maintenances to restore the door system is imperfect. When the effect of the preventive maintenance is imperfect, we need to consider the maintenance effect for making reliable and economical maintenance policies. The maintenance policies applicable for imperfect maintenance cases are considered and their effectiveness are evaluated through simulation in cases of passenger door system:PDS.

  • PDF

Development of Maintenance Effectiveness Monitoring Program based on Design Characteristics for New Nuclear Power Plant (신규원전의 설계특성 기반 정비효과성감시 프로그램 개발)

  • Yeom, Dong-Un;Hyun, Jin-Woo;Song, Tae-Young
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.8 no.1
    • /
    • pp.25-32
    • /
    • 2012
  • Korea Hydro & Nuclear Power Co. (KHNP) has developed and implemented the maintenance effectiveness monitoring (MR) programs for the operating nuclear power plants. The MR program is developed by reflecting design characteristics of the operating nuclear power plants to monitor the plant performance for improving the safety and reliability. Recently, KHNP has built a new nuclear power plant, and developed the MR program to establish the advanced maintenance system by reflecting unique design characteristics based on the OPR1000 standard model. So, the MR program developed in this study has another characteristics in comparison with the OPR1000 standard model, and we will verify the suitability of the MR program through evaluating initial performance of the plant. The safety and reliability of the new plant will be improved by developing and implementing the MR program.