• 제목/요약/키워드: Maintenance Work

검색결과 1,275건 처리시간 0.03초

RCM을 적용한 유지보수 시스템 구축에 관한 연구 (A Study to the Plan for Development of Maintenance applied RCM)

  • 오안섭;이헌일;신국호;신건영;장성태
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.907-914
    • /
    • 2011
  • It has used for Rolling Stock Maintenance a number of maintenance system applied RCM in Railway(Korea Railroad Corporation, Seoul Metro, Korail Airport Railroad Corporation, etc) so far. Some institutions has been using develop Computational System including reliability process. A majority of the system has computerized maintenance work, but it is shown that developed focus on administrator and developer not user. SMRT(Seoul Metropolitan Rapid Transit Corporation) has developed computational system for maintenance in the '90s and saved many data about Maintenance Historical Data. However, this system reached the limits application of this data. Maintenance of computer systems is managed directly by the field staff and to introduce Reliability-centered maintenance SMRT was continually reviewed system development trends and supplement the existing system. To successfully operate RCM program should be gained full support in the whole company and field communicate, secure a reliable data from field and the most important take a patience. Our corporation will operate and develop successful RCM thorough review of these problems in the future.

  • PDF

시뮬레이션 기법을 활용한 열차 차량기지의 중정비 검수 용량 평가 (Evaluation of Train Overhaul Maintenance Capacity for Rolling Stock Depot Using Computer Simulation Method)

  • 장성용;전병학;이원영;유재균
    • 한국철도학회논문집
    • /
    • 제10권2호
    • /
    • pp.231-242
    • /
    • 2007
  • As railroad industry faces the new Renaissance era, effective and efficient maintenance methods for rolling stock operation are required with advanced railroad technology. All kinds of railroad systems such as high-speed long-distance train, metropolitan mass transit and light rail require systematic maintenance technology in order to maintain the safe railroad operation. Simulation models for regular operations of the example maintenance center are developed. In this study, standard maintenance procedures, layout, equipments, and number of workers of Siheung Metropolitan Railroad Maintenance Rolling Stock Depot are considered. The proposed simulation models are developed using simulation package ARENA. After simulation, four types of observations are analyzed. First, the bottleneck operation is identified. Second, the relationship between maintenance center size, number of workers and cycle time is analyzed. Third, the scheduling performances between PERT/CPM and Critical Chain Project Management(CCPM) are compared. Lastly, the simulation results according to worker's working coverage shows expanding the worker's coverage decreases the cycle time and increases throughput per train. However, workers are to be fully trained to do multiple skill work.

Analysis of Safety Alarm Mechanism for RF -based Equipment for Casualty Protection by Railway Maintenance Vehicle

  • Jo, Hyun-Jeong;Hwang, Jong-Gyu;Yoon, Yong-Ki
    • International Journal of Safety
    • /
    • 제9권2호
    • /
    • pp.29-34
    • /
    • 2010
  • When doing maintenance works at the trackside of railway, the method which delivers information on approaching of train to maintenance workers through alarm devices such as the flag or indication light, etc., is being used by locating persons in charge of safety alarm in addition to the maintenance workers at fixed distances in the front and rear of the workplace. Workers maintaining at the trackside may collide with the train since they cannot recognize the approach of train although it approaches to the vicinity of maintenance workplace because of the sensory block phenomenon occurred due to their long hours of continued monotonous maintenance work. The clash or rear-end collision accidents between many maintenance trains called motor-cars can be occurred since there are cases where the signal systems for safe operation of motor-car such as track circuit etc. are blocked or not operated normally. We developed the new safety equipment for protection of trackside maintenance workers using radio frequency signals and bidirectional detection mechanism. The developed safety equipment must analyze the several operational mechanism for each different operation situations. In this paper the analysis results are represented.

교육시설 유지관리 프로그램 운영관리를 위한 핵심성공요인 도출 (Derivation of Critical Success Factors for Operation Management of Educational Facility Maintenance Management Program)

  • 이미영;박상헌;윤선재;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.51-52
    • /
    • 2021
  • The maintenance of educational facilities is divided into inspection and management of facility managers residing in the school and Educational Environment Improvement Projects(EEIP) to carry out maintenance work. Educational support organizations collect maintenance requests through facility inspections by school-specific facility managers, and carry out numerous maintenance projects during the year. The EEIP has the characteristic of Program Management with interrelationships between projects, not multiple projects management. The purpose of the EEIP is to eliminate the inconvenience of school facility users and increase their satisfaction, and achieving the goal is judged to be successful. Despite the importance of management and performance measurement utilizing Critical Success Factor(CSF) for the operation of successful educational facility maintenance management programs, the system for achieving the goals is insufficient. This study derives CSFs for each stage of the EEIP for the success of the EEIP. The CSFs for each stage of the EEIP is expected to serve as a basis for evaluation of educational facility maintenance management programs and can be used as an evaluation index in the future.

  • PDF

Implant system에 있어서 치과위생사의 assist work (Assist works as to implant system which dental hygienists perform in a clinical field)

  • 남용옥;김선숙;김민자;주온주
    • 한국치위생학회지
    • /
    • 제9권2호
    • /
    • pp.147-163
    • /
    • 2009
  • This study was attempted in order to look into 'Assist work' as to Implant system which dental hygienists perform in a clinical field. Subjects of this research were 362 dental hygienists who work at general hospital, University hospital, dental hospital, and dental clinics located in Seoul, Kyeong-gi, In-chon, and Jeon-buk area. As to research tool, we produced questionnaire which was comprised of the total 25 items regarding 3 of general features (age, career of dental hygienist, and personality), 6 of implant system assist work, 3 of Informed consent before surgery, 6 of preoperative preparation and maintenance related business, and 7 items related to postoperative maintenance. By using SPSS program, collected data was analyzed. Results of analysis in this study were as follow; 1. As to implant related education, dental hygienists' experience of education was high as 77.7%, and the people who is needed more education was 86.3%. Consequently, dental hygienists' concern about the implant related education was very high. 2. It was observed that most of informed consent making approvement by announcement to the surgical operation was made by dental hygienist before implant as 95%. 3. Over 80% of dental hygienists performed acquisition of cleanliness technology, motivation, back up articles preparation, treatment area arrangement, and etc. which we can check by preoperative maintenance items. In particular, response about the motivation was very high as more than 90%. 4. When performing an operation, in the case of disinfecting finger was low for 53.9% and the method was mainly washing with drug solution, and gown sterilization was performed only in 52.2%. Therefore education regarding disinfection was urgently needed. 5. Significance of education could be known that answers of hygienists experienced education appeared highly in items of maintenance method and there was statistically significant difference(p<0.05). 6. In case that assist work were 21cases or greater, agitation measurement was the most many performed in 68.9% and difference was showed up significantly(p<0.001). 7. Evaluation about periodontal tissue was high in dental hygienists who had experienced education and also there was statistically significant difference. In conclusion, assist work of dental hygienists was very comprehensive when implant surgery was performed, and all of items excluding hand disinfection or gown disinfection were highly showed up in most of hygienists. However, since there is the limit that we didn't investigate the quality of performing contents. It is considered that further study regarding the content has to be progressed for supporting this result in the future.

  • PDF

유지관리단계의 하자 재발생을 고려한 창호공사 시공단계의 중점관리요소 분석 (Analysis of Major Factors of Window Work in Construction Phase Considering Recurrence of Defects in the Maintenance Phase)

  • 정우진;김대영;임지영;박현정
    • 한국건축시공학회지
    • /
    • 제21권6호
    • /
    • pp.653-664
    • /
    • 2021
  • 최근 에너지절약형 친환경주택의 건설기준 강화에 따라 고효율 주택의 수요가 증가하며, 창호공사의 비중이 함께 증가하고 있다. 창호는 사용빈도가 높고, 시공 시 특성에 따라 많은 하자가 발생할 가능성이 존재한다. 정부 기관이 공공임대주택에서 발생한 하자 민원을 조사한 바에 따르면, 접수된 민원 중 창호공사의 하자가 가장 높은 비중을 차지하고 있었다. 이에 따라 관련 선행연구를 고찰해보았고, 국내의 기존연구들은 창호공사의 시공 특성과 유지관리의 중요성을 반영한 연구가 부족한 실정이었다. 또한, 기존의 국외 연구들은 비용적 측면을 함께 고려해 시공자와 거주자의 입장을 모두 고려하였으며, 하자와 원인의 관계를 구조화하기 위한 움직임을 보여주었다. 따라서 본 연구는 창호공사의 시공단계에서 발생하는 원인을 분석해 시공 특성을 반영하고, 하자 보수 후 재발생 가능성에 기초한 유지관리의 중요성을 함께 고려해 중점관리요소를 도출할 것이다. 또한, 궁극적으로 하자 유형과 원인의 인과관계를 분석해 직관적 판단이 가능한 하자 유형별 중점관리요소를 선정함으로써 실효성 높은 하자관리 방안을 제시해 시공단계 하자를 예방하고 유지관리 비용을 저감하는 데 기여할 것이다.

전자산업 공정 설비 작업 안전보건가이드 개발 (Development of a General Occupational Safety and Health (OSH) Guide for Maintenance Work at Electronics Industry Processing Facilities)

  • 김소연;이승희;박정연;한택현;문재진;정인균;조경이;권세영;정광재;박동욱
    • 한국산업보건학회지
    • /
    • 제34권1호
    • /
    • pp.18-25
    • /
    • 2024
  • Objectives: The primary aim of this study is to create an Occupational Safety and Health (OSH) guide for high-risk maintenance tasks, specifically one designed for maintenance work (MW) in the electronics industry. Methods: The methodology involved a literature review, field investigations, and discussions. An initial draft of the OSH guide was created and then refined through consultations with experts possessing extensive experience in MW for electronic processes. Results: Specific MW tasks within electronics processing facilities identified as high-risk by the research were selected. A comprehensive OSH guide for these tasks was developed consisting of approximately 11 to 12 components and encompassing about 20-25 pages. Implementing safety and health measures before, during, and after MW is crucial for the protection of maintenance personnel. The guide is enriched with real-case scenarios of industrial accidents and occupational diseases to enhance maintenance workers' comprehension of the OSH principles. For a clearer understanding of and adherence to the safety protocols, the guide incorporates visual aids, including cartoons and photographs. Conclusions: This OSH guide is designed to ensure the protection of workers involved in maintenance activities in the electronics industry. It aligns with global standards set by the International Organization for Standardization (ISO) and Semiconductor Equipment and Material International (SEMI) to ensure a high level of safety and compliance.

철도 운행선로 작업자와 열차 접촉사고 위험도 평가에 관한 연구 (Risk Estimation Study on Railway Track Worker Hit by Train)

  • 곽상록
    • 한국안전학회지
    • /
    • 제35권3호
    • /
    • pp.72-78
    • /
    • 2020
  • The accident fatality rate has decreased by more than 90% compared to 2006, due to the safety management and safety investment based on the Rail Safety Act. Most railway safety indicators, including fatality rates, have improved significantly from 60% to 80%, reaching the level of developed countries in terms of most railway safety indicators. However, the only staff fatality rate at work is not improved, and it is 3 to 5 times higher than that of developed countries. Most of the fatality occurred during employee's work recently occurred due to accidents hit by train while track work. In principle, when operating track need to check or maintenance, the operation of the train should be stopped and the work carried out. However, in Korea, due to the highest passenger density and train operating density in the world, it is caused by a structural problem that requires workers to enter the track while the train is running and perform various tasks such as maintenance and inspection. In this study, we analyzed the risk of accidents caused by hit by trains on the track, which is the biggest cause of staff fatality, using the main statistics of the last 10 years. In detail, the scenarios of the main causes of hit by trains and workers were formed to suggest the effectiveness of the current preventive measures and supplementary.

항만건설작업선의 선박안전법 제10조제3항(임시변경) 적용범위에 관한 연구 (Application Range of "Temporary Alteration" in the Article 10 of Ship Safety Act)

  • 손영태
    • 해양환경안전학회지
    • /
    • 제29권2호
    • /
    • pp.177-187
    • /
    • 2023
  • 「선박안전법」은 선박의 감항성(堪航性, Seaworthiness) 유지 및 안전운항에 필요한 사항을 규정하고 있으며, 이와 관련해서 이 법 제10조에서는 선박소유자가 선박검사를 받은 후 해당 선박의 선박검사증서에 적혀 있는 내용을 일시적으로 변경하고자 하는 경우에 임시검사를 받도록 하고 있다. 이와 같은 조치는 이 법 제15조에 따른 선박검사 후 선박의 상태유지에 따른 것으로 여기에는 「항만법」 제39조제1항에 따른 "항만건설작업선"을 포함하고 있다. 그러나 항만건설작업선은 본래 부선(艀船)과 동일한 운용체계를 보이고 있음에도 불구하고 「선박안전법」을 적용받지 아니하고 「건설기계관리법」에 따른 등록 및 검사·점검을 받아오다 2012년 12월 14일 울산항만 내에서 작업 중 발생한 "석정36호" 침몰사고를 발단으로 2016년 「항만법」이 개정되면서 「선박안전법」에 추가해서 적용받게 된 점 등을 고려할 때 항만건설작업선을 「선박안전법」에서 정하고 있는 모든 규정을 따르도록 적용하는 것은 현실적 한계가 있다 할 것이다. 이에 따라 본 논문에서는 항만건설작업선의 개념, 등록, 작업구역, 검사규정, 임시변경 적용사례 등을 통한 작업특성 및 실제 항만건설작업선의 「선박안전법」 적용범위와 관련해서 논란이 되고 있는 사항 등에 대해 살펴보고, 또한 「항만법」의 개정에 따라 항만건설작업선을 「선박안전법」의 검사대상으로 편입하게 된 입법취지 등을 통해 「선박안전법」 제10조에서 규정하고 있는 임시검사 중 "임시변경"에 관한 사항을 적용하는데 있어서의 그 적정범위를 제시하고자 한다.