To provide electricity power of good quality, it is essential to establish generation of electricity plan in electric power system based on accurate power-demand prediction and cope with changes of power-need fluctuating constantly. The role of hydraulic-power generation of electricity in electric power system is of importance because responding to electric power-demand counts or reservoir-type hydraulic-power generation of electricity which is designed for additional load in electric power system. So hydraulic-power generation of electricity must have fast start reserve. But the amount of water, resources of reservoir-type hydraulic-power generation of electricity is restricted and multi-used, so the scheduling of management by exact forecasting the amount of water is critical. That is why efficient hydraulic-power generation of electricity makes a main role on pumping up the utility of energy and water resource. This thesis introduced the example of optimal generation of electricity plan establishment which is used in managing reservoir-type hydraulic-power generation of electricity.
Park, Jaeseok;Sungrok Kang;Kim, Hongsik;Seungpil Moon;Lee, Soonyoung;Roy Billinton
KIEE International Transactions on Power Engineering
/
v.2A
no.3
/
pp.121-128
/
2002
This study proposes a new method for transmission system expansion planning using fuzzy integer programming. It presents stepwise cost characteristics analysis which is a practical condition of an actual system. A branch and bound method which includes the network flow method and the maximum flow - minimum cut set theorem has been used in order to carry out the stepwise cost characteristics analysis. Uncertainties of the permissibility of the construction cost and the lenient reserve rate and load forecasting of expansion planning have been included and also processed using the fuzzy set theory in this study. In order to carry out the latter analysis, the solving procedure is illustrated in detail by the branch and bound method which includes the network flow method and maximum flow-minimum cut set theorem. Finally, case studies on the 21- bus test system show that the algorithm proposed is efficiently applicable to the practical expansion planning of transmission systems in the future.
Kim, Hong-Sik;Moon, Seung-Pil;Lee, Young-Jin;Choi, Hyong-Lim;Choi, Jae-Seok
Proceedings of the KIEE Conference
/
2001.11b
/
pp.350-353
/
2001
This study proposes a new method for the transmission system expansion planning using the fuzzy integer programming. It presents stepwise cost characteristics analysis which is a practical condition of an actual systems. A branch and bound method which includes the network flow method and the maximum flow-minimum cut set theorem has been used in order to proceed the stepwise cost characteristics analysis. Uncertainties of the permission of the construction cost and not strict reserve rate and load forecasting of expansion planning have been included and also processed using fuzzy set theory in this study. In order to proceed the latter analysis, the solving procedure is illustrated in detail by branch and bound method which includes the network flow method and maximum flow-minimum cut set theorem. Finally, case studies on 21-bus test system show that the algorithm proposed is efficiently applicable to the practical expansion planning of transmission systems in future.
Reinforcement corrosion can cause serious safety deterioration to aging concrete structures exposed in aggressive environments. This paper presents an approach for reliability analyses of deteriorating reinforced concrete structures affected by reinforcement corrosion on the basis of the representative symptoms identified during the deterioration process. The concrete cracking growth and rebar bond strength evolution due to reinforcement corrosion are chosen as key symptoms for the performance deterioration of concrete structures. The crack width at concrete cover surface largely depends on the corrosion penetration of rebar due to the expansive rust layer at the bond interface generated by reinforcement corrosion. The bond strength of rebar in the concrete correlates well with concrete crack width and decays steadily with crack width growth. The estimates of cracking development and bond strength deterioration are examined by experimental data available from various sources, and then matched with symptom-based lifetime Weibull model. The symptom reliability and remaining useful life are predicted from the predictive lifetime Weibull model for deteriorating concrete structures. Finally, a numerical example is provided to demonstrate the applicability of the proposed approach for forecasting the performance of concrete structures subject to reinforcement corrosion. The results show that the corrosion rate has significant impact on the reliability associated with serviceability and load bearing capacity of reinforced concrete structures during their service life.
Kim, Pil-Seok;Kang, Ho-Young;Lim, Il-Hyung;Park, Jong-Ho;Shin, Yong-Hak
The Transactions of The Korean Institute of Electrical Engineers
/
v.64
no.8
/
pp.1161-1167
/
2015
Distribution Management System(DMS) ienhancing distribution automation system-based operation efficiency is an optimized system by various operational applications in a distribution network. DMS employs various applications like topology reconfiguration, volt/var control, and restoration at events such as overload, voltage violation, and a fault in a distribution system. An operation efficiency to employ multi-applications as restoration with short-term load forecasting is higher than a performance by a single application; and the applications are accomplished by an operator’s control. Applications’ combination is determined by various alarm information which means critical issues in order to operate a distribution system. Thus, this paper proposes an application management system which can configure application combination, control applications depending on alarm information and check their performance condition. The proposed application management system can be customized by operator easily and have high operation efficiency and reliability because it is worked by reviewed alarm information from operator.
Proceedings of the Korea Information Processing Society Conference
/
2016.04a
/
pp.567-570
/
2016
전력수요 예측은 설비투자, 수급 안정, 구매전력비 등에 직결되는 중요한 요소이며 국가 경제에 미치는 영향이 크다. 특히 인구가 밀집한 대도시의 경우 정치, 교육, 문화, 경제적 활동들이 전력사용과 밀접한 연관이 있어 안정적인 전력공급을 위한 정확한 전력수요 예측이 필요하다. 최근 평균기온 및 국내총생산을 독립변수로 활용하여 다중회귀모형을 구성한 연구가 전국 단위 전력수요 예측에 유용한 결과를 보여주었다. 하지만 좀 더 작은 단위 지역의 전력수요를 예측할 때에는 지역마다 제반 여건에 따른 전력사용 용도가 다르므로, 그 지역의 전력수요와 상관관계가 높은 다른 변수들을 함께 고려해야 할 필요가 있다. 본 논문은 서울시 자치구별 월 단위 전력수요 예측을 위하여 과거 전력수요량을 독립변수, 평균기온, 지역내총생산, 자치구별 인구, 세대수, 지하철 승 하차 인원을 종속변수로 설정한 다중회귀모형을 구성하였다. 이를 기반으로 다양한 실험을 통해 자치구별 월간 전력수요 예측을 진행하였으며, 그 결과 이전보다 향상된 정확도를 얻을 수 있었다.
This study proposes a new algorithm which performs a production simulation under various constraints and maintains computational efficiency. In order to consider the environmental and operational constraints, the proposed algorithm is based on optimization techniques formulated in LP form In the algorithm, "system characteristic constraints" reflect the system characteristics such as LDC shape, unit loading order and forced outage rate. By using the concept of Energy Invariance Property and two operational rules i.e. Compliance Rule for Emission Constraint, Compliance Rule for Limited Energy of Individual Unit, the number of system characteristic constraints is appreciably reduced. As a solution method of the optimization problem, the author uses Karmarkar's method which performs effectively in solving large scale LP problem. The efficiency of production simulation is meaningful when it is effectively used in power system planning. With the proposed production simulation algorithm, an optimal expansion planning model which can cope with operational constraints, environmental restriction, and various uncertainties is developed. This expansion planning model is applied to the long range planning schemes by WASP, and determines an optimal expansion scheme which considers the effect of supply interruption, load forecasting errors, multistates of unit operation, plural limited energy plants etc.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.19
no.2
/
pp.187-192
/
2019
Hybrid power storage system with emergency power function for demand management and power outage minimizes the investment cost in the building of buildings and factories requiring emergency power generation facilities, We propose a new business model by developing technology that can secure economical efficiency by reducing power cost at all times. Normally, system power is supplied to load through STS (Static Transfer Switch), and PCS is connected to system in parallel to perform demand management. In order to efficiently operate the electric power through demand forecasting, the EMS issues a charge / discharge command to the ESS as a PMS (Power Management System), and the PMS transmits the command to the PCS controller to operate the system. During the power outage, the STS is rapidly disengaged from the system, and the PCS becomes an independent power supply and can supply constant voltage / constant frequency power to the load side. Therefore, it is possible to secure reliability through verification of actual system linkage and independent operation performance of hybrid ESS, By enabling low-carbon green growth technology to operate in conjunction with an efficient grid, it is possible to improve irregular power quality and contribute to peak load by generating renewable energy through ESS linkage. In addition, the ESS is replacing the frequency follow-up reserve, which is currently under the charge of coal-fired power generation, and thus it is anticipated that the operation cost of the LNG generator with high fuel cost can be reduced.
With universality of e-commerce through internet, smaller online shopping malls are increased. A Smaller online shopping mall by nature lacks an extra space to load many inventory quantities. Therefore, it is difficult to response immediately with client request with traditional inventory management method. VMI has a character that supplier can control volume of inventory according to sales of seller. This paper proposes SOHO-VMI that is applied VMI into smaller online shopping mall. Proposed SOHO-VMI supports M $\times$ N structure can interact with multiple suppliers and sellers. And it uses XML/EDI for interaction with EDI documents use to legacy system. Also, This paper proposes logistics statistic prediction algorithm can adjust production and distribution volumes to supplier considering seller's product distribution information and seasonal factor.
Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
/
2003.10a
/
pp.340-345
/
2003
This study, as a basic study for establishing a influence forecasting/estimating model when drain the deep sea water to the ocean after using it, carried out studies as follows; 1) estimating the amount of river discharge and pollutant loads inflowing into the developing region of deep sea water in East Sea, Korea 2) a field observation of tidal current, vertical distribution of water temperature and salinity, and 3-D numerical experiment of tidal current to analysis physical oceanographic status. The amount of river discharge flowing into the study area was estimated about $462.6{times}10^{3}m^{3}/day$ of daily mean in 2002 year. annual mean pollutant load of COD, TN and TP were estimated 7.02 ton-COD/day, 4.06 ton-TN/day and 0.39 ton/day, respectively. Field observation of tidal current results usually show about $20{\sim}40cm/sec$ of current velocity at the surface layer, it indicated a tendency that the current velocity decreases under 20cm/sec as the water depth increases. We could find a stratification within approximately the depth of 30m in field observation area, and the depth increases. We could find a stratification within approximately the depth of 30m in field observation area, and the differences of water temperature and salinity between the surface layer and bottom layer were about $18^{\circ}C$ and 0.8 psu, respectively. On the other hand, we found that there was a definite as the water mass of deep sea water about 34 psu of salinity.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.