• Title/Summary/Keyword: Life-cycle Cost Evaluation

Search Result 202, Processing Time 0.026 seconds

ROADWAY PERFORMANCE EVALUATION USING FUNCTION ANALYSIS METHOD OF VALUE ENGINEERING

  • Jong-Hyun Park;Yong-Jang Lee;In-Su Jung;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1528-1533
    • /
    • 2009
  • Infrastructure is provided to the user through long-term project period and large-scale working expenses. Existing facilities are getting old as time goes by. Accordingly, proper maintenance is required and generally more maintenance cost than initial invested cost is needed during life cycle. Therefore, a specific plan that just increases the value of facilities is required by evaluating performance of facilities and inputting minimum maintenance cost. Value engineering that increases the value of object by systemically analyzing Life Cycle Costs and function is actively promoted at the design phase of construction. These efforts can increase the performance of facilities at the maintenance phase of infrastructure. This study is to search how to evaluate the performance of Roadway by utilizing function analysis, as a core part of VE in the maintenance phase. In order to this a new evaluation criteria were proposed by adding an evaluation items to the existing criteria through the research of old documents, status of roadway maintenance and function analysis of VE. The results of this study may promote the effective performance evaluation to determine a resolution of roadway congestion in future. A succeeding study using the proposed evaluation criteria will be required.

  • PDF

Whole Life Performance Bid Evaluation in the Korean Public Sector

  • Park, Kenneth Sungho;Lim, Hyoung-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.682-700
    • /
    • 2012
  • Over the last several years, Korea has increasingly adopted design-build for public construction projects. There is a much greater awareness of the need to change to a system based on 'Value for Money', which is high on the government's agenda. A whole life performance bid evaluation model is proposed to aid decision makers in the selection of a design-builder. This is based on the integration of a framework using an analytic hierarchy process, as the bid awarding system is being changed from one based on the lowest price to one based on best value over the life-cycle. Key criteria such as whole life cost, service life planning and design quality are important through the key stages of the evaluation process. The model uses a systematic and holistic approach, which enables the public sector client to make better decisions in design-builder selection, which will deliver whole life benefits based on long-term cost-effectiveness.

THE RESEARCH ON CONCEPTUAL MODEL OF LNG PLANT PROJECT PLANNING EXPERT SYSTEM

  • Moon-Sun Park;Young-Ai Kim;Seung-Wook Lee;Sung-Ryul Bae;Hyun-Wook Kang;Byoung-Jun Min;Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1570-1575
    • /
    • 2009
  • The purpose of this research is to propose the conceptual model of Scenario-based Project Planning Expert System which has not been used in domestic LNG plant industry. This research examines data on the plant project planning expert system of domestic and oversea, analyzes the components of project planning expert systems and benchmark excellent cases. The conceptual model of LNG plant project planning expert system is established through the procedure as has been noted above. The results of this research are as follows: First, this research draws out such components of LNG plant project planning expert system as feasibility, cost control, contract management and risk management. Second, this research proposes the conceptual model of LNG plant project planning expert system which core module is consist of feasibility evaluation, life cycle cost evaluation and decision making. Finally, each module of LNG plant project planning expert system would be integrated into the Scenario-based Project Planning Expert System.

  • PDF

Seismic effectiveness of tuned mass dampers in a life-cycle cost perspective

  • Matta, Emiliano
    • Earthquakes and Structures
    • /
    • v.9 no.1
    • /
    • pp.73-91
    • /
    • 2015
  • The effectiveness of tuned mass dampers (TMDs) in reducing the seismic response of civil structures is still a debated issue. The few studies regarding TMDs on inelastic structures indicate that they would perform well under moderate earthquake loading, when the structure remains linear or weakly nonlinear, while tending to fail under severe ground shaking, when the structure experiences strong nonlinearities. TMD seismic efficiency should be therefore rationally assessed by considering to which extent moderate and severe earthquakes respectively contribute to the expected cost of damages and losses over the lifespan of the structure. In this paper, a method for evaluating, in a life-cycle cost (LCC) perspective, the seismic effectiveness of TMDs on inelastic building structures is presented and exemplified on the SAC LA 9-storey steel moment-resisting frame benchmark building. Results show that the LCC concept may provide an appropriate alternative to traditional performance criteria for the evaluation of the effectiveness of TMDs and that TMD installation on typical existing middle-rise buildings in high seismic hazard regions may significantly reduce building lifetime cost despite the poor control performance observed under the most severe seismic events.

Development of a Successive LCC Model for Marine RC Structures Exposed to Chloride Attack on the Basis of Bayesian Approach (베이지안 기법을 이용한 해양 RC 구조물의 염해에 대한 LCC 모델 개발)

  • Jung, Hyun-Jun;Park, Heung-Min;Kong, Jung-Sik;Zi, Goang-Seup;Kim, Gyu-Seon
    • Journal of the Korea Concrete Institute
    • /
    • v.21 no.3
    • /
    • pp.359-366
    • /
    • 2009
  • A new life-cycle cost (LCC) evaluation scheme for marine reinforced concrete structures is proposed. In this method, unlike the conventional life-cycle cost evaluation performed during the design process, the life-cycle cost is updated successively whenever new information of the chloride penetration is available. This updating is performed based on the Bayesian approach. For important structures, information required for this new method can be obtained without any difficulties because it is a common element of various types of monitoring systems. Using the new method, the life-cycle maintenance cost of structures can be estimated with a good precision.

Life-Cycle Cost Analysis of Ballast Water Treatment System (LCC 분석에 의한 Ballast Water 처리 시스템의 경제성 평가)

  • Kim, Je-Eun;Kim, Soo-Young;Kim, Hyung-Man;Seo, Guan-Hui
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.42 no.6 s.144
    • /
    • pp.673-678
    • /
    • 2005
  • IMO adopted ' International Convention for The Control and Management of Ships' Ballast Water and Sediments ' on February 13th 2004. According to this convention, a ballast water treatment system should be installed in all ships obligatorily up to a standard date. When the system is installed, economic propriety should be considered. The economic propriety analysis examines the profit of a relevant project which can be presented by a equation, (Profit) = (income) - (expense) - (tax). However, the ballast water system is not for the profit during the life cycle but for the satisfaction of the regulation. Therefore, the expense should be minimum against the profit. This study presents the LCC(Life-Cycle Cost) analysis for economic evaluation of several ballast water system of foreign products.

Validating the Applicability of a Simplified Correlation Method for Economic Evaluation of Cooling Plants (냉방열원기기의 경제성 평가를 위한 간이계산법의 적용성 검토)

  • 김영섭;김강수
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.14 no.10
    • /
    • pp.854-862
    • /
    • 2002
  • In the previous research, a simplified correlation method was developed as an easy prediction tool for comparing energy use of cooling plants. The purpose of this paper is to test the applicability of this method for economic evaluation with two zones of a 20-story commercial building in Seoul. The results of this method were compared with the DOE-2 simulation and actual measured data. Then, Comparisons of life cycle cost were carried out for three types of cooling plants. Testing of one zone showed good agreement of within 10% error in cooling energy use and within 2% error in LCC. But testing of the other zone indicated that the use of this method were invalid when input variables were used beyond its valid range.

Seismic retrofit of a framed structure using damped cable systems

  • Naeem, Asad;Kim, Jinkoo
    • Steel and Composite Structures
    • /
    • v.29 no.3
    • /
    • pp.287-299
    • /
    • 2018
  • The purpose of this study is to investigate the effectiveness of damped cable systems (DCS) to mitigate the earthquake-induced responses of a building frame structure. The seismic performance of the DCS is investigated using the fragility analysis and life cycle cost evaluation of an existing building retrofitted with the DCS, and the results are compared with the structure retrofitted with conventional fluid viscous dampers. The comparison of the analysis results reveals that, due to the self-centering capability of the DCS, residual displacement approximately reaches to zero for the structure retrofitted with the DCS. The fragility analysis shows that the structure retrofitted with the DCS has the least probability of reaching the specific limit states compared to the bare structure and the structure with the conventional fluid viscous damper (VD), especially under the severe ground motions. It is also observed that both the initial and the life cycle costs of the DCS seismic retrofitting technique is lesser compare to the structure retrofitted with the VD.

The Economic Analysis on the Heating System Remodeling by the Life Cycle Costing in Permanent Rental Apartment (LCC 기법을 이용한 영구임대아파트 난방방식 리모델링에 대한 경제성분석 -유지관리비용을 중심으로-)

  • 박민용;장승재
    • Journal of the Korean housing association
    • /
    • v.15 no.1
    • /
    • pp.33-40
    • /
    • 2004
  • Considering the present development situation of rental apartment since 1982, the supply of rental housing for low-income dwellers has contributed a amount of quantities, but has been deficient qualities in housing policy. To propose the device of remodeling for low-income dwellers in deteriorated apartment, this study investigated the energy consumption of central heating system and the characteristics of maintenance cost in permanent rental apartment. The results of evaluation of alternative heating systems by Life Cycle Costing in permanent rental apartment were as follows; From Life Cycle 15∼20 years by Present Worth Method, the economic heating system of remodeling is central heating system (heat source: B-C oil), unit heating system(natural gas), central heating system(natural gas) in order.

A Study on the Analysis and Evaluation for the Life-cycle Model of Digital Content (디지털 콘텐츠 수명주기 모델 분석 및 평가에 관한 연구)

  • Kwak, Seung-Jin;Sung, Won-Kyung;Bae, Kyung-Jae
    • Journal of Information Management
    • /
    • v.42 no.1
    • /
    • pp.25-46
    • /
    • 2011
  • This study aims to identify the core life-cycle elements for archiving digital content through analyzing the existing digital content life-cycle models and suggest the remedies for management the digital content of KISTI after a comparative study. As a result, the 10 core life-cycle categories consisted of 31 small elements were defined. Furthermore, the recommendations that digital content archiving should be set as a critical mission and archiving policy should be prepared in KISTI were proved.