• Title/Summary/Keyword: Large delay

Search Result 915, Processing Time 0.029 seconds

Sparse Channel Estimation Based on Combined Measurements in OFDM Systems (OFDM 시스템에서 측정 벡터 결합을 이용한 채널 추정 방법)

  • Min, Byeongcheon;Park, Daeyoung
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.41 no.1
    • /
    • pp.1-11
    • /
    • 2016
  • We investigate compressive sensing techniques to estimate sparse channel in Orthogonal Frequency Division Multiplexing(OFDM) systems. In the case of large channel delay spread, compressive sensing may not be applicable because it is affected by length of measurement vectors. In this paper, we increase length of measurement vector adding pilot information to OFDM data block. The increased measurement vector improves probability of finding path delay set and Mean Squared Error(MSE) performance. Simulation results show that signal recovery performance of a proposed scheme is better than conventional schemes.

A Study on the Design of Embedded Web Server Application Module (임베디드 웹 서버 응용모듈 설계 연구)

  • 이양원
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2004.05b
    • /
    • pp.395-398
    • /
    • 2004
  • This paper describes the implementation of an internet-based servo-control system with novel direct internet control architecture which is insensitive to the inherent internet time delay. The servo control system can be controlled by using a PC provided at a local site. However, a large internet time delay may make some control inputs distorted. Moreover, since it is acted by the number of the internet nodes and loads, this delay is variable and unpredictable. This system consists of servo mechanism and Ethernet control adapter. Intention of this paper is to reduce the expenses, to manage effectively for plant and to increase the productivity through linking each plant of several factories by TCP/IP and Ethernet, and then many control plants and manager minimize the needed work. Experiments are partially fulfilled using the Labview and Matlab.

  • PDF

Linearity improvement of UltraScale+ FPGA-based time-to-digital converter

  • Jaewon Kim;Jin Ho Jung;Yong Choi;Jiwoong Jung;Sangwon Lee
    • Nuclear Engineering and Technology
    • /
    • v.55 no.2
    • /
    • pp.484-492
    • /
    • 2023
  • Time-to-digital converters (TDCs) based on the tapped delay line (TDL) architecture have been widely used in various applications requiring a precise time measurement. However, the poor uniformity of the propagation delays in the TDL implemented on FPGA leads to bubble error and large nonlinearity of the TDC. The purpose of this study was to develop an advanced TDC architecture capable of minimizing the bubble errors and improving the linearity. To remove the bubble errors, the decimated delay line (DDL) architecture was implemented on the UltraScale + FPGA; meanwhile, to improve the linearity of the TDC, a histogram uniformization (HU) and multi-chain TDL (MCT) methods were developed and implemented on the FPGA. The integral nonlinearities (INLs) and differential nonlinearities (DNLs) of the plain TDCs with the 'HU method' (HU TDC) and with 'both HU and MCT methods' (HU-MCT TDC) were measured and compared to those of the TDC with 'DDL alone' (plain TDC). The linearity of HU-MCT TDC were superior to those of the plain TDC and HU TDC. The experiment results indicated that HU-MCT TDC developed in this study was useful for improving the linearity of the TDC, which allowed for high timing resolution to be achieved.

Case Analysis on Application of Project Delay Analysis Method in Domestic Construction Project (국내 건설공사에서 공기지연 분석방법 적용 사례 분석)

  • Kim, Seon-Gyoo;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.98-106
    • /
    • 2019
  • Recently, the number of project delay-related claims and disputes in Korean construction projects has been increasing rapidly. This suggests that the domestic construction contract practice, which has traditionally been superior to the client, is changing into a mutually balanced relationship among the contracting parties. The project delay analysis selects the application method according to the type of schedule approved at the start of the construction and how the schedule management was performed during the construction. The most important prerequisite for project delay analysis is that a complete CPM schedule agreed at the beginning of the construction is prepared and the actual progress of such schedule is well documented. This study is about applying the project delay analysis methodology of a case where a contractor claims damages to a client while constructing a large new private building construction project. In this study, it is determined whether the application of the as-planned analysis method is appropriate to the incomplete CPM schedule and then proposes the as-planned vs. as-built analysis method based on the new standard as an alternative. Next, apply the as-planned vs. as-built analysis method to the schedule in the case project, and then compare it with the result of the as-planned analysis method. The purpose of this study is to suggest a project delay analysis method suitable for the domestic schedule management practices, so that it can be used as a meaningful reference in project delay disputes and litigations of domestic construction projects.

Comparative Analysis of Annual Tropospheric Delay by Season and Weather (계절과 날씨에 따른 연간 대류권 지연오차량 변화)

  • Lim, Soo-Hyeon;Kim, Ji-Won;Park, Jeong-Eun;Bae, Tae-Suk;Hong, Sungwook
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.37 no.1
    • /
    • pp.1-7
    • /
    • 2019
  • In this study, we estimated the tropospheric delay of GNSS (Global Navigation Satellite System) signals during passing through the atmosphere in relation to weather and seasonal factors. For this purpose, we chose four CORS (Continuously Operating Reference Station) stations from inland (CCHJ and PYCH) and on the coast (GEOM and CHJU). A total of 48 days for each station (one set of data for each week) were downloaded from the NGII (National Geographic Information Institute) and processed it using the scientific GNSS software. The average tropospheric delays in winter are less than 2,400 mm, which is about 200 mm less than those in summer. The estimated tropospheric delay shows a similar pattern from all stations except the absolute bias in magnitude, while a large delay was observed for the station located on the coast. In addition, the delay during the day was relatively stable in winter, and the average tropospheric delay was strongly related to the orthometric height. The inland stations have tropospheric delays by the precipitation rather than humidity due to dry weather and difference in temperature. On the contrary, it was primarily caused by the humidity on the sea. The correlation between temperature and water vapor pressure is 0.9 or larger for all stations, and the tropospheric delay showed a high linear relationship with temperature. It is necessary to analyze the GNSS data with higher temporal resolution (e.g. all RINEX data of the year) to improve the stability and reliability of the correlation results.

Performance of UWB Ranging in Multipath and Multiuser Environments (다중경로 다중사용자 환경에서의 초광대역 거리추정의 성능 분석)

  • Lee Joon-Yong;Yoo Sungyul
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.30 no.12C
    • /
    • pp.1125-1132
    • /
    • 2005
  • Ultra-wideband (UWB) ranging poses a set of time delay estimation problems for designers. The possibility of a large error can be a challenging problem for accurate ranging and positioning. An approximate analysis of large error performance of UWB ranging in multipath and multiuser environments is posed. Both analytical and experimental approaches are taken to evaluate the large error variance in a correlation-based serial search scenario.

Design of Robust Controller for Uncertain Large-scale Systems with Time-delays (시간지연을 갖는 불확정성 대규모 시스템의 강인 제어기 설계)

  • Lee, Hui-Song;Kim, Jin-Hun
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.49 no.1
    • /
    • pp.26-32
    • /
    • 2000
  • In this paper, we consider to robust controller design problem for the linear large scale systems with the uncertainties and the time-delays. The considered time-delays are that exist in the state and the input of the subsystems and the interconnected subsystems. And the considered uncertainties are two general types that exist in the system, input and interconnected matrices. Based on the linear matrix inequality(LMI) and Lyapunov theorem, we present sufficient conditions for the existence of a controller that guarantees the asymptotic stability of systems regardless of the uncertainties and the time-delays. Also, the controller can be easily obtained by checking the feasibility of the LMI's. Finally, we show the usefulness of our results by an example.

  • PDF

Performance Evaluation of Tree Routing in Large-Scale Wireless Sensor Networks (대규모 센서네트워크에서의 트리라우팅 성능평가)

  • Beom-Kyu Suh;Ki-Il Kim
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.18 no.2
    • /
    • pp.67-73
    • /
    • 2023
  • Tree routing is one of appropriate routing schemes in wireless sensor network because the complexity of this approach is relatively low. But, congestion at a specific node may happen because a parent node toward a sink node is usually selected in one hop way, specially where large number of node are deployed. As feasible solution for this problem, multiple paths and sinks schemes can be applied. However, the performance of these schemes are not proved and analyzed yet. In this paper, we conduct diverse simulaton scenarios performance evaluation for these cases to identify the improvement and analyze the impact of schemes. The performance is measured in the aspects of packet transmission rate, throughput, and end-to-end delay as a function of amount of network traffic.

Functionally Integrated Nonsaturating Logic Elements (기능상 집적된 비포화 논리소자)

  • Kim, Wonchan
    • Journal of the Korean Institute of Telematics and Electronics
    • /
    • v.23 no.1
    • /
    • pp.42-45
    • /
    • 1986
  • This paper introduces novel functionally integrated logic elements which are conceptuallized for large scale integrated circuits. Efforts are made to minimize the gate size as well as to reduce the operational voltage, without sacrificing the speed performance of the gates. The process used was a rather conventional collector diffusion isolation(CDI) process. New gate structures are formed by merging several transistors of a gate in the silicon substrate. Thested elements are CML(Current Mode Logic) and EECL (Emitter-to-Emitter Coupled Logic)gates. The obtained experimental results are power-delay product of 6~11pJ and delay time/gate of 1.6~1.8 ns, confirming the possibility of these novel gate structures as a VLSI-candidate.

  • PDF

Mixed $H_2/H_{\infty}$ Output Feedback Controller Design for PLL Loop Filter with Uncertainties and Time-delay (시간지연과 불확실성을 가지는 위상동기루프의 루프필터에 대한 혼합 $H_2/H_{\infty}$ 출력궤환 제어기 설계)

  • 이경호;한정엽;박홍배
    • Proceedings of the IEEK Conference
    • /
    • 2003.07c
    • /
    • pp.2589-2592
    • /
    • 2003
  • In this paper, a robust mixed H$_2$/H$\_$$\infty$/ output feedback control method is applied to the design of loop filter for PLL carrier phase tracking. The proposed method successfully copes with large S-curve slope uncertainty and a significant decision delay in the closed-loop that may exist In modern receivers due to a convolutional decoder or an equalizer. The objective is to design an output feedback controller which minimizes the H$_2$performance while satisfying the H$\_$$\infty$/ performance to guarantee the gain margin and phase margin for linear time invariant(LTI) polytopic uncertain systems. LMIs based approach is given to solve this problem. We can verify the H$\_$$\infty$/ performance satisfaction and minimize the phase detector error through the simulation result.

  • PDF