• Title/Summary/Keyword: Integrated Project Team

Search Result 63, Processing Time 0.022 seconds

A Study of Game Project Curriculum for Integrated Subject (통합교과로서의 게임 프로젝트 교육과정 운영방안 탐구)

  • Choi, Seung-Kwan
    • Journal of Korea Game Society
    • /
    • v.16 no.5
    • /
    • pp.111-122
    • /
    • 2016
  • The purpose of this study is to suggest an curriculum model of teaching scheme which performs team project learning based on Integrated project with different fields. To address this goal, the present study suggests a practical game project model under the same game-making circumstances as game industry by consisting of real case of convergence parts(game graphic, game design, game program). This project-based learning case has been conducting Integrated project education since 2008 in A educational Institute in Korea. The results of study suggest a standard of Integrated-based curriculum model and it is constructed with two parts. The first part is what students learned during project processing, such as responsibility, communication. The other part is how to construct the educational environment for integrated project. It explains how to organize and build teams, plan of integrated project, rule the role of team task, perform collaborative task, present interim/final presentation, evaluate grade. This study is expected to be utilized as a framework for the instructional design and the guideline for improving learner competency in team project learning.

COMPENSATION STRUCTURE AND CONTINGENCY ALLOCATION IN INTEGRATED PROJECT DELIVERY SYSTEMS

  • Mei Liu;F. H. (Bud) Griffis;Andrew Bates
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.338-343
    • /
    • 2013
  • Integrated Project Delivery (IPD) as a delivery method fully capitalizes on an integrated project team that takes advantage of the knowledge of all team members to maximize project outcomes. IPD is currently the highest form of collaboration available because all three core project stakeholders, owner, designer and contractor, are aligned to the same purpose. Compared with traditional project delivery approaches such as Design-Bid-Build (DBB), Design-Build (DB), and CM at-Risk, IPD is distinguished in that it eliminates the adversarial nature of the business by encouraging transparency, open communication, honesty and collaboration among all project stakeholders. The team appropriately shares the project risk and reward. Sharing reward is easy, while it is hard to fairly share a failure. So the compensation structure and the contingency in IPD are very different from those in traditional delivery methods and they are expected to encourage motivation, inspiration and creativity of all project stakeholders to achieve project success. This paper investigates the compensation structure in IPD and provides a method to determine the proper level of contingency allocation to reduce the risk of cost overrun. It also proposes a method in which contingency could be used as a functional monetary incentive when established to produce the desired level of collaboration in IPD. Based on the compensation structure scenario discovered, a probabilistic contingency calculation model was created by evaluating the random nature of changes and various risk drivers. The model can be used by the IPD team to forecast the probability of the cost overrun and equip the IPD team with confidence to really enjoy the benefits of collaborative team work.

  • PDF

A Case Study on Resident Participative Primary Design of Integrated Rural Development Project with Master Planner - Onui Area in Hong Seong - (총괄계획가 시범사업에서 주민참여 기본계획 사례연구 - 홍성 오누이권역을 대상으로 -)

  • Jung, Nam Su
    • Journal of Korean Society of Rural Planning
    • /
    • v.21 no.4
    • /
    • pp.167-175
    • /
    • 2015
  • The aim of this study is to establish resident-participative primary design of integrated rural development project with master planner by setting principals of open competition and transparent decision-making about village-to-village or business-to-business unit enterprise in Onui area, Hong-seong Gun. For effective processing, software projects such as residents education and rural landscape planning are simultaneously conducted for enhancing project understanding and comprehensive development plan including related post project. Above all, competition teams for individual project were organized to establish the resident-participative primary design using survey tables of residents demand. In 6 months resident-participative processing of primary design, continuous education and visiting to advanced area are conducted in team unit. Strengthened ability of team unit can be used in management and maintenance after project development. To do this, residents with the same opinions gathered as one competition team and identified business plans such as village asset, business location, size, program, and method for land securing. Favorable decision-making process by residents who are audience in project presentation of competition team has conducted. After selecting competition teams, continuos consulting are operated for establishing operation and management for developed or remodeled facilities through repetitive education and visiting advanced area. In this process, unit project suggested by competition team are completed. Preliminary selection was conducted by experts who were entrusted by residents. After residents agreement of project main stream such as major facilities and location, final detailed cost of projects are work out. Suggested process in this study which choose the final project by residents would improve residents' voluntary participation in integrated rural development project through open competition in establishing primary design.

A Study on the Application of an Integrated Management Software for a Petrochemical Plant Project (화공플랜트 프로젝트에서 통합관리 소프트웨어 적용에 관한 연구)

  • Kim, Yoon;Lee, Dong-Eon;Yoo, Ho-seon
    • Plant Journal
    • /
    • v.6 no.2
    • /
    • pp.56-61
    • /
    • 2010
  • In this paper, an integrated management software is developed to promote the business competitive power. The interoperability among the software accounts for an ever growing performance of petrochemical plant project. If the interoperability is built up, company has taken advantages of quality, schedule, cost, and safety by active communication. The advantage of an integrated management software is examined in three aspects. In efficiency aspect, It takes advantage of the saving about the various information and the standard of project performance procedure. In quality, the integration gave aid to a quality improvement through team collaboration and data management within project life cycle. In cost, poor communications between systems waste 30% of project costs. If information could be inputted once and used by all, reductions in delivery time up to 40% were possible. Therefore, 10% savings of engineering cost was also possible.

  • PDF

Introduction of Integrated Management of Satellite Imagery Information

  • Chae, Gee-Ju;Yoon, Geun-Won;Hwang, Tae-Hyun;Park, Jong-Hyun
    • Proceedings of the KSRS Conference
    • /
    • 2002.10a
    • /
    • pp.197-201
    • /
    • 2002
  • The high prices of satellite images prevent researchers from studying remote sensing and most non-professional people doesn't have the simple and easy solutions for the manipulation of satellite images. "Integrated Management of Satellite Imagery Information" project which will be promoted by ETRI (Electronics and Telecommunications Research Institute) will provide the solutions for the above mentioned problems. We will introduce the archiving center in this study. This includes the data construction, storage, management and distribution. We first review the background for this archiving center and introduce the interior and foreign institutes which archive and distribute satellite images. We review our H/W system and S/W system briefly. Finally, the further service of our project will be suggested. Since we will distribute the satellite images (Landsat, SPOT, JERS, Corona, Kompast-1) and will receive Landsat7 ETM+ in 2003 you, this will help the professional work dealing with the satellite image and attract the non-professional people for simple and easy manipulation solutions of satellite image.

  • PDF

A New Model on Integration of Feasibility Estimates for Designing FEIT System in R & D Project (R & D 프로잭트의 Feasibility 추정 시스템설계를 위한 추정치 종합화 모형의 구축)

  • 권철신
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.15 no.1
    • /
    • pp.47-61
    • /
    • 1990
  • The purpose of this study is to construct a new model named Communication Consensus Value Weighted (CCVW) model based on inter-personal technical communication within a project team, and to design Feasibility Estimates Integrated Terminal System (FEITS) which is a subsystem of R & D Project Planning System/System Alternatives Feasibility Estimation System (RDPPL/SAFES) using the model as a key function for feasibility estimation in that system. This new model aims to integrate technical feasibility estimated by several estimators in the lowest level as the project work breakdown structure which is the indentical conception of a terminal system in RDPPL. The process to obtain the feasibility estimate integrated is presented in this paper.

  • PDF

Qualitative Analysis of IT fused Mentorship Project Performance with Gifted Secondary Students in Information Science Class (정보 영재반 중학생들의 IT 융합 사사 프로젝트 수행에 관한 질적 분석)

  • Jun, Youngcook
    • The Journal of Korean Association of Computer Education
    • /
    • v.19 no.4
    • /
    • pp.45-58
    • /
    • 2016
  • This paper tried to analyze cases of one year team-based project of gifted students who spent two year programs in a math-IT integrated class as part of formative evaluation and extracted the factors associated with future enhancement for the program. The researcher as an advisory professor tried to guide the students as minimally as possible considering their levels of IT skills so that they could self-directedly perform the IT-fused project on a team basis. The data collection included documents, annual report, photos, video, artifacts and interview data with the students for the whole team project carried out between February and December, 2015. The overall pattern of the project activities has been stabilized in the middle of the course compared to the initial stages of brainstorming and design work even though the students revealed the differences of their programming skills and preferences toward the project theme. Their project outcomes were qualitatively analyzed according to the 9 steps of R&E model and has shown individual differences according to low, middle and high level. At the end, the analysis suggested several implications for further improvement of the mentorship program.

Multitasking Façade: How to Combine BIPV with Passive Solar Mitigation Strategies in a High-Rise Curtain Wall System

  • Betancur, Juan
    • International Journal of High-Rise Buildings
    • /
    • v.6 no.4
    • /
    • pp.307-313
    • /
    • 2017
  • This paper outlines the processes and strategies studied and selected by the team during the design stages of the project for the incorporation of BIPV into the tower's façade. The goal was to create a system that helps reduce internal heating and cooling loads while collecting energy through photovoltaic panels located throughout the building. The process used to develop this façade system can be broken down into three stages. 1. Concept: BIPV as design catalyst for a high-rise building. 2. Optimization: Balancing BIPV and Human comfort. 3. Integration: Incorporating BIPV into a custom curtain wall design. The FKI Project clearly illustrates the evolution building enclosures from simple wall systems to high performance integrated architectural and engineering design solutions. This design process and execution of this project represent the design philosophy of our firm.

Architectural Design Process by the Changes of Sustainable Design Guidelines of Public Project (공공프로젝트 친환경 설계지침의 변화에 따른 건축설계프로세스 연구)

  • Tae, Yeong-Ran
    • Journal of the Korean Solar Energy Society
    • /
    • v.30 no.4
    • /
    • pp.63-70
    • /
    • 2010
  • This study introduce a architectural design process by the changes of sustainable design guidelines in public project. First of all, this study examines existing integrated design process studies performed by Rhee & U.B.C. Also, this study examines sustainable guidelines which demanded by public building projects. Then, this study introduces sustainable design process using existing sustainable design process, and shows that how to operate and proceed integrated design to satisfy the sustainable guidelines in practice. The results of this study are as follows. (1) Since 2007, sustainable design guidelines of bidding projects have been highlighted. (2) In public buildings, energy saving is very important issue. Especially energy certification demands 1st degree(under $300kWh/m^2{\cdot}yr$). (3) Inp ractice, integrated design team performed sustainable design using the sustainable design process to improve sustainable in public buildings.

A Comprehensive Framework for Estimating Pedestrian OD Matrix Using Spatial Information and Integrated Smart Card Data (공간정보와 통합 스마트카드 자료를 활용한 도시철도 역사 보행 기종점 분석 기법 개발)

  • JEONG, Eunbi;YOU, Soyoung Iris;LEE, Jun;KIM, Kyoungtae
    • Journal of Korean Society of Transportation
    • /
    • v.35 no.5
    • /
    • pp.409-422
    • /
    • 2017
  • TOD (Transit-Oriented Development) is one of the urban structure concentrated on the multifunctional space/district with public transportation system, which is introduced for maintaining sustainable future cities. With such trends, the project of building complex transferring centers located at a urban railway station has widely been spreaded and a comprehensive and systematic analytical framework is required to clarify and readily understand the complicated procedure of estimation with the large scale of the project. By doing so, this study is to develop a comprehensive analytical framework for estimating a pedestrian OD matrix using a spatial information and an integrated smart card data, which is so called a data depository and it has been applied to the Samseong station for the model validation. The proposed analytical framework contributes on providing a chance to possibly extend with digitalized and automated data collection technologies and a BigData mining methods.