• 제목/요약/키워드: Installation Costs

검색결과 380건 처리시간 0.027초

대학건물의 전력소비패턴 분석을 통한 태양광, ESS 적정용량 산정 및 경제적 효과 분석 (Calculation of Photovoltaic, ESS Optimal Capacity and Its Economic Effect Analysis by Considering University Building Power Consumption)

  • 이혜진;최정원
    • 한국산업융합학회 논문집
    • /
    • 제21권5호
    • /
    • pp.207-217
    • /
    • 2018
  • Recently, the importance of energy demand management, particularly peak load control, has been increasing due to the policy changes of the Second Energy Basic Plan. Even though the installation of distributed generation systems such as Photovoltaic and energy storage systems (ESS) are encouraged, high initial installation costs make it difficult to expand their supply. In this study, the power consumption of a university building was measured in real time and the measured power consumption data was used to calculate the optimal installation capacity of the Photovoltaic and ESS, respectively. In order to calculate the optimal capacity, it is necessary to analyze the operation methods of the Photovoltaic and ESS while considering the KEPCO electricity billing system, power consumption patterns of the building, installation costs of the Photovoltaic and ESS, estimated savings on electric charges, and life time. In this study, the power consumption of the university building with a daily power consumption of approximately 200kWh and a peak power of approximately 20kW was measured per minute. An economic analysis conducted using these measured data showed that the optimal capacity was approximately 30kW for Photovoltaic and approximately 7kWh for ESS.

엑셀 기반의 LCC 평가도구 개발 (The development of LCC evaluation tool on Excel Base)

  • 정광우;김철수;안준용;정종덕
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1630-1641
    • /
    • 2010
  • LCC can be defined as "the sum of present values of investment costs, capital costs, installation costs, energy costs, operating costs, maintenance costs, and disposal costs over the life-time of the project, product, or measure." LCCA involves estimating the costs and timing associated with each alternative over a selected analysis period and conversion of those costs to economically comparable values considering the time-value of money. The several Excel-Based LCC tools found on the internet are described in this paper. Also, This paper performed an analysis of the existing LCC commercial tools, assessing various aspects of each program. The goal was to evaluate the best features of each tool and to identify the requirements for LCC evaluation of Urban Transit Vehicle. The LCC tools are developed to address problems in many different areas and a tool developed and structured for one area cannot generally be used in another area. No general LCC tool exists and if one is needed for Urban Transit Vehicle it has to be developed by the project. Since a full LCC can be very complex it is likely that this Excel-Based LCC tool should be a small and simple tool for quick cost estimates. This paper presents a LCC tool consisting of eight excel sheets, which are "Project", "CBS", "PBS", "PM", "CM", "Others", "LCC Result" and "Diagram".

  • PDF

음식물 자원화시설의 설치·운영에 대한 일반현황의 평가 및 개선 방안 (Evaluation and Improvement Measures on the Status of the Installation and Operation of Facilities for Recycling Food Waste into Resources)

  • 류지영;공규식;신대윤;배재근
    • 유기물자원화
    • /
    • 제12권3호
    • /
    • pp.63-75
    • /
    • 2004
  • 본 연구는 자원화시설 중에서 공공자원화시설을 대상으로하여 시설의 설치에 있어서 일반항목으로 분류되는 설치현황, 운영현황을 파악하여 문제점을 제시하고, 개선방안을 도출하기 위하여 수행되었다. 현재 설치되어 있는 시설은 퇴비화>사료화>혐기성>하수병합>퇴비사료병합으로서 사료화보다 퇴비화가 많은 것은 초기에 사료화방법으로 설계했으나, 수요처의 미확보로 퇴비화의 시설로 전환한 것 때문으로 추측되었다. 아직까지 사료관리법 및 비료관리법에 의하여 생산업등록을 하지 않은 곳이 다수 있었으며, 음식물쓰레기 자원화시설이 각종 기초시설과 같은 입지를 사용하면서도 침출수 및 악취, 에너지 측면에서 연계처리를 하는 곳이 적었다. 현재 설치되어 있는 일부의 자원화시설은 7년이 경과, 노후되어 있는 것으로 조사되었으며, 시설을 운전하는 전문인력 부족 등으로 인하여 년간 300일 이상의 정상운전 이루지지 않고 있는 시설이 많은 것으로부터 주기적인 소수선, 대수선 필요한 것으로 조사되었다. 음식물쓰레기 처리는 전체 처리시설에서 계획량 대비 약 87%의 반입율을 보여주고 있어 계획처리용량의 처리를 위한 대책마련이 필요한 것으로 판단되었다. 자원화시설의 설치비용을 조사한 결과, 50톤 미만에서 1억을 상회하는 곳이 다수 관찰되었으며, 50톤 이상에서 낮은 설치비용을 보였다. 전체적으로 적게는 1-2천만원, 높게는 2억원/톤까지 조사되어 시설기준의 정비와 함께 자원화시설의 설치비용에 대한 산출기준의 마련이 시급한 것으로 판단된다. 운영비가 시설의 규모 및 처리방법에 따라서 많은 차이가 있는 것으로 운영비의 합리화를 위한 노력이 필요하며, 시설의 설치와 운영에서 경제성을 확보할 수 있는 적정 처리 규모의 계획이 중요한 것으로 확인되었다.

  • PDF

The Development of a Flood Protection System for Pad Transformers Using Pneumatic Pressure in Areas Prone to Floods

  • Kim, Gi-Hyun;Lee, Jae-Yong;Bae, Suk-Myong
    • 조명전기설비학회논문지
    • /
    • 제24권3호
    • /
    • pp.27-32
    • /
    • 2010
  • The inundation of substation and ground power equipment breaks out every summer season in low-lying downtown areas and low-lying shores by torrential rain, typhoons and tsunamis. It has, in turn, caused replacement, social and economic costs for blackouts. For activity management regarding flood damage we produced a flood protection system which using the Pad transformer as a basic frame and is developed using pneumatic pressure. We tested safety concerns including insulation resistance and current leakage first for water tank flooding and, second, by an empirical test through supplying 22.9[kV]. We estimate that costs associated with flooding and power failure can be diminished by these advances toward creating a more reliable system.

기기 수명을 고려한 배전계통 커패시터의 설치 계획 (Optimal Capacitor Placement in a Distribution System Considering Lifetimes of Devices)

  • 박종영;박종근
    • 전기학회논문지
    • /
    • 제57권2호
    • /
    • pp.164-171
    • /
    • 2008
  • This paper proposes the planning method for placement of capacitors in a distribution system. The main objectives in the planning for capacitor allocation are the reduction of installation costs and electric power loss. In the proposed method, the life time of each device is considered in calculating installation costs, and the optimal operation status of devices is found by genetic algorithm. Then, the optimal numbers and locations are determined based on the optimal operation status. Simulation results in the 69-bus distribution system show that the proposed method performs better than conventional methods.

분산형전원 연계용량 증가를 위한 배전계통 운영방식에 관한 연구 (A Study on the Operation of Distribution System for Increasing Grid-Connected Distributed Generation)

  • 남궁원;장문종;이성우;서동완
    • 조명전기설비학회논문지
    • /
    • 제28권9호
    • /
    • pp.83-88
    • /
    • 2014
  • When DG interconnection into network is examined, details of the review are overvoltage, protective device malfunction, etc. In the case of protective device malfunction, replacing protective device into bi-directional protective device and installation NGR are the solution. Overvoltage at interconnection point occurs because the load is relatively less than DG output. When overvoltage at interconnection point occurs, DG interconnection is not permitted because this overvoltage affect other customers. Interconnection by installation new distribution line is one solution but it costs much money. Without installation new investment, change of NOP(Normal Open Point) position is a possible solution about DG interconnection into network.

입도에 따른 지오그리드의 시공손상계수 산정 (Evaluation of Installation Damage Factor for Geogrid with Particle Size)

  • 임성윤;송창섭
    • 한국농공학회논문집
    • /
    • 제52권3호
    • /
    • pp.113-120
    • /
    • 2010
  • Reduction factor for installation damage required to calculate design strength of geogrid used in MSEW(mechanically stabilized earth wall) design is usually obtained in the field test simulating real construction condition. However, damages occurred in geogrid during backfill work are influenced by many factors such as polymer types, unit weight per area, backfill construction method and gradation of backfill material and field test considering these factors demand lots of time and costs. In this study, factors affecting installation damage are analyzed and empirical method to evaluate reduction factor for installation damage using maximum particle size in backfill material is suggested.

분산전원을 포함한 배전계통에서 설치비용과 유지보수 비용을 고려한 병렬 캐패시터-리액터 Bank의 최적 설치 위치 선정 (Optimal Allocation of Shunt Capacitor-Reactor Bank in Distribution System with Dispersed Generators Considering Installation and Maintenance Cost)

  • 허재행;류재근;이우리;박종영;박종근
    • 전기학회논문지
    • /
    • 제62권11호
    • /
    • pp.1511-1519
    • /
    • 2013
  • This paper proposes the allocation method for capacitor-reactor banks in a distribution system with dispersed generators to reduce the installation costs, the maintenance costs and minimize the loss of electrical energy. The expected lifetime and maintenance period of devices with moving parts depends on the total number of operations, which affects the replacement and maintenance period for aging equipment under a limited budget. In this paper, the expected device lifetimes and the maintenance period are included in the formulation, and the optimal operation status of the devices is determined using a genetic algorithm. The optimal numbers and locations for capacitor-reactor banks are determined based on the optimal operation status. Simulation results in a 69-bus distribution system with the dispersed generator show that the proposed technique performs better than conventional methods.

내부고장을 고려한 고온형 연료전지 대규모 발전단지의 병렬운전 변압기 적정 뱅크수에 관한 연구 (A Study on the Proper Number of Banks of Parallel Operation of Transformer in Large-scale Power Plants Using the High Temperature Fuel Cell Considering the Internal Failure)

  • 정영환;채희석;성인제;김재철
    • 조명전기설비학회논문지
    • /
    • 제28권3호
    • /
    • pp.26-31
    • /
    • 2014
  • High temperature fuel cell system, such as molten carbonate fuel cells(MCFC) and solid oxide fuel cells(SOFC), are capable of operating at MW rated power output. The power output change of high temperature fuel cell imposes the thermal and mechanical stresses on the fuel cell stack. To minimize the thermal-mechanical stresses on the stack and increase the systems reliability, we should divide the power plant configuration to several banks. However, the improvement of reliability in fuel cell power plant system causes an increase of the investment cost, for example, replacement costs, labor costs, and so on. For this reason - the balance between investment and reliability improvement - many studies about the appropriate level of investment have been conducted. In this paper, we evaluate the cost for operation and installation, the benefit for electric energy and thermal energy sales, and the system reliability for several cases : these cases relate with the bank configuration.

345kV 승압용 변전소의 뇌격에 의한 이상전압 해석 (Analysis of Transient Voltage by Lightning Stroke at 345kV Step-up Transformer)

  • 조만영;신호전;허재선;김재철
    • 조명전기설비학회논문지
    • /
    • 제26권10호
    • /
    • pp.95-101
    • /
    • 2012
  • Typically, large scale power generation facilities are linked to 345kV transmission line through a step-up transformer. If the value of transient voltage by generating lightning stroke is large more than electric equipment's BIL, devices insulation is destroyed. LA(Lighting Arrester) is used as a main means of prevention. However, the installation of LA takes the constraints of installation place and expensive installation costs. Therefore, we need to carefully study whether installation of installation can be omitted and the most efficient place of installation. In this paper, we simulated the transient voltage detected by lightning stroke at each equipments in the 345kV transmission power grid by using EMTP-RV program.