• 제목/요약/키워드: Information construction

검색결과 9,099건 처리시간 1.27초

건설기계 정보화시스템 구축을 위한 운행기록장치 활용방안 (Study on Utilization of Digital Tacho Graph in Construction Machinery Information Systemm)

  • 윤겸주;이승철
    • 자동차안전학회지
    • /
    • 제8권2호
    • /
    • pp.17-23
    • /
    • 2016
  • Construction of our machine "Digital Tacho Graph" toghether with development and intergrated management system information is attached under Traffic Safety Law in article submission. This machine "Digital Tach Graph" has been mandated on a priority basis. The entire machine is constructed with specialised components to collect data that can retrive basic information. To obtain the components to perfect the information to optimize the device and system.

건설공사 설계도서매뉴얼의 전자화 절차구성 및 실무 적용효과 분석 (Procedure Development for Organizing Electronic Technical Manual of Construction Design Information and Applicability Analysis for Practical Project)

  • 강인석;문현석;곽중민
    • 한국철도학회논문집
    • /
    • 제10권2호
    • /
    • pp.103-111
    • /
    • 2007
  • The existing design materials by document type are restricted in searching and acquiring necessary design information because the materials consist of huge information and various document types. This study suggests a methodology to develop an electronic technical manual that can manage construction design materials by XML-base integrated information system. Electronic technical manual for design materials can provide visualized information through various multimedia tools such as multi-link, virtual reality and animation. Using an integrated electronic manual for construction project can prevent to miss necessary design information. The results of this study includes a data flow diagram to develop an interactive electronic technical manual (IETM) for construction design information. Finally the study suggests some scenarios for practical use and quantitative analysis of application effect analysis by AHP method.

팔달문 건설의 소요자원 산정을 위한 화성성열의궤 분석 (Analysis of the HwaSungSungYoukEuGye for Estimating the Resources of PalDal-Mun Construction)

  • 김균태
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 산업계
    • /
    • pp.1-6
    • /
    • 2009
  • The HwaSungSungYouk is one of the construction project in viewpoint of today's construction management and various information how to build the HwaSung at the last of the eighteen century had been recorded in HwaSungSungYoukEuGye. The purpose of this study is to analyse the data in HwaSungSungYoukEuGye in viewpoint of today's construction management for estimating the resources of PalDal-mun construction. In the record, there are a 10t of information relate to time management, cost management and human resource management, and the concept of modern construction management will be also use to figure out the construction data of the HwaSungSungYoukEuGye.

  • PDF

건설현장의 위험구역 설정을 통한 안전 사고 예방 IoT Cone 시스템 개발 기초 연구 (Preliminary study for development of safety accident prevention IoT(Internet of Things) Cone system through dangerous area setting in construction site)

  • 류한국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.76-77
    • /
    • 2018
  • Under industry 4.0, Internet of Things (IoT) is advancing a new breed of smart manufacturing environment. However IoT has not been widely applied in construction industry compared with manufacturing environment. IoT enables operational systems that deliver more accurate and useful information for managing construction accidents. IoT enables operational systems that deliver more accurate and useful information for managing construction accidents. In order to apply well IoT for construction safety management, as a preliminary study, this paper presents e safety accident prevention IoT Cone system through dangerous area setting in construction site.

  • PDF

Top-down 공법 현장에서 엘리베이터 코어월 정밀 시공을 위한 시공 BIM의 적용 사례 연구 (Case Study of the Field-BIM for Precision Construction of Elevator Core Wall in Top-down Project)

  • 심학보;석원균;박순전
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.108-109
    • /
    • 2019
  • Top-down construction is a useful method of utilizing the working space, economic benefits and shorten the construction period. Precision construction of the elevator core is very important for safety of the top-down structure. In this study, the layout system for the field-BIM(Building Information Modeling) was used to precisely construct the elevator core in the basement and the ground. Through the layout system, it was possible to process the construction status, review the design results and construction errors, and confirm whether there is or not within the construction error range for elevator installation.

  • PDF

특허 분석에 의한 발주자용 중.소규모 현장 비대면 건설사업관리 UI개발 (Development of Non-face-to-face Small and Medium-Sized Construction Project Management UI for Owners through Analyzes construction project management-related patents)

  • 강상찬;장명훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 가을 학술논문 발표대회
    • /
    • pp.67-68
    • /
    • 2020
  • Real-time information on the construction project required by the owner make the project's transparency and overall productivity will be improved. This study analyzes domestic and foreign patents for construction project management to identify trends in technology development, construct cloud-based construction project management system solution UI, and proposes functions and services for each module. Trend research is conducted through patent search, and the analysis is divided into quantitative analysis which means quantitative statistics and qualitative analysis which means the technical contents of each patent. The construction project management system solution is based on smart devices at small and medium-sized sites, allowing both the owner and the construction personnel to share information.

  • PDF

Developing a 3D BIM for Earthwork Construction

  • Moon, Sungwoo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.245-247
    • /
    • 2015
  • The Building Information Model (BIM) is gaining wide popularity in the construction industry. This attempt is, however, limited to a predefined operation of structural facilities. The application of BIM can be extended to include undefined operations in earthwork construction. The objective of this paper is to introduce the concept of an earthwork BIM environment that is currently under development in the Construction System Laboratory at Pusan National University. First, this paper defines the concept of earthwork BIM. Second, it discusses the key aspects of earthwork BIM, including 1) geographical information, 2) equipment configuration, and 3) equipment position. In the future, the 3D BIM environment will be tested at an actual construction site to determine its applicability, and it will be extended to include construction equipment such as bull dozers and pay loaders.

  • PDF

효율적인 자산관리를 위한 건설정보 이양요건 평가 (Evaluation of Handover Requirements of Construction Information for Efficient Facility Management)

  • 이익행;정영수
    • 한국건설관리학회논문집
    • /
    • 제19권4호
    • /
    • pp.12-20
    • /
    • 2018
  • 최근 시설이 대형화, 복합화, 첨단화됨에 따라 건축물 운영단계에서 수행되는 자산관리 업무의 중요성이 대두되고 있으며, 이에 따라 자산관리 업무의 범위가 확대되고, 요구 정보가 증가하고 있다. 그러나 건설 생애주기 단계 간 업무 중첩, 협업 배제 등으로 인한 비효율적인 정보교환이 이루어지며, 이로 인해 비용 손실이 발생된다. 이러한 생애주기 간 낮은 정보호환성 문제는 전 생애주기 관점의 건설 정보관리를 통해 보완할 수 있다. 각 생애주기 단계 참여자의 건설정보 관리는 발주자의 건설정보 이양요건을 통해 구체화된다. 이에 본 연구는 발주자 관점의 자산관리 개념 정리와 생애주기 간 정보호환성 개선을 목적으로, 자산관리의 유형분류, 자산관리 업무기능, 그리고 건설정보 이양요건 항목의 가치 평가방법론을 제시하였다. 본 연구의 방법론을 이용하여 시공자가 발주자에게 제공하는 '인수인계 항목'을 발주자의 이양요건으로 참조하여 평가하였다. 그 결과 건축물 정보, 도면 등의 순서로 가치 순위가 도출되었다. 본 연구를 통하여 사업 초기단계에서 발주자의 건설정보 이양요건 도출, 그리고 정보이양(Information Handover)의 성과측정을 위한 기초자료로써 활용될 수 있다.

가상 건설 시스템 개발 현황과 비전 (The Present Status and Vision of Virtual Construction System Development)

  • 김재준;최철호;신현목;진상윤;이광명
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.170-175
    • /
    • 2008
  • 가상건설시스템 개발연구단은 국토해양부와 한국건설교통기술평가원의 지원 하에 설립되었다. 본 연구단은 건설프로젝트의 생산성 향상, 고 부가가치 사업 창출, 해외건설시장에서의 경쟁력 확보라는 목표를 가지고 연구를 수행 중에 있다. 가상건설 시스템은 건축물의 전 생애주기에서 발생되는 정보를 효과적으로 공유할 수 있도록 3D 및 정보 기반의 설계, 엔지니어링, 건설관리 업무를 지원하게 된다. 위의 목표를 달성하기 위해서 연구단은 가상건설시스템 하위에 다양한 기능을 수행하는 모듈들을 개발하는 데에 연구의 초점을 맞추고 있다. 첫째, 3D 기반 구조 설계 설비 및 견적시스템 개발이다. 둘째, 가상현실 기법을 활용한 기획단계에서의 프로세스 시뮬레이션 및 사업성 분석 시스템 개발이다. 셋째, 건설프로젝트에서 다루어지는 모든 정보를 관리할 수 있는 CPLM(Construction Project Life-cycle Management)을 개발하는 것이다. CPLM은 3D 기술과 정보 기반 협업을 통한 의사결정 지원 시스템이다. 이와 같은 본 연구단의 최종목표에 도달하기 위하여 2차 년도에 가상건설 프로토타입 시스템을 개발 완료하였고, 3차 년도 가상건설 시스템의 각 모듈 완성 및 시스템 통합을 목표로 연구를 진행하고 있다. 본 연구는 향후 건설산업에서 필수개념으로 자리잡게 될 BIM의 국가적 차원의 연구라는 점에서 시사하는 바가 크다고 할 수 있다.

  • PDF

고속철도 횡단 강거더 설치공사에서의 BIM 기반 가상건설 장비운영 시뮬레이션의 적용 (BIM-Based Virtual Construction Simulation for Steel Girder Installation Crossing the High-Speed Railway)

  • 박준원;이상호;김성훈;원정훈;윤영철
    • 한국안전학회지
    • /
    • 제33권2호
    • /
    • pp.76-85
    • /
    • 2018
  • The interest in the Building Information Modeling (BIM) technology has risen remarkably due to the effects on construction work period reduction, cost reduction, work safety improvement, and other factors. In civil engineering field, BIM applications mainly focus on data modeling and virtual construction. In this study, we present the BIM-based virtual construction and analyze the effects of BIM for the railway facilities so that the conventional approach to the equipment operation plan can be improved in order to prevent safety accidents which can result from unclear information during the operation plan. The BIM-based virtual construction technology is applied to establish the construction plan for the site with constraints, the installation of steel girder needs to be completed, avoiding interference with the existing high-speed railway operation within a given limited time. A virtual construction model consisting of topography, structures, equipments, and avatar was built and more detailed model, including safety guard rails, was then created. Specifications of the construction equipment were input as a database, and the virtual construction model was manipulated in the equipment operation planning. Through the BIM-based virtual construction, including the verification of alternative construction method, 311 million won was saved and the construction period was shortened by 87 days compared to the original plan. In addition, it was shown that the interest and participation of the construction workers can be increased by providing the 3D virtual scene for real construction work and various safety hazards occurring during equipment operation can be effectively removed in advance by the interactive worker education.