• 제목/요약/키워드: Industrial Design Engineering

검색결과 5,500건 처리시간 0.029초

Pick to Light 오더피킹시스템의 존 배치 방법이 피킹 생산성에 미치는 영향 (The Impact of Picking Performance by the Zone Arrangement Method in Pick to Light Order Picking System)

  • 유강철;신재천;심호섭;최종수;최춘호;김하곤;김부열;강경식
    • 대한안전경영과학회지
    • /
    • 제12권3호
    • /
    • pp.207-214
    • /
    • 2010
  • The picking process in distribution center is one of the most difficult and time-consuming process. The improvement of picking productivity is a core element which decides efficiency of the distribution center. The time to shipping on vehicles from receiving depends on the arrangement of items or picking methods. The Pick to Light system typically is used to improve the efficiency of order picking. In some cases the layout design of Pick to Light system has been performed rather than scientific analysis by a common experience. Therefore, this study analyzed the impact of picking performance by the zone arrangement method in order picking process of Pick to Light system.

DSM 기반의 프로세스 구조화 방법론 (A new approach to structuring the process based on design structure matrix (DSM))

  • 설현주;김철현;이창용;박용태
    • 품질경영학회지
    • /
    • 제37권3호
    • /
    • pp.39-53
    • /
    • 2009
  • This paper suggests a new process structuring method, which we call process modularization, for decomposing and grouping activities in a process. Above all, we propose the concept of a module that is a group of activities positioned on the same flow before and after control constructs. Since activities in a module are relatively strongly interrelated with one another, it is important to take into consideration of these together. A design structure matrix (DSM) is used to structure the process because it has a lot of advantages in process modeling and analysis. We developed two algorithms: the restricted topological sorting (RTS) algorithm for ordering activities and the module finding (MF) algorithm for detecting modules in a process, which utilize the DSM. The suggested approach enables a firm's manager to design and analyze the process effectively. We also developed a supporting tool to accelerate the progress of process modularization. The supporting tool aids the process manager in finding the module and understanding the process structure easily. An illustrative example is addressed to show operations of the suggested approach.

변합기 공정 개선을 위한 APS(Advanced Planning & Scheduling) 프로세스 설계에 관한 연구 (A Study on the Process Design of Advanced Planning & Scheduling for Transformer Operation Improvement)

  • 황덕형;남승돈;조용욱;오선일;나승훈;강경식
    • 대한안전경영과학회지
    • /
    • 제14권2호
    • /
    • pp.159-166
    • /
    • 2012
  • As enterprises, based on the forecast of the customer's demand and collaboration with the suppliers, establish the integrated system directing supply, production, and distribution for the increase of productivity, Thus, this study intends to find the most urgent and critical factors for the improvement of the information system by externalizing factors affecting the operation of information system, suggest the process to improve the relevant functions of information system, and design the process. As a result of the analysis of the previous studies on the improvement of the information system, many studies were conducted on the improvement of ERP and SCM, yet there was no study conducted targeting about APS (Advanced Planning & Scheduling). Thus, this study chose APS as the subject for the design of the process for the improvement for the information system.

커튼월 설치 로봇 컨트롤러의 설계 및 사용성 평가에 관한 연구 (A Study for Usability and Designing Manual Controller of a Curtain‐wall Installation Robot)

  • 이승열;석재혁;한정완;김병화;한창수
    • 대한인간공학회지
    • /
    • 제25권4호
    • /
    • pp.71-80
    • /
    • 2006
  • A construction robot has been developed for higher productivity and better safety in various construction fields. Especially, curtain wall is suitable for outer wall material of tall commercial building and apartment complexes. This heavy material is, however, hard to install with a manpower and outdated equipment. For this reason, the prototype of ASCI (Automation System for Curtain wall Installation) was developed. This system has a robot controller(i.e. hand-held remote control unit) for the transfer information signal between human operator and robot system. Although study has been conducted on manual controller of ASCI, hardly any information is known about the operator's opinion. In this study, a questionnaire was completed by operator to get their opinion about aspects which need to design a more comfortable and productive manual controller of construction machinery, robot included. Through the result of study, it is expected that this technical data is contributed to the robot controller design for comfort and productivity of various industrial machinery.

고객지향적 제품개발을 위한 감성품질 평가 방법론에 관한 실증적 연구 - 마루 바닥재를 중심으로 - (A Empirical Study on the Measurement Method of Emotional Quality for Customer-oriented Product Development - Focused on Wood Flooring -)

  • 김동남;윤명환;이주환;조재립
    • 한국품질경영학회:학술대회논문집
    • /
    • 한국품질경영학회 2006년도 춘계학술대회
    • /
    • pp.355-358
    • /
    • 2006
  • The emotional quality of the product have become an important factor in purchasing decision. Classical approach of product design has focused on providing proper functions of the product. However, as the life-cycle of products become shorter and the customer's needs get more diversified, it is now necessary to accommodate the customer's emotional requirement in product design. This study aims to analyze and interpret the emotional characteristics based customer preference survey. This study consisted of two part. First part was to search the optimal combination of design variables through DOE of predetermined 5 design variables. In the second part, we developed customer preference index model to measure the customer preferences about 16 different wood flooring product.

  • PDF

FEM 시뮬레이션을 이용한 유니버설 조인트의 구조안전성 (Structural Safety of Universal Joint using FEM Simulation)

  • 정종윤
    • 산업경영시스템학회지
    • /
    • 제41권4호
    • /
    • pp.213-219
    • /
    • 2018
  • Mechanical components are to be produced with accurate dimensions in order to function properly in assemblies of a machine. Once designs of mechanical components are created, designers examine the designs by adopting many known experimental methods. A primary test method includes stress and strain evaluation of structural parts. In addition, fatigue test and vibration analysis are an important test method for mechanical components. Real experiments at a laboratory are established when products are manufactured. Since design changes should be done before producing the designs in factories, rapid modifications for new designs are required in production industries. FEM simulation is a proper choice for a design evaluation with speed at a detail stage in design process. This research focuses modeling and mechanical simulation of a mechanical component in order to ensure structural safety. In this paper, a universal joint, being used in driving axels of vehicles, is studied as a target component. A design model is created and tested in some ways by using commercial software of FEM. The designed component is being twisted to transmit heavy power and thus, torsional stress should be under strengths of the component's material. The next is fatigue analysis to convince fatigue cycles to be within the endurance limit of the material. Another test is a vibration analysis for rotational components. This research draws final conclusions from these test analyses and recommends whether the designed model is under safety condition in terms of mechanical structure.

Expert System을 이용한 전단기 고장 및 안전진단 시스템 구축 (Development of Shearing Machine Fault & Safety Diagnosis System Using Expert System)

  • 강경식;나승훈;정영득;박재현
    • 산업경영시스템학회지
    • /
    • 제20권44호
    • /
    • pp.475-483
    • /
    • 1997
  • Industrial safety management program consists of three part which is education, technology and control. The effectiveness of industrial safety control program rely on the ability of controlling hardware system, technology and software, training and management. How to design and develop the sharing machine fault and safety diagnosis system using expert system technique is presented on this paper.

  • PDF

피라미드 형태의 적재장 최적 설계 (Designing Stacking Facilities of Pyramid Type)

  • 박퇴경;김갑환
    • 대한산업공학회지
    • /
    • 제33권2호
    • /
    • pp.227-236
    • /
    • 2007
  • This paper proposes a method for designing stacking warehouses of pyramid type which can be found in storage rooms for steel coils, paper rolls, and drums for oils. Formulas were derived for estimating the expected travel time of cranes and the expected time for rehandling activities. Based on the derived formulas, this study derives the cost function for determining the optimal numbers of rows, bays, tiers of stacks under the condition that the requirement for storage space is satisfied. Numerical examples were given.

A Tabu Search Methods for Minimizing Mean Tardiness In Parallel Machines Scheduling

  • Chun Tai-Woong;Park Hai-Chun
    • 산업경영시스템학회지
    • /
    • 제23권60호
    • /
    • pp.67-72
    • /
    • 2000
  • In this paper we consider to parallel machines scheduling problems for minimizing mean tardiness that is known NP-complete. This problems is classified into two cases, one of which is the case which processing time are identical and the other, nonidentical. A Tabu Search method is applied to the problems considered in this paper to get an improved solution. To this end, we design move attribute, Tabu attribute and Tabu tenure, and thereafter perform the experiments to the problems.

  • PDF