• Title/Summary/Keyword: Impulse tests

Search Result 218, Processing Time 0.035 seconds

Evaluation of Similitude Laws for Dissipation Velocity of Excess Pore Pressure after Liquefaction using Impulse Load Tests (충격하중시험을 이용한 액상화 후 과잉간극수압 소산속도의 상사비 연구)

  • Kim, Dong-Hwi;Ha, Ik-Soo;Hwang, Jae-Ik;Kim, Myoung-Mo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.714-721
    • /
    • 2004
  • The purpose of this study is to find out the similitude laws for dissipation velocity of excess pore pressure after liquefaction according to magnitude of input accelerations and height of model soils from the results of impulse load tests. In impulse load tests, model soils were constructed to the height of 25cm, 50cm, and 100cm in acrylic tubes whose inside diameters were 19cm and 38cm respectively, and impulse loads were applied at the bottom of each model soil to liquefy the entire model soil. Excess pore pressure distribution by depth and settlement of soil surface were measured in each test. Dissipation curves of excess pore pressure measured in each tests were simulated by solidification theory, and dissipation velocities of excess pore pressure were determined from the slope of simulated dissipation curves. From the results of impulse load tests, dissipation velocity of excess pore pressure was not affected by magnitude of input acceleration, and from this fact, dissipation process was proved to be different from dynamic phenomenon. However, dissipation velocity of excess pore pressure increased as height of model soil increased and showed little difference as diameter of model soil increased. Therefore, the similitude law for dissipation velocity could be expressed by the similitude law for model height to 0.2 without regard to the diameter of model soil.

  • PDF

A Safety Assessment of Splice of 6/10[kV] Class CV Cables with Different Conductor Size (다른 굵기의 6/10[kV]급 CV 케이블 직선접속부 안전성 평가)

  • Jung, Jong-Wook;Kim, Sun-Gu;Jung, Jin-Soo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.10
    • /
    • pp.78-84
    • /
    • 2010
  • This paper describes the safety assessment of power cable splices connecting different sized 6/10[kV] class power cables. To assess the safety, AC withstand voltage tests, partial discharge tests and impulse tests were carried out to the cable splice specimens and thermal rise due to overload and cross section of joint were examined as well. As a result, a breakdown due to the $4.5[U_0](27[kV_{ac}])$ application could not found for 5 minutes. Under $1.73[U_0](10.4[kV_{ac}])$ application, partial discharges of 4~8[pC] were detected. In impulse tests, all the specimens withstood to the standard waveforms of $75[kV_{peak}](1.2{\times}50[{\mu}s])$ without any breakdowns. In addition, the temperature on the splice rose by $3[^{\circ}C]$ when the 200[A] flew through the splice for 20minutes, however the thermal rise of $3[^{\circ}C]$ was considered due to the atmospheric temperature. After all the electrical tests, the cross section of the splice was visually examined. The conditions of the conductors of both $185[mm^2]$ and $240[mm^2]$ were good.

The Minimization of Generator Output Variations by Impulse Chamber Pressure Control during Turbine Valve Test (터빈 밸브시험 중 충동실 압력제어에 의한 발전기 출력변동 최소화)

  • Choi, In-Kyu;Kim, Jong-An;Park, Doo-Yong;Woo, Joo-Hee;Shin, Jae-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.1
    • /
    • pp.152-159
    • /
    • 2010
  • This paper describes the actual application of a feedback control loop as a means for minimizing turbine impulse chamber pressure variation during the turbine steam valve tests at a 1,000 MW nuclear power plant. The chamber pressure control loop was implemented in the new digital control system which was installed as a replacement for the old analog type control system. There has been about 40MW of the generator output change during the steam valve tests, especially the high pressure governing valve tests, because the old control system had not the impulse chamber pressure control so the operators had to compensate steam flow drop manually. The process of each valve test consists of a closing process and an reopening process and the operators can make sure that the valves are in their sound conditions by checking the valves movement. The control algorithm described in this paper contributed to keep the change in megawatt only to 6MW during the steam valve tests. Thereby, the disturbance to reactor control was reduced, and the overall plant control system's stability was greatly improved as well.

Analysis of Impulse Withstand Voltage Performance of Lighting Equipment (조명기기의 임펄스내전압 성능의 분석)

  • Lee, Bok-Hee;Pang, Pyung-Ho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.3
    • /
    • pp.91-96
    • /
    • 2014
  • Modern electronic circuits are becoming more vulnerable to damage by surges, and it is required to improve the impulse withstand voltage performance of electrical and electronic equipment. This paper presents the impulse withstand voltage performance of lighting equipment connected to power lines, and the impulse withstand voltage tests for fluorescent lamp, LED lamp and halogen lamp were carried out according to the reference standards under normal service conditions. To conduct performance tests against lightning surge, a combination wave ($1.2/50{\mu}s$ voltage - $8/20{\mu}s$ current) was employed. The test surge was applied between lines or between line and ground of the specimen to be measured. The test surge was applied synchronized at the peak value of the positive and negative AC voltage waves. As a consequence, some specimens satisfied the impulse withstand voltage test criteria, but lighting equipment such as 36W fluorescent lamps, 5W and 5.5W LED lamps and 50W halogen lamp were damaged at the test voltage levels between power lines. It is needed to improve the qualities of lighting equipment to satisfy EMC immunity requirements of equipment for general lighting purposes.

A Study on the Time-Frequency Analysis of Transient Signal using Wavelet Transformation (Wavelet 변환을 이용한 과도신호의 시간-주파수 해석에 관한 연구)

  • 이기영;박두환;정종원;김기현;이준탁
    • Proceedings of the Korean Society of Marine Engineers Conference
    • /
    • 2002.05a
    • /
    • pp.219-223
    • /
    • 2002
  • Voltage and current signals during impulse tests on transformer are treated as non-stationary signals. A new method incorporating signal-processing method such as Wavelets and courier transform is proposed for failure identification. It is now possible to distinguish failure during impulse tests. The method is experimentally validated on a transformer winding. The wavelet transforms enables the detection of the time of occurrence of switching or failure events. After establishing the time of occurrence, the original waveform is split into two or more sections. The wavelet transform has ability to analysis the failure signal on time domain as well as frequency domain. Therefore, the wavelet transform is superior than courier transform to analysis the failure signal. In this paper, the fact was proved by real data which was achieved.

  • PDF

A Study on the Selection of GPR Type Suitable for Road Cavity Detection (도로동공 탐지에 적합한 GPR 타입 선정에 관한 연구)

  • Kim, Yeon Tae;Choi, Ji Young;Kim, Ki Deok;Park, Hee Mun
    • International Journal of Highway Engineering
    • /
    • v.19 no.5
    • /
    • pp.69-75
    • /
    • 2017
  • PURPOSES : The purpose of this study is to evaluate different types of Ground Penetrating Radar (GPR) testing for characterizing the road cavity detection. The impulse and step-frequency-type GPR tests were conducted on a full-scale testbed with an artificial void installation. After analyzing the response signals of GPR tests for detecting the road cavity, the characteristics of each GPR response was evaluated for a suitable selection of GPR tests. METHODS : Two different types of GPR tests were performed to estimate the limitation and accuracy for detecting the cavities underneath the asphalt pavement. The GPR signal responses were obtained from the testbed with different cavity sizes and depths. The detection limitation was identified by a signal penetration depth at a given cavity for impulse and step-frequency-type GPR testing. The unique signal characteristics was also observed at cavity sections. RESULTS : The impulse-type GPR detected the 500-mm length of cavity at a depth of 1.0 m, and the step-frequency-type GPR detected the cavity up to 1.5 m. This indicates that the detection capacity of the step-frequency type is better than the impulse type. The step-frequency GPR testing also can reflect the howling phenomena that can more accurately determine the cavity. CONCLUSIONS :It is found from this study that the step-frequency GPR testing is more suitable for the road cavity detection of asphalt pavement. The use of step-frequency GPR testing shows a distinct image at the cavity occurrences.

Development of Reference Impulse Measuring Systems and Investigation on Comparison Tests in Japan

  • Harada, Tatsuya;Kashiwagi, Yasuhide
    • Proceedings of the KIEE Conference
    • /
    • 1991.07a
    • /
    • pp.19-23
    • /
    • 1991
  • The revised draft of IEC Publication 60 "High Voltage Test Techniques" introduced a new calibration system for impulse measurements. In order to corespond to this draft, development of reference measuring systems and investigation of comparison tests are being carried out in Japan. This paper is a preliminary report on the topic.

  • PDF

Developing Standards for Measuring Consumer's Impulse Purchasing in Internet Shopping Mall and Analysis of Characteristics (인터넷 쇼핑에서의 충동구매 측정을 위한 척도의 개발 및 특성분석)

  • Chang, Hyun-Sun
    • Journal of Families and Better Life
    • /
    • v.27 no.4
    • /
    • pp.127-139
    • /
    • 2009
  • The purpose of this study was to develop a standardized scale to measure consume's impulse purchasing in internet shopping mall. As internet shopping is expanding rapidly, the consumer's impulse purchasing in the internet shopping is also increased. A preliminary 26-item scale was developed through a literature review. 1230 consumers responded to an online survey using the preliminary scale. This research was made with the intention of not only supplying the academic data on the consumer's impulse purchasing but also understanding the consume's basic behavior patterns in internet shopping mall. Then A series of tests, such as test-retest, item-to-total correlation, Cronbach's reliability coefficient and factor analysis, were conducted using the survey data. The final scale with 20-items was constructed in the end. The consume's impulse purchasing in internet shopping mall Scale for Consumers consisted of 4 factors.

Series-Gap Characteristics of Transmission Line Arrester with Switching and Lightning Impulse Flashover Test (개폐서지 및 뇌충격 섬락시험에 따른 송전 피뢰기의 직렬공극 특성)

  • Cho, Han-Goo;Yoo, Dae-Hoon
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2007.11a
    • /
    • pp.484-485
    • /
    • 2007
  • This paper describes the series-gap characteristics of transmission line arrester with switching and lightning impulse flashover test. The transmission line arrester exhibited external gap because it is must not flashover with switching impulse on the other hand it is must flashover with lightning impulse. In accordance, minimum and maximum length of series-gap was determinated with these tests. As gap length is increased flashover voltage was increased in the range of 315.4 kV~496.3 kV and negative polarity exhibited a high voltage. As a result, It was thought tat the series-gap length of transmission line arrester exhibited in the range of 580 mm~1100 mm.

  • PDF

HY 1600kV/70kA Impulse Voltage/Current Test Facility (한양대학교 1600kV/70kA 충격 전압/전류 시험설비 구축)

  • Chang, Yong-Moo;Kim, Cheol-Ho;Hwang, Ryul;Lee, Bang-Wook;Koo, Ja-Yoon
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2009.11a
    • /
    • pp.229-229
    • /
    • 2009
  • This Impulse Voltage and Current Test System is designed for performing of impulse voltage tests with Lightning impulse voltage 1.2/50(LI) up to 1520kV peak value and switching impulse voltages 250/2500(SI) up to 1120kV peak valu acc. to IEC 60060-1, and furthermore for impulse current test, e.g. testing of arrester sections($U_{res}$=95kV)with current impulses 4/10 and 8/20 up to 70kA peak value.

  • PDF