• Title/Summary/Keyword: IT service project

Search Result 818, Processing Time 0.031 seconds

A Feasibility Study of the Construction Project in Pre-Design Phase (건설 프로젝트의 사업타당성 분석에 관한 연구)

  • 노병옥;이상범;임남기
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.05a
    • /
    • pp.109-113
    • /
    • 2002
  • Urban public service is goods and activities which satisfy public demands for the political, social, economic, cultural activity and household affairs of individual or groups and which urban government supply with free of charge. In view of government, in addition to fairness of facilities location, location of such facilities are to be determined the respect to cost of locating facilities and developmental direction in the future. Therefore, it is necessary to study on feasibility. A feasibility study Is an effective tool in determining the decision of investment or not and the level of investment priority on Projects requiring a sizeable investment and the feasibility of a project. The first, it is to select reasonable location. It was selected four and two by consideration of facilities distribution and connection with others. Six proposal selected was estimated by five element of approach, demand, symbol, reality, environment. In result proposal I was chosen. The next, it is to estimate scales. The finally, it is to study on economical efficiency. Net Present Value was came out ₩4.4billion by 20years and Inter Rate of Return showed up 11%. in addition, it offer various benefit by public facilities. In conclusion, this project is reasonable.

  • PDF

The Study of Project Management Information System Establishment for Construction (건설사업관리 정보시스템(PMIS)구축에 관한 연구)

  • Yoon Jae-Ho;Moon Young-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.132-138
    • /
    • 2002
  • Recently, utilization of PMIS(Project Management Information System) is in high demand as it is desired to advance the construction market through cost reduction and quality improvement within the given schedule. However, PMIS developed by individual projects are mostly evolving around construction progress status due to the temporary nature of development period and use of the system by project executers is no more than perfunctory that results in limiting the effective communication between the project owner, project manager and constructor. Therefore, the purpose of this paper is to review the PMIS developed so far, and present the direction for an effective PMIS.

Direction of CM Services Defect Liability in the CM Contract

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.3
    • /
    • pp.209-217
    • /
    • 2013
  • The execution of a construction project involves the engagement of many participants. Generally, the Authority uses CM to certify that the Work is built according to the contract documents. The CM work scope is expressed in the Construction Technology Management Act and its Regulation. The mandated and delegated CM services are limited to the construction period. If Contractor is required to repair a construction defect, the Contractor should bear the burden of the inspection service for the defect repair, because it is associated with him. Nevertheless, CM should submit a bond to provide the inspection and supervision service for the defect repair. These may result in conflict with each liability. Therefore, CM service in the law and regulation was investigated and analyzed in this study to classify the characteristics of CM contracts, and it was suggested that the CM liability for the inspection and supervision service for the defect repair should be reconsidered.

Suggestion for Collaboration-Based UI/UX Development Model through Risk Analysis

  • Cho, Seong-Hwan;Kim, Seung-Hee
    • Journal of Information Processing Systems
    • /
    • v.16 no.6
    • /
    • pp.1372-1390
    • /
    • 2020
  • An attractive user interface (UI) design with a clear user experience (UX) is the key for the success of applications. Therefore software development projects require very close collaboration between SI developers and front-end service developers. However, methodologies for software development only exist with inadequate development processes or work standards for collaboration. This survey derived 13 risk factors in developing UI/UX from 113 risk factors of IT projects through a questionnaire and factor analysis and proposed a collaboration-based UI/UX development model that can eliminate or mitigate six risks with high weights and reliability. To extract risk factors with high reliability, factor and reliability were analyzed to extract 13 major risks, and based on the expert opinions and the results of correlation analysis, UI/UX development stages were classified into planning, design, and implementation. The causal relationships between risks were verified through regression analysis. This study is the first to expertly analyze major risks based on collaboration in UI/UX development and derive a theoretical basis that can be used in project risk management. These findings are expected to provide a basis for research on development methodologies for higher levels of front-end services and to construct rational collaboration systems between SI practitioners and front-end service providers.

A Study of the Integrated Cost Audit Model for the efficiency of IT project risk management with risk analyzing and using the function point in the IT project risk (사업위험 분석과 기능점수를 통한 사업원가 산정 및 정보시스템 감리점검모델 연구)

  • Yoon, Seong-Jeong;Han, Ki-Jun;Kim, Dong-Su
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.176-180
    • /
    • 2009
  • 현재 우리나라 SI(Service Integration)에서 사업발주자 및 수행자는 소프트웨어사업 대가산정에 많은 어려움을 겪고 있다. 사업발주자는 관례적인 사업비 산정으로 일관하고, 사업수행자는 근거없이 받아들이는 것이 현실이다. 또한 감리 수행 시 사업비산정근거를 점검할 체계를 갖추지 못하고 있다. 이로 인해, 비용관리 위험 및 파생위험들을 초래할 수 있다. 이에, 사업비 산정과 위험에 대한 구체적인 인식과 연구가 필요하다.

  • PDF

Study on Performance Evaluation of Academic Information Distribution Project in Scientific Technology Field (과학기술분야 학술정보 유통사업 성과평가에 관한 연구)

  • Kwak, Seung-Jin;Kim, Jeong-Taek;Park, Yong-Jae
    • Journal of Korean Library and Information Science Society
    • /
    • v.38 no.4
    • /
    • pp.441-462
    • /
    • 2007
  • As country try expand R&D investment and enhance its efficiency to improve the national competitiveness, research is needed to conduct qualitative enhancement and derive progressive future strategy in relation to the academic information distribution project in scientific technology field. In this study, BSC-based performance indicators were applied to an institute that is the representative of domestic academic information distribution institutes in the field of scientific technology to evaluate project performance, and then to analyze portfolio of using such evaluation results. As for the items of evaluation for the performance indicators of academic information distribution project in the scientific technology field, 12 items that includes information resource quality, information service quality, user satisfaction and economically useful value of academic information from four(4) viewpoints such as information resource, information service, user and economic viewpoints. In the portfolio analysis, it was conducted by performance indicators and by elements of the individual performance indicators as well. Based on the results of performance evaluation and portfolio analysis, the improvement method by viewpoints on academic information distribution project of an institute was suggested.

  • PDF

Performance Evaluation of Smart Street Lighting Systems Applying the PFI Model

  • Hung-Yu Chou;Yu-Te Wei;Yu-Ting Lai;Jun-Teng Zhuang;Jun-Xi Liu;Wen-Chin Chang
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.1278-1278
    • /
    • 2024
  • Private Finance Initiative (PFI) involves long-term contracts where private entities invest in the construction and maintenance of street lighting facilities. The current implementation of PFI Smart Street Lighting Systems faces challenges in the fulfillment process, including discrepancies in quantities, coordination of power variations, delays in the deployment of smart systems, and issues with performance indicator scoring. These challenges disrupt the smooth execution of contractual obligations. Nevertheless, the adoption of intelligent systems in street lighting presents significant advantages in reducing energy consumption, extending the lifespan of fixtures, and enhancing maintenance efficiency. This study aims to analyze an ongoing project, applying the Fuzzy Analytic Hierarchy Process (FAHP) to identify crucial PFI indicators and their weights. The study explores areas of improvement in the project compared to traditional street lighting, aiming to provide solutions to the mentioned challenges. The results indicate that indicators such as PS3 (Lighting Service Continuity) with a weight of 0.384% and PS4 (Smooth Operation of the Smart Street Lightings Management System) with a weight of 0.274% have the highest impact on service performance. Additionally, the project involves replacing 162,000 streetlights, resulting in a yearly energy consumption reduction of approximately 70%, a decrease in monthly maintenance time from an average of 48 hours to 15 hours, and an expected reduction of 900,000 tons in carbon emissions during the project period. Value for Money (VfM) analysis suggests an annual reduction in government expenditures of NTD 66 million. This reveals that implementing PFI model is more advantageous than traditional street lighting procurement, as it allows the government to leverage contractor financing and alleviate the initial high costs of streetlight replacement, thereby reducing the overall costs of streetlight establishment and maintenance.

Bim Strategy Plan through Domestic Construction Companies BIM Project Case Analysis - focused on the BIM USE of the project from 2009 to 2015 - (국내 건설회사 BIM 프로젝트의 사례 분석을 통한 BIM전략 수립 방안 - 2009년부터 2015년까지 프로젝트의 BIM Use를 중심으로 -)

  • Jo, Yong-Hyun;Lee, Joo-Sung;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.6 no.2
    • /
    • pp.1-11
    • /
    • 2016
  • In South Korea, there have been attempts to enhance BIM work practices in various aspects. Public Procurement Service(PPS) has recently published 'basic guidelines to improve BIM work practices in construction and facility management'. It defines roles and responsibilities of project members in their application of BIM. It also developed a set of modelling standards and guidelines for effective model creation, management and communication among BIM users. Moreover, numerous construction companies have tried to cultivate BIM specialized manpower throughout entire construction phases. However, there are still challenges faced by firms during BIM adoption. Therefore, this study aims to provide practical counsel for construction companies to help them create optimized facilities and deliver high performance by analyzing BIM-based domestic construction projects in Korea from 2009 and 2015. The study will investigate types of client, project, BIM application range, and application technology.

Performance Analysis of the Healthy Family Support Center's Pilot Project to Support Grandparent-Grandchild Families (2011 건강가정지원센터 조손가정 지원 시범사업의 성과분석)

  • Song, Hye-Rim;Kim, Yoo-Kyung;Cho, Young-Hee
    • Journal of Family Resource Management and Policy Review
    • /
    • v.16 no.3
    • /
    • pp.83-107
    • /
    • 2012
  • This study analyzed the outcomes of the Healthy Family Support Center's 2011 Pilot Project to support grandparent-grandchild families. This paper applied Frank Fisher's multidimensional evaluation methodology, which includes 4 steps: program verification, situational validation, system vindication and social choice. The major findings and their implications are as follows: the strong points of the pilot project are the characteristics of its services, i.e. sending services, customized services, family-unit services and integrated services. Therefore, it is necessary to train human resources to deliver these services more professionally and to provide comprehensive life-planning. The weak point of the pilot project is its lack of services relating to the self-reliance of the clients. Thus it is necessary to revise the service subsystems to include programs that promote self-support measures.

  • PDF

Implementing SOA (Service Oriented Architecture) as an upcoming IT standard for Business Integration (비즈니스 통합의 표준으로서 '서비스 지향 아키텍처' 구축에 관한 연구)

  • Cho, Jae-Hun;Choi, Woo-Yong;Lee, Sang-Wan
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.10a
    • /
    • pp.182-185
    • /
    • 2005
  • To survive in rapidly changing business environment, the enterprise should adapt its business process to the changing environment. The system integration is an important issue to tackle this challenge. It is unavoidable direction that SOA (Service Oriented Architecture) is accepted as an upcoming IT standard to support flexible business processes and integration. In this paper, SOA is introduced, and the Web services and ESB (Enterprise Service Bus) ate also introduced as a foundation technology to implement SOA-enabled solutions. The pilot project, which is introduced in this paper, will be a good reference for future SOA implementation.

  • PDF