• Title/Summary/Keyword: IT project performance

Search Result 1,417, Processing Time 0.032 seconds

Study on the Key Technologies for Performance and Operation of the High-Speed EMU (동력분산형 고속철도 차량성능 및 운용 기반기술 연구)

  • Song, Dahl-H.;Min, Kyung-H.
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1227-1232
    • /
    • 2008
  • High-speed train of push-pull type called as G7 train has been developed and chosen as the model of KTX-II which will be operated on Honam Line nexr year. However, the EMU-type high-speed train appeared to be the recent trend that foreign markets have shown. Also, in the near future, a great number of new train sets are needed to accommodate the increased passengers in our country. Thus, development of the high-speed EMU was decided, planned, and started. In the development, included were almost all fundamental key technologies such as noise and vibration reduction in a passenger cabin, running characteristics, aerodynamic analysis, crashworthiness evaluation, EMI/EMC analysis, design of the cooling system for the propulsion control system, enhanced performance of transformer and switching converters, synchronous traction motor with permanent magnets, new design of front nose and ergonomic interiors, application of advanced information technology(IT) and smart sensors and the cost reduction of construction of railway bridges, etc. Each key technologies are carried out as sub-project independently but under the supervision of a project. The project will develop the high advanced level of technologies and provide necessary know-why's and support the team in charge of the development of the high-speed EMU, Hyundai Rotem Co. Ltd. The high-speed EMU will be successfully developed with the support of the project.

  • PDF

EVALUATION OF SUSTAINABILITY OF CONSTRUCTION OPERATIONS: A FRAMEWORK FOR THE NEW ZEALAND CONSTRUCTION INDUSTRY

  • Jasper Mbachu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.550-557
    • /
    • 2009
  • The concepts of 'sustainable development', 'sustainable construction' and 'green building' have been elevated to priority levels in all types and phases of construction project development worldwide. Consultants and contractors are now required to seriously consider the impact of their operations on the natural environment and the society, and consequently adopt sustainable construction practices in the development process to minimize and mitigate the negative impacts of their activities. However, existing sustainability rating tools apply to the design, post-construction and operation phases of a building; no tool exists for the rating of the performance of the contractor or the project team at the construction phase. This study aimed to develop a model for evaluating the sustainability of construction operations, drawing on the global best practice standards on sustainability. Practical applications of the model were carried out through case studies to evaluate the performances of fifteen construction firms in New Zealand. The developed model and the outcomes of the case studies were presented, including potential areas of weaknesses, strengths, constraints to achievement or adoption of sustainable construction practices and areas for improvement in the operations of the firms. The successful application of the developed model in practice shows its usefulness and ease of application. It is therefore recommended for adoption as a simple but effective system for measuring and reporting on sustainability performance or sustainability of construction operations of firms in New Zealand and elsewhere.

  • PDF

LEED PERCEPTION DISPARITIES: DESIGNERS VERSUS NON-DESIGNERS

  • Hyun Woo Lee;Youngchul Kim;Doyoon Kim;Kunhee Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.36-41
    • /
    • 2013
  • With the increased interest in green buildings, the building industry has been experiencing a fast-growing demand for LEED (Leadership in Energy and Environmental Design) certification for the last decade. Still, it is not unusual to see various barriers and issues during its implementation, and experience tells that they can result in harming the overall project performance with reworks, lower productivity, schedule delays, and cost overruns. In order to better understand the industry's observation on issues and their consequences during LEED implementation, we distributed an online survey, and a total of 53 responses were received. The survey results indicate that (1) both designers and non-designers (e.g., contractors) select 'added costs to design and construction' as the biggest barrier; (2) both designers and non-designers select 'decision made too late in the design process' as the most frequently observed issue; and (3) non-designers indicate higher perceived severity in every consequence criteria than designers. The statistical analyses reveal that cost overruns are the most severe impact observed and have a statistically significant relationship with responses in regard to the barrier to LEED implementation.

  • PDF

Risk Influencing Factors in Performance of River Disaster Prevention Project (하천재해예방사업의 성과에 미치는 리스크 영향요인)

  • Cho, Jin-Ho;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.4
    • /
    • pp.417-428
    • /
    • 2020
  • The characteristics of the construction project involved various stakeholders' involvement from the planning stage until completion of the object, which caused the uncertainty to increase. Successful construction projects require risk analysis and appropriate responses. Therefore, this study aimed to confirm the influence of risk management factors on the success of river disaster prevention construction in construction projects and the effect of moderating communication between stakeholders involved in the construction process. The Delphi method was used to derive the risk management factors of the construction process. The survey used a snow ball sampling method. For analysis, SPSS Statistic 20 and SmartPLS 2.0 were used. As a result of the study, the impact of risk management factors on project performance was found to be large in the order of time risk, quality risk, cost risk, safety risk, and construction environment risk. In addition, the impact of the communication moderating effect was large in the order of cost risk, quality risk, construction environment risk, time risk, and safety risk. In this study, it was confirmed that communication between stakeholders related to river disaster prevention work has a moderating effect that changes the ranking of impacts on project performance. This shows the importance of communication in the construction process of river disaster prevention works. This study has important significance in that it identifies the importance of risk management factors and communication in river disaster prevention works.

A Study on the Success Factors Related to the Performance of Power Plant Engineering Projects (발전플랜트 엔지니어링 프로젝트 성공요인 우선순위 도출 연구)

  • Suh, Jaeho;Lee, Dongmyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.11-22
    • /
    • 2024
  • Power plant engineering industry obtains EPC plan project and delivers results about electricity, measurement, machinery, and piping and so on. Its works are taken by projects. Although power plant engineering composes 2~5% of whole EPC project cost, it's one of the fundamentals because it affects process after planning step a lot. However, domestic power plant engineering companies' project performance ability is insufficient and there's a need for systematic performance. Thus, this study defined related factors of successful performance and analyzed the priority among them through analytical hierarchy process. All respondents recognized experience, knowledge, and communication as important factors. Administrators considered knowledge, experience, and communication. But hands-on workers considered experience, knowledge, human resources. Those who have experience in oversea project considered process, experience, human resources. However those who don't have experience in oversea project considered knowledge, experience, and communication. Recognition of important factors varies by the position and work experience of members.

Design and Implementation of Team Project Assessment System using auto generated web survey document (자동 생성 웹 설문지를 이용한 팀 프로젝트 평가 시스템의 설계 및 구현)

  • Lee, Mi-Young;Min, Su-Hong;Cho, Dong-Sub
    • The Journal of Korean Association of Computer Education
    • /
    • v.6 no.4
    • /
    • pp.195-207
    • /
    • 2003
  • The Seventh Curriculum uses not only individual assessment but also team assessment method that organizes and solves assignments by team unit. It also helps students to learn cooperation and responsibility and share the ideas and process of the team project with other students through class presentation. It is also cooperative learning which is performed by several students together. Therefore, the assessment of team project is required to synthetically assess the performance process not the itself. This thesis will examine the actual problems about team project assessment and analyze related literatures. Then, this study designs and implements a practical system which alleviates the burden of teachers in charge of a team project assessment and improves reliability and validity in assessing team projects through multilateral assessment aiming at process as well as result objectives.

  • PDF

Constitution and Operation of a Molten Carbonate Fuel Cell System (용융탄산염형 연료전지 발전시스템 구성 및 운전)

  • Ahn, Kyo-Sang;Kim, Dong-Hyung;Seol, Jin-Ho;Lim, Hee-Chun
    • Proceedings of the KIEE Conference
    • /
    • 1997.07a
    • /
    • pp.100-103
    • /
    • 1997
  • Korea Electric Power Corporation (KEPCO) started a fuel cell project to develop alternative sources of electric power because of the rapid increase in power demand and global environmental problems. For the development of a molten carbonate fuel cell (MCFC), KEPCO started the project in 1993 to develop a 2 kW MCFC system and finished it at the end of 1996. In this project, $ASPEN^+$ was utilized to design the 2 kW MCFC generation system. Based on this simulation, a power generation system was designed and installed for operation and a long term test of internally manifolded 2 kW class MCFC stack. This stack has 20 cells with an effective electrode area of $1000\;cm^2$. It was run at 0.84 V and $150\;mA/cm^2$ and was operated for more than 3,250 hours continuously. This paper describes the system configuration and its control and measurement units. An analysis of the stack performance, the effect of gas utilization ratio, and the stack performance requirements are also discussed.

  • PDF

A Study on the Performance Analysis of LINC+(2019~2021) Program in Dental Hygiene Department (일부 치위생학과의 LINC+(2019~2021) 사업 성과에 관한 연구)

  • Chang-Suk, Kim
    • Journal of agricultural medicine and community health
    • /
    • v.47 no.4
    • /
    • pp.275-282
    • /
    • 2022
  • Objective: This study intends to analyze the performance of LINC+ program for three years of the dental hygiene department at Ulsan college and to present the direction for the operation of the LINC 3.0 project to be conducted for 6 years. Methods: A survey was conducted on 87 human resources officers participating in the LINC+ project of dental hygiene department from July 2021 to August 30, 2021, and the IBM SPSS Statistics 24.0 program was used for data analysis. Results: In terms of the suitability of the curriculum, operation of clinical practice averaged 4.82 points and omnibus courses averaged 4.77 points, and it was identified that OJT course, clinical practice, and educational environment make effects on job adaptation period, education and training period, and the reduction of education and training costs(p<0.05). Conclusion: In order to produce graduates who are highly adaptable in the field, participation of industries in the development and operation of the curriculum must be expanded and jointly operated, and it was possible to confirm the importance of the same educational environment as the industry to shorten the job adjustment period.

Study on the Operational Status of the Comprehensive Rural Village Development Project Completion Area - Focused on Sumun, Obong and Mopyeong Areas - (농촌마을종합개발사업 준공 권역의 운영 실태에 관한 고찰 - 수문·오봉·모평권역을 중심으로 -)

  • Yang, Won Sik;Choi, Young-Wan;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.30 no.1
    • /
    • pp.67-79
    • /
    • 2024
  • The Comprehensive Rural Village Development Project, a resident-led bottom-up regional development project, began in 2004. This study investigated difficulties and problems in the operation process after the completion of the project, and future improvement plans, through in-depth interviews with the former and current chairman of the steering committee, steering committee members, and office managers, targeting three regions in Jeollanam-do, 15 years after the completion of the project. As a result of the survey and analysis, it was effective in improving the living environment and characteristics of each village and revitalizing the area. And while there were well-run facilities depending on the type of project, there were also many idle facilities. In the case of communal facilities, there was a high possibility of problems in operation and management when the scale of the new building was large. Conflicts occurred between villages in the process of independently operating the area after the completion of the project. Therefore, it is necessary to provide an S/W project program to prepare for after completion. Local governments need to utilize City and County Capacity Enhancement Projects to support regional leaders to participate in educational programs after completion and provide guidance and supervision for village operations.

The Effect of Project Method on the Girl Student's Task Performance Ability in the Unit of 'Energy and Transportation Technology' of Technology.Home Economics Subject in High Schools (고등학교 기술.가정과 '에너지와 수송기술' 단원에서 프로젝트법이 여학생의 과제 수행 능력에 미치는 효과)

  • Kim, Young-Ryu;Lee, Sang-Hyuk;Lee, Yong-Jin
    • 대한공업교육학회지
    • /
    • v.35 no.2
    • /
    • pp.159-181
    • /
    • 2010
  • This study aims to verity effects of project method on the girl students' task performance ability in the unit of 'Energy and Transportation Technology' of Technology' Home Economics Subject in High schools. The task performance ability are composed of collecting information, performing achievement, planning of solving the task, and performance evaluation. The results of this research conducted for girl students of two classes of H high school located in Gyeong-gi Province are as follows: First, the group with the project method was more effective, in general, in learning ability of performing the tasks of 'Energy and Transportation Technology' than the group with traditional teaching. Second, the group with the project method was more effective than the group with traditional teaching in ability of task performance of subordinate elements of performing tasks in the unit of 'Energy and Transportation Technology', such as collecting information and performing achievement. However, in the fields of another subordinate elements of planning of solving the task and performing evaluation, the degree of effectiveness was unknown. After examining the results of all the cases, it was found that project method was more effective than the traditional teaching method in increasing the performing task abilities of the students in the lesson of 'Energy and Transportation Technology' in high schools.

  • PDF