High-speed train of push-pull type called as G7 train has been developed and chosen as the model of KTX-II which will be operated on Honam Line nexr year. However, the EMU-type high-speed train appeared to be the recent trend that foreign markets have shown. Also, in the near future, a great number of new train sets are needed to accommodate the increased passengers in our country. Thus, development of the high-speed EMU was decided, planned, and started. In the development, included were almost all fundamental key technologies such as noise and vibration reduction in a passenger cabin, running characteristics, aerodynamic analysis, crashworthiness evaluation, EMI/EMC analysis, design of the cooling system for the propulsion control system, enhanced performance of transformer and switching converters, synchronous traction motor with permanent magnets, new design of front nose and ergonomic interiors, application of advanced information technology(IT) and smart sensors and the cost reduction of construction of railway bridges, etc. Each key technologies are carried out as sub-project independently but under the supervision of a project. The project will develop the high advanced level of technologies and provide necessary know-why's and support the team in charge of the development of the high-speed EMU, Hyundai Rotem Co. Ltd. The high-speed EMU will be successfully developed with the support of the project.
International conference on construction engineering and project management
/
2009.05a
/
pp.550-557
/
2009
The concepts of 'sustainable development', 'sustainable construction' and 'green building' have been elevated to priority levels in all types and phases of construction project development worldwide. Consultants and contractors are now required to seriously consider the impact of their operations on the natural environment and the society, and consequently adopt sustainable construction practices in the development process to minimize and mitigate the negative impacts of their activities. However, existing sustainability rating tools apply to the design, post-construction and operation phases of a building; no tool exists for the rating of the performance of the contractor or the project team at the construction phase. This study aimed to develop a model for evaluating the sustainability of construction operations, drawing on the global best practice standards on sustainability. Practical applications of the model were carried out through case studies to evaluate the performances of fifteen construction firms in New Zealand. The developed model and the outcomes of the case studies were presented, including potential areas of weaknesses, strengths, constraints to achievement or adoption of sustainable construction practices and areas for improvement in the operations of the firms. The successful application of the developed model in practice shows its usefulness and ease of application. It is therefore recommended for adoption as a simple but effective system for measuring and reporting on sustainability performance or sustainability of construction operations of firms in New Zealand and elsewhere.
International conference on construction engineering and project management
/
2013.01a
/
pp.36-41
/
2013
With the increased interest in green buildings, the building industry has been experiencing a fast-growing demand for LEED (Leadership in Energy and Environmental Design) certification for the last decade. Still, it is not unusual to see various barriers and issues during its implementation, and experience tells that they can result in harming the overall project performance with reworks, lower productivity, schedule delays, and cost overruns. In order to better understand the industry's observation on issues and their consequences during LEED implementation, we distributed an online survey, and a total of 53 responses were received. The survey results indicate that (1) both designers and non-designers (e.g., contractors) select 'added costs to design and construction' as the biggest barrier; (2) both designers and non-designers select 'decision made too late in the design process' as the most frequently observed issue; and (3) non-designers indicate higher perceived severity in every consequence criteria than designers. The statistical analyses reveal that cost overruns are the most severe impact observed and have a statistically significant relationship with responses in regard to the barrier to LEED implementation.
KSCE Journal of Civil and Environmental Engineering Research
/
v.40
no.4
/
pp.417-428
/
2020
The characteristics of the construction project involved various stakeholders' involvement from the planning stage until completion of the object, which caused the uncertainty to increase. Successful construction projects require risk analysis and appropriate responses. Therefore, this study aimed to confirm the influence of risk management factors on the success of river disaster prevention construction in construction projects and the effect of moderating communication between stakeholders involved in the construction process. The Delphi method was used to derive the risk management factors of the construction process. The survey used a snow ball sampling method. For analysis, SPSS Statistic 20 and SmartPLS 2.0 were used. As a result of the study, the impact of risk management factors on project performance was found to be large in the order of time risk, quality risk, cost risk, safety risk, and construction environment risk. In addition, the impact of the communication moderating effect was large in the order of cost risk, quality risk, construction environment risk, time risk, and safety risk. In this study, it was confirmed that communication between stakeholders related to river disaster prevention work has a moderating effect that changes the ranking of impacts on project performance. This shows the importance of communication in the construction process of river disaster prevention works. This study has important significance in that it identifies the importance of risk management factors and communication in river disaster prevention works.
Korean Journal of Construction Engineering and Management
/
v.25
no.2
/
pp.11-22
/
2024
Power plant engineering industry obtains EPC plan project and delivers results about electricity, measurement, machinery, and piping and so on. Its works are taken by projects. Although power plant engineering composes 2~5% of whole EPC project cost, it's one of the fundamentals because it affects process after planning step a lot. However, domestic power plant engineering companies' project performance ability is insufficient and there's a need for systematic performance. Thus, this study defined related factors of successful performance and analyzed the priority among them through analytical hierarchy process. All respondents recognized experience, knowledge, and communication as important factors. Administrators considered knowledge, experience, and communication. But hands-on workers considered experience, knowledge, human resources. Those who have experience in oversea project considered process, experience, human resources. However those who don't have experience in oversea project considered knowledge, experience, and communication. Recognition of important factors varies by the position and work experience of members.
The Journal of Korean Association of Computer Education
/
v.6
no.4
/
pp.195-207
/
2003
The Seventh Curriculum uses not only individual assessment but also team assessment method that organizes and solves assignments by team unit. It also helps students to learn cooperation and responsibility and share the ideas and process of the team project with other students through class presentation. It is also cooperative learning which is performed by several students together. Therefore, the assessment of team project is required to synthetically assess the performance process not the itself. This thesis will examine the actual problems about team project assessment and analyze related literatures. Then, this study designs and implements a practical system which alleviates the burden of teachers in charge of a team project assessment and improves reliability and validity in assessing team projects through multilateral assessment aiming at process as well as result objectives.
Korea Electric Power Corporation (KEPCO) started a fuel cell project to develop alternative sources of electric power because of the rapid increase in power demand and global environmental problems. For the development of a molten carbonate fuel cell (MCFC), KEPCO started the project in 1993 to develop a 2 kW MCFC system and finished it at the end of 1996. In this project, $ASPEN^+$ was utilized to design the 2 kW MCFC generation system. Based on this simulation, a power generation system was designed and installed for operation and a long term test of internally manifolded 2 kW class MCFC stack. This stack has 20 cells with an effective electrode area of $1000\;cm^2$. It was run at 0.84 V and $150\;mA/cm^2$ and was operated for more than 3,250 hours continuously. This paper describes the system configuration and its control and measurement units. An analysis of the stack performance, the effect of gas utilization ratio, and the stack performance requirements are also discussed.
Journal of agricultural medicine and community health
/
v.47
no.4
/
pp.275-282
/
2022
Objective: This study intends to analyze the performance of LINC+ program for three years of the dental hygiene department at Ulsan college and to present the direction for the operation of the LINC 3.0 project to be conducted for 6 years. Methods: A survey was conducted on 87 human resources officers participating in the LINC+ project of dental hygiene department from July 2021 to August 30, 2021, and the IBM SPSS Statistics 24.0 program was used for data analysis. Results: In terms of the suitability of the curriculum, operation of clinical practice averaged 4.82 points and omnibus courses averaged 4.77 points, and it was identified that OJT course, clinical practice, and educational environment make effects on job adaptation period, education and training period, and the reduction of education and training costs(p<0.05). Conclusion: In order to produce graduates who are highly adaptable in the field, participation of industries in the development and operation of the curriculum must be expanded and jointly operated, and it was possible to confirm the importance of the same educational environment as the industry to shorten the job adjustment period.
The Comprehensive Rural Village Development Project, a resident-led bottom-up regional development project, began in 2004. This study investigated difficulties and problems in the operation process after the completion of the project, and future improvement plans, through in-depth interviews with the former and current chairman of the steering committee, steering committee members, and office managers, targeting three regions in Jeollanam-do, 15 years after the completion of the project. As a result of the survey and analysis, it was effective in improving the living environment and characteristics of each village and revitalizing the area. And while there were well-run facilities depending on the type of project, there were also many idle facilities. In the case of communal facilities, there was a high possibility of problems in operation and management when the scale of the new building was large. Conflicts occurred between villages in the process of independently operating the area after the completion of the project. Therefore, it is necessary to provide an S/W project program to prepare for after completion. Local governments need to utilize City and County Capacity Enhancement Projects to support regional leaders to participate in educational programs after completion and provide guidance and supervision for village operations.
This study aims to verity effects of project method on the girl students' task performance ability in the unit of 'Energy and Transportation Technology' of Technology' Home Economics Subject in High schools. The task performance ability are composed of collecting information, performing achievement, planning of solving the task, and performance evaluation. The results of this research conducted for girl students of two classes of H high school located in Gyeong-gi Province are as follows: First, the group with the project method was more effective, in general, in learning ability of performing the tasks of 'Energy and Transportation Technology' than the group with traditional teaching. Second, the group with the project method was more effective than the group with traditional teaching in ability of task performance of subordinate elements of performing tasks in the unit of 'Energy and Transportation Technology', such as collecting information and performing achievement. However, in the fields of another subordinate elements of planning of solving the task and performing evaluation, the degree of effectiveness was unknown. After examining the results of all the cases, it was found that project method was more effective than the traditional teaching method in increasing the performing task abilities of the students in the lesson of 'Energy and Transportation Technology' in high schools.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.