• Title/Summary/Keyword: IT project performance

Search Result 1,413, Processing Time 0.028 seconds

Importance-Performance Analysis of Elderly Residents on the Planned Elements of the Participatory Residential Environment Improving Projects - Focused on the Project of Yonnam-dong - (주민참여형 주거지 재생사업의 정비요소에 대한 고령 거주자의 중요도-만족도 분석 - 연남동 사업지구를 대상으로 -)

  • Kim, Ah-Leum;Koo, Ja-Hoon;Lee, Joo-Lim
    • Journal of the Korean housing association
    • /
    • v.24 no.6
    • /
    • pp.103-110
    • /
    • 2013
  • The purpose of this study is to estimate the perception of elderly residents on the residential environment improving projects and suggest the political implications. The survey include questionnaires about the importance and the satisfaction level on the project maintenance factors. The results were statistically analyzed by Importance-Performance Analysis (IPA). As the result of the study, firstly, it shows that 'the possible overkill area' on the IPA action grid includes none of factors except 'landscape' which is very similar to mean of performance score. the result of analysis means that the project is very efficient. Secondly, the policy is necessary to improve 'pedestrian passage', 'public open space' and 'transportation environment'. Considering elderly residents especially 'pedestrian passage' and 'public open space' are in need of improvement immediately. In detail 'traffic facility', building 'urban park' and 'pedestrian passage', 'paving of pedestrian passage', 'children's playground' are in need of improvement as well. The results of analysis on elderly and non-elderly residents of Yonnam project may be important foundation for future strategies for improvement.

Performance Management through Time-Cost Integration in Construction Project (비용-일정 통합관리를 통한 건축공사 실적관리)

  • Kim Dong-Jin;Lim Hyoung Chul;Choi Jung Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.379-382
    • /
    • 2001
  • In domestic construction industry, time and cost has been managed separately in most cases. Usually projects are managed focused on cost, so time is not yet managed systematically. Project performance in these managemental situation can not be assessed correctly. This would cause project delay, cost overrun, productivity loss. Therefore it is needed to adopt earned value concept, an approach used in the management and control of project costs and schedules. Using this EV concept through time-cost integration, project can be managed properly based on the consistency, predictability, and reliability of the performance data. This paper proposed time and cost integration process, proper PMT method, and practical performance management model through time and cost integration.

  • PDF

Running Performance Analysis for the High-speed Electric Multiple Unit 400km/h Experimental (차세대 고속열차 주행성능해석)

  • Lee, Tae-Hyung;Park, Choon-Soo;Han, In-Soo;Choi, Sung-Hoon;Kim, Sang-Soo
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2009.06a
    • /
    • pp.478-479
    • /
    • 2009
  • The HEMU-400X(High-speed Electric Multiple Unit 400km/h eXperimental) project starts in 2007. It is required to analysis and simulate the train performance throughout the project life cycle for a successful completion of the project. This paper is devoted to the development of a train performance analysis model for the high-speed electric multiple unit 400km/h experimental. The model consist of running resistance model, train model, traction model and braking model. So, this paper represents the results of the train performance analysis.

  • PDF

An Evaluation Model of IT PMO Performance Using Pentagon Model (Pentagon Model을 활용한 정보화 프로젝트 PMO의 성과평가 모형 제시)

  • Kim, Ki-Hyun;Park, Geun-Wan;Hwang, Seung-June
    • The Journal of Society for e-Business Studies
    • /
    • v.21 no.4
    • /
    • pp.119-136
    • /
    • 2016
  • Precedent studies revealed that success of IT project strongly depends on the competency of PMO(project management offices), however, there are only few studies which show the importance of PMO competency. In this study, we will suggest an evaluation model of IT PMO competency using the Pentagon Model which is a tool to assess the performance of project organization, and the Analytic Hierarchy Process. We classified effect factor of PMO competency into 25 items in 5 fields such as Structure, Technology, Culture, Interaction, Social Relations and Networks based on pentagon model, also analysis of criticality between the effect factors was conducted by AHP. The study result shows 3 factors of Structure were included in the top 10, while 2 factors of Technology, Culture, Interaction were included separately. In terms of Social Relations and Networks, only 1 factor was included in the top 10. Therefore Structure of PMO should be aggressively considered for the successful IT project.

Performance Analysis on Income Generation Works in Comprehensive Rural Village Development Project by Their Implementation (농촌마을종합개발사업의 공동소득사업 성과분석)

  • Yang, Won-Sik;Choi, Soo-Myung
    • Journal of Korean Society of Rural Planning
    • /
    • v.19 no.1
    • /
    • pp.55-70
    • /
    • 2013
  • Since 2004, Ministry for Food, Agriculture, Forestry and Fisheries(MIFAFF) has been carrying out comprehensive rural village development project as the core one of Rural Area Development Schemes in Korea. Up to now, 56 projects had been completed after having with 5-year plan implementation period, on which it is possible to try post-project evaluation works. This study aims to propose a rational income-generation works model of comprehensive rural village development project, based on fulfillment checking results of their statutory stepwise working procedures specified in the project guidelines and their interim/post project performance analysis results in 56 project areas above mentioned. In comprehensive rural village development project, income-generation works generally have both quantitative and qualitative effects to rural communities; the former is focussed on income increasement of villagers, while the latter on community revitalization through job creation and spill-over effects of other linked community activities. So, the research works of this study focussed on these two comprehensive effects above mentioned.

An Evaluation Study on the School Library Revitalization Project (학교도서관 활성화 사업에 대한 인식 및 효과성 측정연구)

  • Noh, Young-Hee;Kwon, Jae-Hyun
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.41 no.2
    • /
    • pp.81-110
    • /
    • 2007
  • This study aims to identify challenges faced by the schools participating in the 2006 School Library Revitalization Project so as to incorporate them in the next year's plan, which is the last year of the phase one of the project, as well as in designing the phase two. By doing so, it seeks to contribute to enhancing effectiveness of the School Library Revitalization Project conducted by the Ministry of Education and Human Resources Development(MOEHRD), the Republic of Korea. The second segment of the research consists of the pub)ic survey in 1,281 project schools(2005) and 1,098 project schools(2006) to assess overall performance of the project. The target group is divided into five categories of school inspectors, principals, teachers, school librarians, and students.

A Study on the Development and Application of Performance Evaluation Model for Defense Standard Improvement Projects (국방규격 개선사업의 성과평가모형 개발 및 적용방안 연구)

  • Lee, Min Cheol;Kim, Young Hyun;Ahn, Young Jun;Kim, Jun Su
    • Journal of Korean Society for Quality Management
    • /
    • v.51 no.2
    • /
    • pp.185-202
    • /
    • 2023
  • Purpose: The purpose of this study is to identify key performance evaluation items and factors that are effective and practical for project management of defense standard standard improvement projects, and to develop a quantitative performance evaluation model. Methods: For the development of a performance evaluation model for defense standard improvement projects, we analyzed past major project performance and derived evaluation items and factors. To increase the objectivity and efficiency of project evaluation, we developed an evaluation index that enables relative evaluation of evaluation targets, and calculated the main importance of evaluation items using the Analytic Hierarchy Process (AHP) method based on the main opinions of expert groups. Results: The study resulted in the identification of main performance items for defense standard improvement projects, which were classified into defense standard conformity review performance and defense standard improvement performance items. We also simplified the evaluation model by integrating various evaluation items into similar evaluation factors. Additionally, we developed a quantitative evaluation index that enables relative evaluation of the targets and verified the objectivity and validity of the suggested performance evaluation model by reevaluating it using performance data from past commissioned professional institutions Conclusion: Developing a quantitative evaluation model for defense standard improvement projects is expected to provide a means of measuring the effectiveness of the project, and to be used as a tool to determine the appropriateness and effectiveness of medium and long-term project plans.

Meeting the Energy Reduction Goal on a High Rise Building thru IPD Framework

  • Jeong, Pyung Oh;Lee, Peter;Kim, Sang-jin
    • International Journal of High-Rise Buildings
    • /
    • v.2 no.2
    • /
    • pp.93-96
    • /
    • 2013
  • Greenhouse gas emissions and excessive energy consumption have been an on-going world issue nowadays. We can find that the majority portion is caused by high-rise office buildings. In order to resolve these problems, it is extremely important to implement various active or passive strategies in a building design. To successfully meet these design goals and energy reduction approaches, a project building must utilize an efficient design process from the early start. One of the most effective project delivery process called Integrated Project Delivery (IPD) will be implemented in a case study project building (KEPCO) during design phase and show how important it is to plan a project's green environmental performance goal together through an early collaboration from all key project participants, which helps to construct an successful green building design without any critical construction pitfalls.

Efficient Application of Multi-Trade Contract Method to Public Construction Project (공공건설사업 직할시공제 적용의 문제점 및 효율적 적용 방안)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.35-44
    • /
    • 2013
  • Multi-trade Contract Method was introduced as a means of cutting down construction cost of public housing for low income people. Before a specific project delivery method is applied to large public construction project, it is necessary to discuss all the issues raised up from all the parties in construction industry and all the issues which can impact project performance. Thus the interviews were conducted with industrial professionals from diverse organizations and previous studies were investigated to figure out how this newly introduced project delivery method may impact owner's role and responsibility and project performance in terms of cost, schedule, quality and risk. Under the Multi-trade Contract Method, project owner's management tasks will be highly increased, so it should be checked out if the owner can do its role and responsibility. Public owner's organization also needs to be changed and proper project management procedure and system need to be established. In addition, for efficient application of Multi-trade Contract Method, public owner should consider diverse management approach to deliver the project, and how to select and maintain qualified specialty trades.

Prediction of Building Construction Project Costs Using Adaptive Neuro-Fuzzy Inference System(ANFIS) (적응형 뉴로-퍼지(ANFIS)를 이용한 건축공사비 예측)

  • Yun, Seok-Heon;Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.1
    • /
    • pp.103-111
    • /
    • 2023
  • Accurate cost estimation in the early stages of a construction project is critical to the successful execution of the project. In this study, an ANFIS model was presented to predict construction costs in the early stages of a construction project. To increase the usability of the model, open construction cost data was used, and a model using limited information in the early stage of the project was presented. We analyzed existing studies related to ANFIS to identify recent trends, and after reviewing the basic structure of ANFIS, presented an ANFIS model for predicting conceptual construction costs. The variation in prediction performance depending on the type and number of membership functions of the ANFIS model was analyzed, the model with the best performance was presented, and the prediction accuracy of representative machine learning models was compared and analyzed. Through comparing the ANFIS model with other machine learning models, it was found to show equal or better performance, and it is concluded that it can be applied to predicting construction costs in the early stage of a project.