• Title/Summary/Keyword: IT project performance

Search Result 1,413, Processing Time 0.029 seconds

A Study on the Differences of University Performance according to Participation in the Engineering Educational Innovation Support Project (정부재정지원 사업 참여에 따른 대학 성과 차이 분석 연구 : 2018~2020년 공학교육혁신지원사업과 LINC사업을 중심으로)

  • Huh, Ji-suk;Hwang, Yunja
    • Journal of Engineering Education Research
    • /
    • v.25 no.4
    • /
    • pp.13-20
    • /
    • 2022
  • The purpose of this study is to objectively grasp the effect of the engineering education innovation support project among the national engineering-related financial support projects by dividing the groups according to the participation of support projects from 2018 to 2020 and dividing the university performance. As a result of the research the engineering education innovation support project has been consistently producing excellent results of field-based engineering education such as field-oriented industrial-educational collaboration capstone design, technology commercialization, and development and operation of corporate-linked education. It was found that the results showed that the dropout rate of college were lowered. In the future, it needs to be prepared as a place for new and free trials, innovations, and opportunities so that the engineering education innovation support projects can become the mother of other business groups.

Development of Construction Project Performance Management System(PPMS) Considering Project Characteristics (건설 프로젝트 리스크 관리 효율성 향상을 위한 성과측정시스템(PPMS) 개발)

  • Cha, Hee-Sung;Kim, Ki-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.82-90
    • /
    • 2013
  • In the construction industry, there are so many qualitative factors affecting the performance of a project. So it is crucial to measure the factors in an effective way in order to analyze the interrelationship among the various factors. To improve the performance level of a project, it is also important to identify the most appropriate management practices which are inter-linked with the subject project. The purpose of this study is to develop a project performance management system (PPMS) to quantitatively analyze the variety of project performance data and identify the best management practice to increase the potential level of a particular performance area. Using a comparative statistical method, this study developed a quantification method and web-based computerized system to enhance the usage of the system. The system, however, is still under the validation stage because of the shortage of data set. In the future, when more and more completed project data are stored in the system, the system would play a crucial role in predicting the performance level and matching the best management practice for a subject project. In addition, the system can also be modified as a tool for a business- or industry-level system by incorporating the existing enterprise resource programs.

A Study on the Effect of Project Process Quality on Project Success : Focusing on SI(System Integration) Project (프로젝트 과정품질이 프로젝트 성과에 미치는 영향 : 시스템통합 프로젝트를 중심으로)

  • Ko, Deok-Seong;Park, So-Hyun;Kim, Seung-Chul
    • Journal of Information Technology Services
    • /
    • v.18 no.2
    • /
    • pp.75-96
    • /
    • 2019
  • These days, many companies use information systems as a basis for organizational management activities and as an important component of sustainable management. Thus, securing and operating a high-quality information system that can improve the efficiency of business processes is a large part of corporate competitiveness. In order to get such a critical information system, it is only possible to successfully carry out the project. Various attempts and studies have been undertaken to increase the success rate of the project. However, the reality is that the success rate is still not getting much better. In this study, the concept of quality of service, which has long been actively studied in marketing area, was applied as a new factor to enhance the project's success. In this study, project performance activities were defined as the act of providing services. A survey of 164 valid collection data was analyzed. The analysis used SPSS 23. Four process quality factors (customer participation, customer response, knowledge and skills, reliability) and 21 metrics were derived. Through this research, I hope to be the starting point of applying process quality concept as a new breakthrough to increase success rate of project.

Evaluation of the ODA Forest Cooperation Projects in Korea through Stakeholder and Visitor Survey - A Case Study of the Rumpin Seed Source and Nursery Center Projects in Indonesia - (이해관계자와 이용객 설문 조사를 통한 국내 ODA 산림협력사업 평가 연구 - 인도네시아 룸핀양묘장 사업을 대상으로 -)

  • Lee, Hyun-Jung;Kim, Whee-Moon;Kim, Kyeong-Tae;Kim, Young;Choi, Jae-Yong;Song, Won-Kyong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.24 no.2
    • /
    • pp.19-37
    • /
    • 2021
  • It is essential that the evaluation of official development assistance (ODA) projects is conducted based on empirical research for the performance and improvement of the project. This study intended to quantitatively figure out the actual status and performance of ODA projects. The performance of the Rumpin Seed Source and Nursery Center project implemented by the KOICA was evaluated in items of relevance, efficiency, effectiveness, impact, sustainability, which are OECD Development Assistance Committee(DAC) evaluation criteria. From August 26, 2019 to August 29, 2019, a survey was conducted on 50 visitors and 54 stakeholders of the Rumpin Seed Source and Nursery Center. Through on-site survey, problems in the donation project and operation in Indonesia were identified and measures for improvement was grasped. As a result of the study, the value scored by OECD DAC evaluation criteria of the Rumpin Seed Source and Nursery Center project based on the Economic Development Cooperation Fund(EDCF) evaluation grade was evaluated as a very successful class in all items. The average score of the recognition question was 4.08 points for visitors and 4.08 points for stakeholders, and the average score for the satisfaction question was 4.37 points for visitors and 4.11 points for stakeholders, which were high overall in both groups. The main factor that affects the project awareness of the visitors was the fact that the Rumpin Seed Source and Nursery Center was created based on Korean technology, and it was confirmed that Indonesia's own items related to similar projects had a great influence on the project satisfaction. In the case of stakeholders, project support in Korea affected their recognition, and it was found that relevance, efficiency, effectiveness items had the greatest impact on the level of project satisfaction of stakeholders derived from the DAC individual evaluation results. Efforts are required to increase the main factors by reflecting the results of each item and to preserve and maintain the project. This study is significant in determining the performance of the ODA project based on empirical data, and it is believed that it can be used as basic data for supplementing and strengthening the project in the future.

A Case Study on the Team Conflict Phenomenon in IT Service Project (IT서비스 프로젝트에서의 팀 내 갈등현상에 관한 비교사례연구)

  • Park, Sang-Hee;Cho, Nam-Jae
    • Journal of Information Technology Applications and Management
    • /
    • v.16 no.4
    • /
    • pp.109-134
    • /
    • 2009
  • Compared to research on the success of IT projects in general, research on the management of conflict in IT teams and its impact on project success is insufficient. This research performed a comparative study to analyze the nature and evolving phenomenon of conflicts in IT project teams. This study aimed at; First, Why a conflict is created within and around an IT project team. Second, What is the phenomenon of conflict evolution, diffusion, and/or resolution? Third, How the differences in conflict management style affects the IT project performance? Three propositions were drawn from the analysis of two intensive analysis of conflict cases and their comparison. Proposition 1 : Both 'the method of pointing out a problem' and 'the pointed-out contents' can be the trigger of conflicts around an IT project. Proposition 2 : While the focus of attention of one party is 'the method of pointing out a problem', if the other's and focus of attention of one party is 'the pointed-out contents', that is, if the focus of attention mismatch, the conflict can be amplified. Proposition 3 : According to the temporal nature of the relationship, e.g., short-term versus long-term, the way people approach and deal with the conflict differs.

  • PDF

The Effect of PMO Service and Capability on Project Performance (PMO 서비스와 PMO 역량이 프로젝트 성과에 미치는 영향)

  • Lee, Seong-Mong;Kim, Eun-Hong;Moon, Song-Chul
    • Journal of Information Technology Applications and Management
    • /
    • v.20 no.1
    • /
    • pp.107-132
    • /
    • 2013
  • Project management is critical for the success of the large and complicated IT project. Accordingly, to improve the efficiency of the project management, operation of separate Project Management Office (PMO) organization is getting important. Despite the appreciation of PMO as necessary for project success, the result has not always been positive. In this respect, we intended to formalize the PMO success model by incorporating necessary factors related to PMO services and capabilities, and their relationship. Empirical testing results verified critical antecedents comprising PMO services, which included schedule, quality, budget and others. Furthermore, moderating impacts of PMO capabilities are quantitatively assessed. The research findings offer practical insights for successful management of PMO.

Project-based Learning Method to Reorganize the NCS Training Program: Focusing on the 4-Year-Course University (NCS 교육과정 개편을 위한 프로젝트기반 학습법: 4년제 대학을 중심으로)

  • JUNG, Dae-Hyun;WEONG, Jong-Ha
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.28 no.4
    • /
    • pp.1057-1067
    • /
    • 2016
  • National Competency Standards are the major administrative project to build a competence-based society. The manpower for the global society should be recognized by performance rather than educational records. Therefore, all colleges should first nurture NCS-type manpower based on field needs. This study comparatively analyzed the differences between the lecture style of four-year colleges and the outcomes of problem-solving and project-based learning method to prove why it is necessary to introduce the NCS program. Especially, It will review the constraints and measures of NCS introduction to overcome in a four-year university. Through this, it can be used as a means to help improve the field conformity of a four-year college curriculum by presenting the development and utilization of curriculum-based NCS in a four-year university. As a result, it was found that the overall satisfaction with the problem-solving and project-based learning method was above average. Many students were dissatisfied with the traditional teaching methods and the new project-based learning method was relatively effective in college education. Students' participation also improved. Based on the evaluation of learning performance, the new method was found more satisfactory than the old teaching method in terms of comprehension of professional knowledge in various fields, nurturing of logical thinking skills, acquisition of analytical skills, comprehensive thinking skills, creative problem recognition, and open-minded thinking skills.

Improvement of Project Competency for Small IT Companies through SWOT-AHP Analysis (SWOT-AHP 분석을 통한 소규모 IT업체의 프로젝트 수행 역량 개선)

  • Lee, Min-Kyung;Kang, Chang-Wook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.83-89
    • /
    • 2018
  • In the SW industry, the diversification of global markets and technology trends are changing due to the emergence of new services, and IT companies are in need of strategic change different from the previous one. In this study, SWOT analysis was performed by extracting the internal environmental factors and external environmental factors through the previous studies to improve the project performance competence of small IT companies, and the SWOT Matrix was reconstructed through the pairwise comparison. Based on this, the purpose of this research was to propose the project performance competency improvement plans for small IT companies based on importance and priority, and the following four strategies were derived from the result of SWOT-AHP analysis. SO strategy was drawn in direction to invest R & D in new SW industry to enhance technology competitiveness of SMEs in order to develop SMEs, and in order to secure competitiveness of SW industry, WO strategy is drawn the cultivation of professional technical manpower through SW policy. ST Strategy presented technical management through SW system improvement policy to improve SW environment, and WT Strategy presented awareness training on the construction and necessity of project management system construction. Using the strategies presented in this study, it is expected that the managers of small IT firms will be presented as references to measure the performance competence factors of current organizations and company organizations.

The Empirical Analysis on the Performance of Inter-firm Network Management in the IT Service Firms (IT서비스 기업에서의 네트워크 경영 관련 성과 요인에 대한 실증 연구)

  • Ahn, Yeon S.
    • Journal of Information Technology Services
    • /
    • v.10 no.1
    • /
    • pp.47-64
    • /
    • 2011
  • In the IT(Information Technology) service, which supply the solutions related to business management and IT, network construction and application trends, the related service business are increasing according to the enlargement of project scope and the diversity of project types as the need of service customers. In this paper, I propose the significant effect factors on the network management of IT service firms. The key findings are from the analysis result about 94 IT service firms as follows. For implementation the high performance of network management in the IT service firms, the strategic elements in the process of network construction are more conceived highly than the basic element in them. Also the perspective of project objectives are considered than the nominal perspectives in the partner selection process. The competency of partner firms', the cooperation process between the partner firms', network relation operation management and network relation structure management are the significant effect factors of network management.

A Research on the PMO Functions and PMO Management Level to Increase the IS Project Performance (정보시스템 프로젝트 성과 향상을 위한 PMO 기능과 관리수준에 관한 연구)

  • Lee, Jae-Beom;Jang, Yun-Hi;Kim, Sang-Yeol
    • Journal of Digital Convergence
    • /
    • v.9 no.2
    • /
    • pp.111-129
    • /
    • 2011
  • Nowadays, the IS project is getting more and more complicated and large-scaled. Many researchers and practitioners are interested in the IS development methodologies, automated tools and techniques to decrease project failure and to increase IS project performance. This research is to seize the management level of PMO affecting on the IS project, as a new method to increase the IS project development performance. As a result of surveying the present PMO operation state with banks which are the leading industry to accept the PMO in Korea, technology support management and infrastructure management are the core functions to affect the IS performance including schedule management, quality management, and user and stakeholders' satisfaction. Also, the PMO management level is the important point of IS project success. Among the 5 levels PMI suggested, PMO can implement the project effectively at least at the third level. Korean companies introducing the PMO have to do research the PMO core functions and the management levels according to the project scale, and review the distinctive features of their organization to increase the maturity of IS project. This research has been proved through the Full Structural Equation Model. The results show that the five core functions of PMO have relationship with the IS project performance.