• Title/Summary/Keyword: IT in Construction

Search Result 21,564, Processing Time 0.05 seconds

A Study on Developing the Business Index of Electrical Construction Business (전기공사업 경기지수 개발에 관한 연구 - 전기공사업 경기종합지수(ECI) 및 기업경기실사지수(EBSI)를 중심으로 -)

  • Park, Houng-Hee;Kim, Mi-Ri
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.107-118
    • /
    • 2014
  • Electrical Construction industry uses Construction industry's statistical data for business outlook. Because there are not electrical construction business view's statistical data. It has own unique characteristic which is different from construction industry. So it must have a electrical construction Business Index. This study was focused on developing the business index of electrical construction business. Electrical construction business index consists of electrical construction composite Index(ECI) and the electrical construction business survey index(EBSI). This study experimentally analyzes the business views of electrical construction industry in 2/4 quarter of 2014. The leading Index of ECI indicates -0.4% compared with 1/4 quarter of 2014, coincidence index also shows that electrical construction industry's business cycle is in an economic downturn. EBSI is 83.5 in 2/4 quarter of 2014, down from 95.2 in 1/4 quarter of 2014. It means that electrical construction company has a pessimistic prediction. As a result we know that the Business Index of Electrical Construction Business shows similar results. It is expected to make contribution for electrical contractors to establish management strategies and prepare responses to economic changes by providing information about economic trends of electrical construction business and forecasting future economy.

Bayesian Model for Cost Estimation of Construction Projects

  • Kim, Sang-Yon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.91-99
    • /
    • 2011
  • Bayesian network is a form of probabilistic graphical model. It incorporates human reasoning to deal with sparse data availability and to determine the probabilities of uncertain cases. In this research, bayesian network is adopted to model the problem of construction project cost. General information, time, cost, and material, the four main factors dominating the characteristic of construction costs, are incorporated into the model. This research presents verify a model that were conducted to illustrate the functionality and application of a decision support system for predicting the costs. The Markov Chain Monte Carlo (MCMC) method is applied to estimate parameter distributions. Furthermore, it is shown that not all the parameters are normally distributed. In addition, cost estimates based on the Gibbs output is performed. It can enhance the decision the decision-making process.

An Estimating System for the CO2 Emissions using Discrete Event Simulation (이산 사건 시뮬레이션을 활용한 건설공정 CO2 배출량 추정 시스템)

  • Yi, Chang-Yong;Gwak, Han-Seong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.196-197
    • /
    • 2014
  • Low carbon construction is an important operation management goal such as cost, time, and quality in construction community. This paper introduces a system which measures the variability of carbon dioxide amounts. First, this system allows creating construction operation models of which the level of detail is breakdown into the work task level. Second, the system implements sensitivity analysis along with a ranges of resources that are allocated in an operation model. It facilitates to find the optimal resource combination using the operation performances such as the amount of emissions, operation completion time, and cost. Lastly, it identifies the best fit probability distribution functions of performance criteria given a certain resource combination. It allows project manager to query the percentages to complete the operation within a limitation specified by the system users.

  • PDF

VRML based Realtime RFID+4D Progress Management System Development (VRML기반 실시간 RFID+4D 진도관리 시스템 개발)

  • Park, Jae-Hyun;Yoon, Su-Won;Choi, Cheol-Ho;Chin, Sang-Yoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05b
    • /
    • pp.99-102
    • /
    • 2010
  • Today's construction is higher and more complex. So types and amounts of needed materials for construction project are increasing and those are occurred problems in construction site such as insufficient working space, confusion of materials handling order and working circulation. Because of those problems, research of progress management system using RFID+4D has been studied, but it is impossible to manage progress and material statement in real-time. So this study analyzed problems of current research and suggested VRML based RFID+4D Progress Management System. This Study focused on system basic concept and interface is designed for system development. This research is still progressing, so it has to do more development and research. However, it could be expected construction management efficiency and automation of management tasks.

  • PDF

Design of an Information System Prototype for Generating and Linking Ultra-precision Digital Maps of Construction Sites (건설 현장의 초정밀 디지털 맵 생성 및 연계를 위한 정보체계 프로토타입 설계)

  • Kim, Jong-Hyeop;Yeom, Dong-Jun;Ko, Hyun-A;Kang, Tai-Kyung
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.6_2
    • /
    • pp.1015-1024
    • /
    • 2020
  • By nature, smart construction technology is a convergence technology, therefore aptly constructing and running an information system is needed in order to effectively develop and maintain it. Thus, in this study, an information system prototype was developed for the creation and linking of high precision digital maps at road construction sites for the effective performance of the development of the Information Collecting and Analyzing Techniques in the Construction Site (ICAT). For this, (1) defined input/output (I/O) data of each technical detail of ICAT, (2) analyzed the data flow, (3 ) proposed an information system prototype for high precision digital maps development and connection. Based on the information system prototype constructed in this study, it was inferred that each technique and its information for the Smart Construction Technique Development Business was in a consistent flow. Developed information system prototype would enable effective cooperation between subjects directly involved in the technique development, by defining I/O data in advance. Moreover, it would be of value to practitioners for refining the output data from each technique, thereby linking databases and forming Entity Relationship Diagram.

CONSTRUCTION FATAL ACCIDENTS IN VIETNAM: AN EXPLORATORY STUDY

  • Soo-Yong Kim;Luu Truong Van;Yurl Hur
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.327-336
    • /
    • 2007
  • Construction activities are characterized as hazardous work. Therefore, it is very imperative to explore comprehensively fatal accidents and safety performance in both developed and developing countries. The goal of this study was to look at the reasons behind fatal accidents in HCMC, Vietnam's largest city. The survey sample consists of 91 fatal accident cases in total that occurred in construction sites during the years 1996-2005 and were reported to the Department of Labor-Invalids-Social Affairs in HCMC. The study was conducted by means of field surveys with relevant individuals working in construction sites and statistical analyses. The research resulted in failing to wear/use PPE as unsafe acts and in poor safety management procedures/methods in sites as insecurely working conditions behind serious accidents in the construction. The paper stresses that accidents tended to occur more in state-owned companies than in others and involved more with masonry/welding people and workers without labor contracts than with other workers.

  • PDF

Ontology based Integrated Construction Information Management for Modernized Traditional Housing (Hanok)

  • Lee, Heewoo;Lee, Yunsub;Jin, Zhenhui;Gebremichael, Dagem Derese;Jung, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.162-169
    • /
    • 2022
  • In an attempt to disseminate modernized Korean traditional housing (Hanok), a ten-year research project was initiated in 2010 by the Korean Government to reduce the construction cost, improve the facility performance, and automate the Hanok construction industry. To meet these objectives, various research areas, including public policies, planning methods, design standards, new building materials, construction standards, maintenance procedures, advanced project management tools, and integrated IT applications have been developed. In addition, comprehensive technologies developed were applied to the ten pilot Hanok buildings to validate the real-world performance as part of the research project. To further facilitate the digital transformation of the Hanok industry by using the research results, it is required to disseminate the developed technologies in an automated and standardized manner. In particular, it is crucial to systematize and manage the interoperability of various technical data and accumulated historical data for different business functions, especially within the highly fragmented industry. In this context, this paper proposes an ontology-based Hanok information dissemination platform to enable industry-wide automated knowledge and information sharing. The system architecture, standardized historical database, and advanced analytics based on ontology web language (OWL) for the Hanok industrialization platform are introduced.

  • PDF

Performance Analysis for Proposing Proper Construction Method for Joints of Polyurea Waterproofing Membrane Coating (폴리우레아 도막방수재의 이음부 적정 시공안 제안을 위한 성능 분석)

  • Lee, Jung-Hun;Kim, Byoungil
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.77-86
    • /
    • 2024
  • In this study, an evaluation was conducted for a total of 16 conditions to suggest an appropriate construction method for the construction joint of polyurea waterproofing membrane coating. It was analyzed that the longer the construction time difference, the higher the rate of water leaks through joints, and it was confirmed that water leaks could be prevented through primer construction. In addition, since the surface of polyurea exposed outdoors for a long period of time is deteriorated and weakened, it was analyzed that polishing the area increases surface damage and affects the formation of the interface. During maintenance construction, it would be desirable to apply a primer before construction, and it is believed that using the same urea-based material will ensure waterproofing stability.

Evaluation of Construction RCB Exterior Wall Formwork according to Placing Height on Nuclear Power Plant

  • Song, Hyo-Min;Sohn, Young-Jin;Shin, Yoonseok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.6
    • /
    • pp.653-660
    • /
    • 2015
  • Technologies for reducing construction duration are key factors in nuclear power plant construction projects, as a reduction in construction duration at the construction phase leads to a reduction in construction cost and an increase in profits through the early operation of the nuclear power plant. To analyze the constructability of the height of single-layer placement of formwork for the Reactor Containment Building (RCB) exterior wall through lateral pressure according to the height of concrete placement, the deformation criteria for formwork, and a new form design, 'MIDAS GEN (hereinafter referred to as MIDAS)' is used in this study. The cost and workload of formwork are derived according to the unit of height of the RCB exterior wall. Based on the result, it was found that the higher the RCB exterior wall, the higher the material cost, and the less the construction duration and the less the total number of formwork layers. Based on this result, it is believed that the material cost and the construction duration can be appropriately determined according to the formwork height.

Experimental Study on Wall Transmission Loss of Electric wave for the RTLS Application of Building Construction Project (건설현장 RTLS 활용을 위한 전파의 벽체 투과손실에 관한 실험적 연구)

  • Lee, Jong-Kook;Lee, Young-Hun;Park, Jung-Hyun;Son, Min-Ji
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.95-101
    • /
    • 2009
  • Although the concept of RTLS is very unfamiliar to construction industry, recently it is popular in other industry, such as logistics, ship building, mobile telecommunication based on state-of-the-art information technology. Effective resource management using cutting-edge information technology makes it possible to succeed a project with saving the time and cost. And effective information management in construction project can be achieved by the new technologies such as RFID, WEB-based internet, DB technology, real-time monitoring technology, etc. This paper suggest the characteristics and applicability of the international standard electric waves to be used for the real-time locating system (RTLS) on the viewpoint of transmission loss in construction field to monitor and manage resources of construction project effectively The two types of electric waves based on the international standard is to be suggested after surveying the as-is technology in the related industries and then is analyzed to find out the characteristics of those by the concept of the electric wave transition loss in the several construction situations. Two main electric waves, the 2.4GHz and the 433MHz technologies as the international standard is researched on the applicability to the indoor environment of construction site.