ON CODING AND UNIT-TEST PROCESS MANAGEMENT FOR SOFTWARE DEVELOPMENT OF LARGE-SCALE

  • Kino Yasunobu
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 1998.11a
    • /
    • pp.233-238
    • /
    • 1998
  • To manage a phase of coding and unit-test, project managers have used to pay attention to a number of completed programs. And the manager makes a graph of progress. Usually, this graph of progress has S shape and doesn't linearly depend on the workload. So the degree of progress seems to be behind. In actual, many projects tend to be behind the schedule. Because of this reason, it is difficult to judge whether the project is behind or not in the early stage. In this paper, We propose the 'four-division model' to solve this difficulty.

  • PDF

A Study on the Application of Scheduling & Planning for Nuclear R &D Projects : Cas of LMR Project (원자력연구개발사업의 공정관리 적용 사례 연구)

  • 한도희
    • Journal of Korea Technology Innovation Society
    • /
    • v.2 no.3
    • /
    • pp.118-128
    • /
    • 1999
  • This study attempts to provide an efficient method for managing the Nuclear R&D projects. It should be noted that the technology and experiences to develop a well-balanced plan and mon-itoring for the R&D project are not yet well established when compared with the commercial con-structionand engineering projects. This study recommends that the R&D project manager utilize the scheduling techniques to establish an integral management system taking in to account the un-certainties in the research environment. Based upon the results of a case study for the Liquid Metal Reactor Design Technology Development Project which is led by the KAERI this study also con-firms that it is possible to run the national nuclear R&D projects with the Scheduling & Planning.

  • PDF

A study on the development on project scope management module using rule and case-based reasoning (규칙과 사례기반추론 기법을 이용한 프로젝트 범위관리 모듈 개발에 관한 연구)

  • Shin, Ho-Kun;Jeon, Sung-Ho;Kim, Chang-Ho
    • The Journal of Information Technology
    • /
    • v.7 no.3
    • /
    • pp.127-137
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of a project. Scope management for a project planning is also essential job in system integration project. However project planning is very difficult because lots of factors and their relationships should be considered. Therefore project planning of system integration project has been done by project manager's own knowledge and experience. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study presents a methodology to cope with the limitations of the existing studies that have uniformly been customizing the methodology by only project complexity. We propose PPSM(Project planning support module) based on determination rules regarding route maps and document levels, and CBR(Case-Based Reasoning) for WBS identification.

  • PDF

A Study on the Development of Evaluation System on the Construction Project Manager's Safety Capability (건설사업관리자의 안전역량 평가체계 개발에 대한 연구)

  • Shin, Dong Hyuk;Seong, Joo Hyun;Yook, In Soo;Lee, Myeong-Gu;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.4
    • /
    • pp.40-45
    • /
    • 2017
  • Among various methods to build the construction safety, the consecutive improvement by the measuring and evaluating safety management capabilities for the construction participants such as an owner, a contractor, and a supervisor (construction project manager) can be the effective one. Thus, an effective evaluation and grading criteria to provide performance index for the implementation of safety management activities should be necessary. In this regards, the purpose of this study is to verify the adequacy by offering a competency evaluation system for the supervisor's safety capability and by applying the system to some construction sites. The proposed evaluation system was developed on the basis of the principles of safety management & accident prevention, basic elements of safety and health management system, and safety evaluation cases at home and abroad. The trial evaluation showed that the safety management of the construction site is mainly carried out by the contractor and the supervisor's awareness for the safety management is low on the whole. Especially, it is urgent to improve the support system from the supervisor headquarter and to place the dedicated safety management person in the field.

Introduction of Detailed Design of Rach Gia Bypass Project in Vietnam (기술사마당_기술해설 - 베트남 락지아(Rach Gia) 우회도로 사업 실시설계소개)

  • Kang, Hee-Chul
    • Journal of the Korean Professional Engineers Association
    • /
    • v.43 no.4
    • /
    • pp.44-49
    • /
    • 2010
  • Th Rach Gia Bypass Project, to be implemented under EDCF Loan VNM-12, constitutes a strategically important part of the Greater Mekong Sub-region Southern Coastal Corridor Project(the GMS-SCCP). The main goal of the GMS strategy is to promote sustainable economic growth, improve employment, and achieve poverty reduction by tapping the comparative advantages of Vietnam, Cambodia and Thailand. As a project manager who once took a responsible position for the completion of RGBP's detailed design, I would like to briefly introduce what our design team including the local sub-contractors had performed for the D/Design of this Project last year, especially in the field of highway, bridge and soft soil treatment method widely used in Mekong Delta area. With the performance of nearly two Projects due to the V.O. in one year on the prescribed time, it was a hard year but a rewarding one. To expand our horizon more about overseas projects, several recommendations for the brighter future of overseas projects are shown herein this paper.

  • PDF

Discriminant Analysis for the Prediction of Unlawful Company in Defense Procurement (국방조달에서 부정당업자 판별분석 모형 개발)

  • Han, Hong-Kyu;Choi, Seok-Cheol
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.14 no.3
    • /
    • pp.467-473
    • /
    • 2011
  • The contractor management for the effective defense project is essential factor in the modern defense acquisition task. The occurrence of unlawful company causes hastiness for project manager and setback to the deployment of defense weapon system. In this paper, we develop a prediction model for the effective defense project by using the discriminant analysis and analyse the variables that discriminate the unlawful company in many variables. It is expected that our model can be used to improve the project management capability of defense acquisition and contribute to the establishment of efficient procurement procedure through entry of the reliable defense manufacturer.

Impacts of PM's Leadership Type on Project Performance in PPP Project (PPP 사업에서 프로젝트관리자(PM)의 리더십유형이 프로젝트성과에 미치는 영향)

  • Hwang, Jae-Seung;Boo, Jeman
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.41-49
    • /
    • 2018
  • Recently, PPP (Public-Private-Partnership) Projects, which private companies invest in, plan, design, construct and operate, have become more popular around the world. The construction industry environment is becoming increasingly competitive. The PPP project is composed of various organizations, so it is very difficult to carry out the project successfully. In this environment, the construction companies are trying hard to secure a competitive advantage. In this study, we tried to identify the role of project manager's leadership and project citizenship behavior as a precedent for creating performance in PPP (Private-Public-Partnership) project. We examine the impact of PM's transformational leadership and transactional leadership on project citizen behavior and examine the impact of project citizen action on project management performance and completion performance. For this study, we conducted a questionnaire survey on PPP project participants. As a result, the following results were obtained. First, transformational leadership and transactional leadership had a significant influence on project citizenship behavior. Second, project citizen behavior had a significant impact on both project management performance and project completion performance. The idealized influence of transformational leadership and the Active management by exception of transactional leadership were found to be very important in shaping PPP team's project citizenship behavior. Therefore, this study has academic implications in studying the effects of PM leadership and project citizenship behavior on the performance of PPP project. And it is expected that it will help selection and training of PM to secure a competitive advantage for construction companies that implement PPP projects practically.

A STUDY ON SPACE ZONING BY COMPUTING IDLE-TIMES IN CONSTRUCTION PROCESSES

  • Sang-Min Park;Won-Suk Jang;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.509-512
    • /
    • 2013
  • An inappropriate space zoning plan causes the unnecessary transportation of construction material and equipment among work areas and increases the disorder of work space. Space zoning is an essential operation management technique which contributes to reduce the process and/or operation idle-time. This paper introduces a method that computes the idle-times between construction operations (or processes) by using Web-CYCLONE. It allows computing with idle-times that affect the construction productivity. Using the idle time between operations and between processes, it computes the optimal number of zones and finds the optimal combination of zones that minimize the idle times. The method contributes to minimize the idle times relative to the operation schedule using complete enumeration. This paper presents the system prototype in detail. A case study is presented to demonstrate the system and verifies the validity of the model. It allows a project manager to establish space zoning plan that effectively segregates a project into optimal number of construction zones and to assign the constrained resources (e.g., laborer, equipment).

  • PDF

The Effect of PL Leadership and Characteristics of Project on Project Participants' Satisfaction and Performance (PL 리더십 성향과 프로젝트 특성요인이 프로젝트 참여 만족 및 성과에 미치는 영향)

  • Yang, Hee-Dong;Kim, Myung-Jin;Kang, So-Ra
    • Asia pacific journal of information systems
    • /
    • v.20 no.4
    • /
    • pp.53-79
    • /
    • 2010
  • The study was originated from recognition that project participants' satisfaction should be Improved to raise project performance and to make progress of a successful project since the above dissatisfaction was operated as a danger factor of the project. The study selected one large-scale sample project and attempted measuring characteristics of the project, participants' satisfaction and project performance with the whole project participants. The study analyzed correlations between individual level (team members) and group level (development team), and examined what effect a sub project manager under complicated hierarchical organization of the large-scale project, namely PL (project leader)'s leadership style had on each individual project participant's satisfaction and what effect project uncertainty in organization/technology environment had on project participants' satisfaction and project performance. The study verified that development team (group) had an effect on team member (individual)-level project participants' satisfaction by disclosing that there was a significant dispersion among groups within project participants' satisfaction by each individual. It is analyzed that it is necessary to make improvement through approach by each pertinent team to raise individual-level project participants' satisfaction. The study also verified PL's ideal leadership under strict methodology and hierarchical control of the large-scale project. Based on the verification of the hypotheses, the results of the analysis were produced as follows. First, the development team affects the satisfaction level that an individual has when he/she participates in a project. This suggests that the satisfaction with project participation should be improved at the team level. In addition, the project management style and leadership orientation of the manager of a sub project who is mostly affected by the team proved to have a direct influence on the satisfaction with project participation and project performances. Second, both the performance-oriented leadership and the relationship-oriented leadership of the PL of the development team were verified to have a significant effect on the satisfaction of the team members associated with project participation. In other words, when the team members recognize that the PL of the development team shows both the performance-oriented leadership and the relationship-oriented leadership, their satisfaction with project participation increases accordingly. Third, it was verified that the uncertainty of the organizational environment significantly affects the satisfaction level when the PL of the development team exerts a relationship-oriented and performance-oriented leadership. The higher the uncertainty of the organizational environment is, the more the satisfaction with project participation decreases whereas the relationship-oriented leadership has a more positive effect on the satisfaction than the performance-oriented leadership style. Fourth, when the PL of the development team exerts the relationship-related and performance-related leadership, the uncertainty of the technological environment has a significant influence on the satisfaction level. The higher the uncertainty of the technological environment is, the more the satisfaction with project participation decreases whereas the performance-oriented leadership has a more positive effect on the satisfaction than the relationship-oriented leadership style. The result of the research on the uncertainty of the project environment suggests that when the development team leader exerts a relationship-oriented and performance-oriented leadership style, the uncertainty of the organizational environment has a significant effect on the satisfaction with project participation; the higher the uncertainty of the organizational environment, the more the satisfaction level decreases, and the relationship-oriented leadership style affects the satisfaction level more positively than the performance-oriented leadership style. In addition, when the development team leader displays a relationship-oriented and performance-oriented leadership style, the uncertainty of the technological environment has a significant effect on the satisfaction with project participation; the higher the uncertainty of the technological environment. the more the satisfaction level decreases. The performance-oriented leadership style as well affects the satisfaction level more positively than the relationship-oriented leadership style. Based on the above results, the research provides the following implications when handling multiple concurrent projects. First, the satisfaction with the participation in the multiple concurrent projects needs to be enhanced at the team (group) level. Second. the manager of the project team, particularly the middle managers should have both a performance-oriented and relationship (task and human)-oriented attitude and exert a consolidated leadership in order to improve the satisfaction of team members with project participation and their performances. Third, as the uncertainty factor of the technological and organizational environment among the characteristics factors of the project has room for methodological improvement depending on one's effort even though there are some complications, we need to continuously prevent and control the risks resulting from the uncertainties of the technological and organizational environment of the project in order to enhance the satisfaction of project participation and project performances. Fourth, the performance (task)-oriented leadership is required when there is uncertainty in a technological environment while the relationship (human)-oriented leadership is required when there is uncertainty in an organizational environment. This research has the following limitations. First, this research intended to select one large-sized sample project and measure the project characteristics, the satisfaction of all the participants associated with project participation, and their performances. Therefore, it is inappropriate to generalize and apply the result of this result onto other numerous projects. Second, as this case study entailed a survey to measure the characteristics factors and performance of the project, since the result value was based on the perception of project team members, the data may have insufficient objectivity. Third, though this research targeted on all the project participants, some development teams did not provide sufficient data and questionnaires were collected from some specific development teams among the 23 development teams, causing a significant deviation in the response rate among the development teams. Therefore, we need to continuously conduct the follow-up researches making comparisons among the multiple projects, and centering on the characteristics factors of the project and its satisfaction level.

The Research on the Managing Method for Reasonable Amount of Inventory in Construction Site Using Inventory Model and BIM Data. (재고모형과 BIM 데이터를 활용한 건설현장의 적정 재고 관리방안에 대한 연구)

  • Kim, Ban-Seok;Park, Byung Joo;Park, Jung-Lo;Kim, Joo-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.119-120
    • /
    • 2012
  • The management for materials and inventory is one of the factors which are considered the most for profits of a business in almost all industrial fields. Resource procurement which occupies more than 40% of an overall construction cost has a strong relationship with profits of a business but it is regarded as a work for a manager rather than for a technician. It makes the importance of resource procurement relatively low and slows down the development of workings. As the construction project becomes more larger and complicated, effective management for materials are directly affecting the profits of a business. Therefore, this research works on finding an economical managing method for materials according to a characteristic of construction project based on accurately forecasted BIM data. Finding a reorder point by using BIM data which contains an accurate data for schedule and material enables a better management for materials and provides more accurate data on matters which were used to be determined by an intuition of a manager.

  • PDF