• Title/Summary/Keyword: IT Project Manager

Search Result 196, Processing Time 0.027 seconds

High Resolution Hydroacoustic Investigation in Shallow Water for the Engineering Design of Railroad Bridge (철도교량 설계 지반조사를 위한 고분해능 수면 탄성파반사법의 응용 사례)

  • ;Swoboda Ulrich
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.231-238
    • /
    • 2001
  • To investigate the underground structure of shallow water, Han-river near Yangsou-Ri, high resolution hydroacoustic measurements were carried out for the engineering design of railroad bridge. The acoustic source was a Boomer with an energy of 90 to 280J and in a frequency range up to about 16KHz. The reflected signals were received by using both traditional hydrophones(passive element) and a specially devised receiver unit(active element) mainly composed of piezofilms and preamplifier. They are connected to the "SUMMIT" data acquisition system(DMT-GeoTec company), where the sampling interval was set to 1/32㎳. The source position was continuously monitored by a precision DGPS system whose positioning accuracy was on the order of loom. For the quality control purposes, two different source-receiver geometries were taken. That is to say, the measurements were repeated along the profile everytime depending on the different source energy(175J, 280J), the receiving elements(passive, active) and two different source-receiver geometries. It was shown that the data resolution derived from a proper arrangement with the active hydrophone could be greatly enhanced and hence the corresponding profile section caused by the regular data processing system "FOCUS" accounted excellently for the underground formation below the shallow water.w the shallow water.

  • PDF

Comparison of the required abilities in construction site between field managers and students (국내 건축시공(建築施工) 전공교육(全功敎育)에 대한 건설현장(建設現場)의 인식(認識) 및 요구(要求)에 관한 연구(硏究))

  • Lee, Hak-Ju;Song, Jae-Hyuck;Seo, Jang-Woo;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.123-126
    • /
    • 2008
  • The construction industry highly depends on each specialized manager which is essential to successful project. However, a new employee, who has just graduated from architectural engineering college, is requested additional education for 1~2 years such as On-the-Job-Training (O.J.T) to perform his/her professional job in construction site. It is wasteful for both construction company and the employee in terms of time and cost. The purpose of this paper is to investigate the required abilities and analyze the gap of demanded abilities between field managers and students. To collect data for analysis, questionnaire which uses Likert Scale has been performed to both parts. As a result, the analysis show that the graduate's abilities related to field experience get especially low degrees in compare with non-field experience factors. These results will contribute architectural engineering education in college to make more realized.

  • PDF

A Study on the Effects of Six Sigma Management on the Quality and Marketing Performances (6시그마 경영이 품질 및 마케팅 성과에 미치는 영향에 관한 연구)

  • Chang Hyung-Gul;Lee Yong-Hak
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.5
    • /
    • pp.185-212
    • /
    • 2005
  • The ultimate objectives of the six sigma activities are to raise quality of products to the level where customers can be satisfied and to improve marketing efficiency through cost reduction. Recently, many businesses have been struggling to find out the most successful way to implement the six sigma to produce better results. This study is significant in a way that it provides readers with an actual evidence of efficiency and effectiveness of six sigma activities in marketing performance for the first time. The major data of this study can be divided into two categories ; First, secondary data research method was utilized to find out the effects of six sigma management on the quality and marketing performances, theoretically and empirically. Second, test of established hypotheses relevant to the effects of six sigma management on the quality and marketing performance based on the propositions drawn from existing literatures, and test hypotheses statistically. This study of six sigma looked into benefits in manufacturing industry in terms of improving quality, cutting cost and decreasing defection product-defect rate. In addition, the study has verified that how the quality performances can affect the marketing performances, such as enhancing corporate image, sales increase and customer satisfaction. The author believes that this study will help many businesses acquire best methods to increase sales and profits. And, business manager will be able to understand where to focus as they proceed with the six sigma project and improve corporate competitiveness.

Development of a Web-based Schedule Tool Using Flash (플래시를 이용한 웹기반 일정관리 도구 개발)

  • Jang, Myung-Houn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.51-57
    • /
    • 2010
  • Schedule management of construction work is important in order to complete construction projects within a given period of time. As activities increase and relations become more complex, schedule management software becomes increasingly necessary. To address this, attempts are being made to incorporate web-based ICT (information and communications technology) in construction project management. This research proposed a method to manage construction schedules via web pages using Flash. The interactive and graphic property of Flash enables a field manager to manage schedules easily and efficiently. A prototype was implemented using Flash and Action Script, and it was applied to a sample network in a web page.

APPLICATION OF WIRELESS INCLINOMETER FOR DISPLACEMENT MEASUREMENT OF TEMPORARY EARTH RETAINING PILE

  • Chi Hun In;Hong Chul Rhim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.218-223
    • /
    • 2009
  • During the process of excavation for substructures of buildings, precise and constant measurements of retaining wall displacement is crucial for construction to be complete and safe. Currently an inclinometer is used to measure displacement around the perimeter of an excavation site. The existing inclinometer system requires an instrument to be placed inside pre-bored holes for each measurement with an typical interval of two weeks. This makes it difficult to obtain continuous displacement data, especially during a critical time such as rainy season in summer. Also, the existing inclinometer is placed at certain distance away from the retaining wall system itself. Thus, exact measurement of retaining wall movement is compromised because of the distance between the retaining wall and the inclinometer. This paper presents the development of wireless inclinometer system for the displacement measurement of retaining walls by being attached directly to the retaining wall. The result of the application of the developed systems are provided with advanced ubiquitous sensor network (USN) system features. The USN technique incorporated into the system enables users to monitor movement data from wherever possible and convenient such as construction manager's office on site or any other places connected through internet. The research work presented in this paper will provide a basis to save construction time and cost by preventing safe-related unexpected delay of construction due to the failure or collapse of retaining walls.

  • PDF

A Case Study on the Effectiveness of the Cooperative Management by Leading of Forest Owners and Its Extension System - A demonstrational cooperative management in the private forest guided by the Korean German Forest Management Project - (산주주도형(山主主導型) 협업경영사업(協業經營事業)과 그 지도체계(指導體系)의 효과(效果)에 대한 사례연구(事例硏究) -한독기구(韓獨機構) 사유림협업경영(私有林協業經營) 시범사업(示範事業)을 중심(中心)으로-)

  • Kim, Jong Kwan
    • Journal of Korean Society of Forest Science
    • /
    • v.67 no.1
    • /
    • pp.17-27
    • /
    • 1984
  • The Yangsan Forest Management Station (YFMS) of Korean German Forest Management Project (KGFMP), working with the 6 legal villages of Uljugun, Kyongnam, led the forest owners in the area to organize the Forest Management Cooperative (FMC) voluntairily for improvement of private forest management and fostered it as a model from May 1975 to Apr. 1984. YFMS sent out FMC a forest manager as a forestry expert carrying out the leading extension program at the equal position with forest owners and gave FMC financial, administrative and technical assitances. During the 6 years from 1977 to 1982, 4 FMC were founded and are being operated democratically. 228 forest owners have taken the membership of their own free will and the forestland of the members covers 2,567 ha equivalent to 57% of the total private forest in the area. During the period the total area of the planting and tending is 4,185 ha, this means that a member executed 3.1 ha of forest operations per year in average, showing the high willingness on forest operations. In addition the joint works have resulted in the joint properties equivalent to 27 million Won and it will be an important foundation for operation of FMC which is a forest owners's cooperative organization for improvement of private forest management in this area. The total expenditure spent for the fostering of FMC amounted to 497,587 thousand Won and 58% of them were charged from KGFMP funds, 27% from the forest owners and 15% from public funds. The expenditure for investment was 273,104 thousand Won and 59% of the sum were appropriated as subsidies at the national level. The forest owners charged 43% of that and this means that each member invested approximately 100 thousand Won to his forestland per year in average. For the extension program 169,503 thousand Won were spent and it can be explained that 5,885 Won were spent per ha a year. The organization of FMC operated autonomously in a democratic way and the horizontal and leading extension system, which aspects the human rights, were very much effective in fostering the cooperative organization of forest owners for improvement of private forest management.

  • PDF

Efficient Application Way of Six Sigma at Railway Construction Project (철도건설사업의 6시그마의 효율적 적용방안)

  • Hong, Sung-Heui;Jung, Sung-Bong
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1251-1262
    • /
    • 2011
  • K-company, being in charge of domestic railway construction and facilities management, got a success rate of 41% with the implement of a improvement scheme by prosecuting of 6 Sigma and the achievement of CTQ (Success criteria : more than 0.5 in achievement of CTQ). It is clear that the factors having an effect on achievement of CTQ are the level of project when pushing forward the project(Big Y and small y according to the scope of the work), the degree of interest of an officer in charge like sponsors, and the continuous feedback toward the implement of a improvement scheme. For improvement CTQ achievement, firstly redefine about a type of project. Secondly, derive small y by Big Y and derives a unit work by small y. Then grouping the unit works and achieve Big Y by performing of every unit work as an executive subject. Thirdly organize a committee of subject selection which is supervised by the general manager. Therefore exhibit staff's leadership, for example motivation, by strong incentives. Lastly, provide ongoing learning and enhance system monitoring about a result management of an betterment execution department.

  • PDF

The Development of Next Generation Smart PMIS System (차세대 스마트형 PMIS 시스템 개발)

  • Park, Kyung-Mo;Im, Chul-Woo;Kim, Chang-Duk;Jeong, Hyung-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.117-130
    • /
    • 2013
  • It is a difficult thing to administer a various task in the construction site because, the person placing an order are eagerly demanding for the reduction of project duration as the trend of construction are becoming larger and international. The advanced country have made an effort to development PMIS based on the Web, which to exchanges a various construction information such as Time Management/Construction Management/Resource Management/Document Management to solve these problems since 2000. However, the expectation to develop a smart PMIS that can deal with a more quick change of a various process are becoming lager as the lively supply of IT equipment such as smart phone and table PC. The research are aim to develop the next generation smart PMIS, which is link with the table PC and smart phone for a site manager to use the system based on the web in the movement. Also, it has an object in view to introduce the development process and the major function of the next generation PMIS.

Development of BIM Utilization Level Evaluation Model in Construction Management Company (건설사업관리기업의 BIM 활용수준 평가 모형 개발)

  • Jeong, Seo-Hee;Kim, Gwang-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.4
    • /
    • pp.24-33
    • /
    • 2024
  • Recently, as smart construction has become more active, construction companys are evaluating their smart construction capabilities in order to transform into smart construction companies. However, the revitalization of smart construction doesn't only apply to construction companies, the level of utilization of all participants, including owners, designers, construction project managers, and construction company, must be improved. Therefore, this study aims to present a model that evaluate the building information modeling (BIM) utilization level for measuring the BIM utilization level of construction management companies in executing construction project management. In this study, an AHP questionnaire survey targeting BIM practitioners to calculate the weight of each BIM utilization item and score it to construct evaluation model and evaluate it by applying it to construction management companies are conducted. As a result of the evaluation using model, there were differences between companies in the number of BIM users, and in the qualitative evaluation, it is mainly used for interference review, constructability review, and design change management. Therefore, in order to revitalize BIM, it is believed that it is necessary to strengthen BIM utilization ability through separate training for construction manager (CMr) and to present clear utilization standards and scope of work for BIM utilization in performing construction management tasks. Consequently, evaluating more construction management companies using the model presented in this study will result in the transition of CM companies to smart construction and revitalization of BIM adoption.

An Analysis of a Request for the Development of Computer Application Technology in an Architectural Construction Management System (건축공정 관리시스템의 전산적용 최적화를 위한 시스템 개발 요구 분석)

  • Kwon, Choon-An;Ji, Suk-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.6
    • /
    • pp.567-575
    • /
    • 2011
  • With the development of construction information, a computerization tool for architectural process control is a necessary tool. However, the reality is that the conditions and understanding of users are not sufficient to fully utilize such a tool. In particular, it was analyzed that the reason for the negative feedback from hands-on workers regarding the current process control information system is that there is a difficulty in accessing the system for users that are not process and planning experts, due to a lack of information and technical contents at the phase of control and planning prior to the process plan. Therefore, the demands of users and a direction for the improvement of a system in terms of optimizing process control computerization were investigated, with the aim of addressing the disadvantages of the existing system and developing a professional system that is specialized in the construction industry. Therefore, it is necessary to construct an integrated WBS (IWBS) that combines WBS with CBS, and subsequently, it is judged that the most important aspect is the integrated technology of compatibility and operation of data that is linked with OBS. The process information must then deal with the changing information; in other words, the amount of construction, construction cost, and the required construction period etc., by coding data into a 4-unit index, such as a project unit (WBS Level 1), a project facility unit (WBS Level 2), a management department unit (OBS Level 1), and a control manager unit (OBS Level 2). After that, it was found that it is necessary to develop a computer system to consistently integrate process information into a management department.