Proceedings of the Korean Geotechical Society Conference
/
2001.03a
/
pp.231-238
/
2001
To investigate the underground structure of shallow water, Han-river near Yangsou-Ri, high resolution hydroacoustic measurements were carried out for the engineering design of railroad bridge. The acoustic source was a Boomer with an energy of 90 to 280J and in a frequency range up to about 16KHz. The reflected signals were received by using both traditional hydrophones(passive element) and a specially devised receiver unit(active element) mainly composed of piezofilms and preamplifier. They are connected to the "SUMMIT" data acquisition system(DMT-GeoTec company), where the sampling interval was set to 1/32㎳. The source position was continuously monitored by a precision DGPS system whose positioning accuracy was on the order of loom. For the quality control purposes, two different source-receiver geometries were taken. That is to say, the measurements were repeated along the profile everytime depending on the different source energy(175J, 280J), the receiving elements(passive, active) and two different source-receiver geometries. It was shown that the data resolution derived from a proper arrangement with the active hydrophone could be greatly enhanced and hence the corresponding profile section caused by the regular data processing system "FOCUS" accounted excellently for the underground formation below the shallow water.w the shallow water.
Proceedings of the Korean Institute of Building Construction Conference
/
2008.05a
/
pp.123-126
/
2008
The construction industry highly depends on each specialized manager which is essential to successful project. However, a new employee, who has just graduated from architectural engineering college, is requested additional education for 1~2 years such as On-the-Job-Training (O.J.T) to perform his/her professional job in construction site. It is wasteful for both construction company and the employee in terms of time and cost. The purpose of this paper is to investigate the required abilities and analyze the gap of demanded abilities between field managers and students. To collect data for analysis, questionnaire which uses Likert Scale has been performed to both parts. As a result, the analysis show that the graduate's abilities related to field experience get especially low degrees in compare with non-field experience factors. These results will contribute architectural engineering education in college to make more realized.
The ultimate objectives of the six sigma activities are to raise quality of products to the level where customers can be satisfied and to improve marketing efficiency through cost reduction. Recently, many businesses have been struggling to find out the most successful way to implement the six sigma to produce better results. This study is significant in a way that it provides readers with an actual evidence of efficiency and effectiveness of six sigma activities in marketing performance for the first time. The major data of this study can be divided into two categories ; First, secondary data research method was utilized to find out the effects of six sigma management on the quality and marketing performances, theoretically and empirically. Second, test of established hypotheses relevant to the effects of six sigma management on the quality and marketing performance based on the propositions drawn from existing literatures, and test hypotheses statistically. This study of six sigma looked into benefits in manufacturing industry in terms of improving quality, cutting cost and decreasing defection product-defect rate. In addition, the study has verified that how the quality performances can affect the marketing performances, such as enhancing corporate image, sales increase and customer satisfaction. The author believes that this study will help many businesses acquire best methods to increase sales and profits. And, business manager will be able to understand where to focus as they proceed with the six sigma project and improve corporate competitiveness.
Journal of the Korea Institute of Building Construction
/
v.10
no.2
/
pp.51-57
/
2010
Schedule management of construction work is important in order to complete construction projects within a given period of time. As activities increase and relations become more complex, schedule management software becomes increasingly necessary. To address this, attempts are being made to incorporate web-based ICT (information and communications technology) in construction project management. This research proposed a method to manage construction schedules via web pages using Flash. The interactive and graphic property of Flash enables a field manager to manage schedules easily and efficiently. A prototype was implemented using Flash and Action Script, and it was applied to a sample network in a web page.
International conference on construction engineering and project management
/
2009.05a
/
pp.218-223
/
2009
During the process of excavation for substructures of buildings, precise and constant measurements of retaining wall displacement is crucial for construction to be complete and safe. Currently an inclinometer is used to measure displacement around the perimeter of an excavation site. The existing inclinometer system requires an instrument to be placed inside pre-bored holes for each measurement with an typical interval of two weeks. This makes it difficult to obtain continuous displacement data, especially during a critical time such as rainy season in summer. Also, the existing inclinometer is placed at certain distance away from the retaining wall system itself. Thus, exact measurement of retaining wall movement is compromised because of the distance between the retaining wall and the inclinometer. This paper presents the development of wireless inclinometer system for the displacement measurement of retaining walls by being attached directly to the retaining wall. The result of the application of the developed systems are provided with advanced ubiquitous sensor network (USN) system features. The USN technique incorporated into the system enables users to monitor movement data from wherever possible and convenient such as construction manager's office on site or any other places connected through internet. The research work presented in this paper will provide a basis to save construction time and cost by preventing safe-related unexpected delay of construction due to the failure or collapse of retaining walls.
The Yangsan Forest Management Station (YFMS) of Korean German Forest Management Project (KGFMP), working with the 6 legal villages of Uljugun, Kyongnam, led the forest owners in the area to organize the Forest Management Cooperative (FMC) voluntairily for improvement of private forest management and fostered it as a model from May 1975 to Apr. 1984. YFMS sent out FMC a forest manager as a forestry expert carrying out the leading extension program at the equal position with forest owners and gave FMC financial, administrative and technical assitances. During the 6 years from 1977 to 1982, 4 FMC were founded and are being operated democratically. 228 forest owners have taken the membership of their own free will and the forestland of the members covers 2,567 ha equivalent to 57% of the total private forest in the area. During the period the total area of the planting and tending is 4,185 ha, this means that a member executed 3.1 ha of forest operations per year in average, showing the high willingness on forest operations. In addition the joint works have resulted in the joint properties equivalent to 27 million Won and it will be an important foundation for operation of FMC which is a forest owners's cooperative organization for improvement of private forest management in this area. The total expenditure spent for the fostering of FMC amounted to 497,587 thousand Won and 58% of them were charged from KGFMP funds, 27% from the forest owners and 15% from public funds. The expenditure for investment was 273,104 thousand Won and 59% of the sum were appropriated as subsidies at the national level. The forest owners charged 43% of that and this means that each member invested approximately 100 thousand Won to his forestland per year in average. For the extension program 169,503 thousand Won were spent and it can be explained that 5,885 Won were spent per ha a year. The organization of FMC operated autonomously in a democratic way and the horizontal and leading extension system, which aspects the human rights, were very much effective in fostering the cooperative organization of forest owners for improvement of private forest management.
K-company, being in charge of domestic railway construction and facilities management, got a success rate of 41% with the implement of a improvement scheme by prosecuting of 6 Sigma and the achievement of CTQ (Success criteria : more than 0.5 in achievement of CTQ). It is clear that the factors having an effect on achievement of CTQ are the level of project when pushing forward the project(Big Y and small y according to the scope of the work), the degree of interest of an officer in charge like sponsors, and the continuous feedback toward the implement of a improvement scheme. For improvement CTQ achievement, firstly redefine about a type of project. Secondly, derive small y by Big Y and derives a unit work by small y. Then grouping the unit works and achieve Big Y by performing of every unit work as an executive subject. Thirdly organize a committee of subject selection which is supervised by the general manager. Therefore exhibit staff's leadership, for example motivation, by strong incentives. Lastly, provide ongoing learning and enhance system monitoring about a result management of an betterment execution department.
Park, Kyung-Mo;Im, Chul-Woo;Kim, Chang-Duk;Jeong, Hyung-Seok
Korean Journal of Construction Engineering and Management
/
v.14
no.2
/
pp.117-130
/
2013
It is a difficult thing to administer a various task in the construction site because, the person placing an order are eagerly demanding for the reduction of project duration as the trend of construction are becoming larger and international. The advanced country have made an effort to development PMIS based on the Web, which to exchanges a various construction information such as Time Management/Construction Management/Resource Management/Document Management to solve these problems since 2000. However, the expectation to develop a smart PMIS that can deal with a more quick change of a various process are becoming lager as the lively supply of IT equipment such as smart phone and table PC. The research are aim to develop the next generation smart PMIS, which is link with the table PC and smart phone for a site manager to use the system based on the web in the movement. Also, it has an object in view to introduce the development process and the major function of the next generation PMIS.
Korean Journal of Construction Engineering and Management
/
v.25
no.4
/
pp.24-33
/
2024
Recently, as smart construction has become more active, construction companys are evaluating their smart construction capabilities in order to transform into smart construction companies. However, the revitalization of smart construction doesn't only apply to construction companies, the level of utilization of all participants, including owners, designers, construction project managers, and construction company, must be improved. Therefore, this study aims to present a model that evaluate the building information modeling (BIM) utilization level for measuring the BIM utilization level of construction management companies in executing construction project management. In this study, an AHP questionnaire survey targeting BIM practitioners to calculate the weight of each BIM utilization item and score it to construct evaluation model and evaluate it by applying it to construction management companies are conducted. As a result of the evaluation using model, there were differences between companies in the number of BIM users, and in the qualitative evaluation, it is mainly used for interference review, constructability review, and design change management. Therefore, in order to revitalize BIM, it is believed that it is necessary to strengthen BIM utilization ability through separate training for construction manager (CMr) and to present clear utilization standards and scope of work for BIM utilization in performing construction management tasks. Consequently, evaluating more construction management companies using the model presented in this study will result in the transition of CM companies to smart construction and revitalization of BIM adoption.
Journal of the Korea Institute of Building Construction
/
v.11
no.6
/
pp.567-575
/
2011
With the development of construction information, a computerization tool for architectural process control is a necessary tool. However, the reality is that the conditions and understanding of users are not sufficient to fully utilize such a tool. In particular, it was analyzed that the reason for the negative feedback from hands-on workers regarding the current process control information system is that there is a difficulty in accessing the system for users that are not process and planning experts, due to a lack of information and technical contents at the phase of control and planning prior to the process plan. Therefore, the demands of users and a direction for the improvement of a system in terms of optimizing process control computerization were investigated, with the aim of addressing the disadvantages of the existing system and developing a professional system that is specialized in the construction industry. Therefore, it is necessary to construct an integrated WBS (IWBS) that combines WBS with CBS, and subsequently, it is judged that the most important aspect is the integrated technology of compatibility and operation of data that is linked with OBS. The process information must then deal with the changing information; in other words, the amount of construction, construction cost, and the required construction period etc., by coding data into a 4-unit index, such as a project unit (WBS Level 1), a project facility unit (WBS Level 2), a management department unit (OBS Level 1), and a control manager unit (OBS Level 2). After that, it was found that it is necessary to develop a computer system to consistently integrate process information into a management department.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.