Variations in Multi-family House Prices Following Remodeling Work

  • Kim, Jae-sung;Cho, Kyuman
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.689-690
    • /
    • 2015
  • The remodeling of multi-family houses (MFH) has emerged as a significant issue in the construction industry. Many decision makers struggle with the decision to remodel because of insufficient information including standards or methods for projecting the price of their structure after remodeling. In this context, this research analyzed the change in price of MFHs after remodeling. To achieve this research goal, (i) the price data from 14 groups (i.e., MFH renovation cases and equivalent MFH cases without remodeling) were collected, and (ii) the trend of price variation among each group was analyzed. Finally, this research suggests price variations of each group in terms of three different time points (i.e., before remodeling, after remodeling, and the present), which shows the effects of remodeling on the price of MFHs. This research offers a framework for the development of a model that will predict the price of an MFH after remodeling.

  • PDF

공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안 (Apartment house project cost schedule for integrated management BIM-based BoQ application plan)

  • 정련의;김웅기;함남혁;김재준
    • 한국BIM학회 논문집
    • /
    • 제11권2호
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.

복수 개${\cdot}$보수 프로젝트의 자금제약하 프로그램 관리 - 자원제약 마스터-일정계획을 중심으로 - (Organizational Program Management of Multiple Maintenance Projects Under Fund Constraints)

  • 구교진
    • 한국건설관리학회논문집
    • /
    • 제5권2호
    • /
    • pp.211-218
    • /
    • 2004
  • 다수의 시설물을 보유한 기관에서는 유지보수와 리모델링(M/R) 프로젝트들이 동시에 진행되고 있다. 내부기능인력에 의해 프로젝트를 수행하는 자원제약 환경에서 프로젝트 관리자는 각 프로젝트의 완료일과 기관내 가용한 자원에 대한 제한을 고려하며 프로그램을 계획하고 관리하게 된다. 다중 자원제약 M/R 프로그램의 효과적 관리를 위해 이 논문은 장기적인 프로그램 계획축과 단기적인 일정창으로 구성되는 2단계 계층관리모델을 제안한다. 프로그램 플랜을 위한 연동계획기법은 연속되는 프로젝트 요청의 불확실성에 대처하기 위해 제안되었다. 일정창 속에서 마스터-일정계획을 수립하기 위해 개발된 PCR 일정계획 알고리즘은 M/R 프로그램에서의 작업반내 기능인력의 배치계획을 제공한다. 스프레드쉬트 인터페이스를 활용하여 M/R 프로그램의 일정계획 시스템을 개발하였고, 연속된 3개의 일정창으로 설계된 시뮬레이션 실험을 통해 개발된 일정계획 알고리즘과 기존의 자원제약 일정계획 휴리스틱의 성능을 비교하였다.

공동주택 개발 사업의 비용분석을 위한 시스템 다이내믹스 모델 개발 연구 (Development of a System Dynamics Model for Cost Analysis of Housing Development Projects)

  • 김근우;윤석헌
    • 한국건축시공학회지
    • /
    • 제11권3호
    • /
    • pp.221-228
    • /
    • 2011
  • 본 연구에서는 아파트 개발 사업의 타당성 분석을 위한 시스템다이내믹스 모델을 개발하고 사례연구를 수행하고자 하였다. 연구에서는 기존의 아파트개발 사업 사례와 연구 프로젝트 자료들을 근거로 현금흐름 구성요소들을 도출하였고, 시스템사고 방법과 시스템다이내믹스 모델을 사용하여 이들 요소의 상호 영향관계를 찾고자 노력하였다. 연구에서는 모델을 정의하고 분석하기 위해 Vensim이라는 시스이내믹스 소프트웨어를 사용하였다. 이렇게 도출된 모델을 검증하기 위해 사례 연구를 진행하였으며, 사례연구 결과 연구에서 개발한 모델이 실제 프로젝트에 적용이 가능할 것으로 판단되었다. 연구에서 도출된 모델은 아파트 개발사업자들이 프로젝트의 초기단계에 프로젝트 파이낸싱과 관련한 의사결정에 도움이 될 수 있을 것으로 판단된다.

20세기 중반 실험주택의 특성에 관한 연구 -케이스 스터디 하우스를 중심으로- (A Study on the Characteristics of the Experimental House in the Mid-twentieth Century -focused on he Case Study Houses-)

  • 안은희;이정욱
    • 한국실내디자인학회논문집
    • /
    • 제17호
    • /
    • pp.143-149
    • /
    • 1998
  • After the Industrial Revolution. most of experimental houses were had focused on the way of construction structure and material of buildings. Especially the Case Study Houses among experimental house of the mid-twentieth century were appreciated as an important case in a viewpoint of technology space and aesthetics. The Case Study Houses program was started by the sponsorship of magazinein California 1945 after the World War II. From 1945 to 1966. for about 20years more than 36 house projects were progressed by the Case study House Program This research divided and organized the expression characteristics of the Case Study Houses' technical spacious and artistic aspects. As a result the experimental housing concept that was established within the Case Study Houses became the remarkable concept of the modern architecture that is successfully accomplished within the frame of housing.

  • PDF

발주자를 위한 프로젝트 성과측정기준선 설정 방안에 관한 연구 (A study on the Project Performance Measurement Baseline for Clients)

  • 고대준;최은아;박동진;이상범
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.513-516
    • /
    • 2008
  • 건설프로젝트는 많은 불확정 요소로 인해 다양한 리스크를 가지고 있기 때문에 프로젝트 진행 과정에서 반복적인 성과측정은 중요하다. 그러나 현재 건설프로젝트에서 성과측정은 시공사 중심의 성과측정 및 성과관리가 이루어 져서 프로젝트의 진행상황에 따른 발주자의 능동적인 프로젝트 관리가 어렵다. 이에 본 연구에서는 실제 실행된 공공 아파트 건설공사의 공기 비용 데이터를 타입별로 분류하여 회귀분석을 실시하고 타입별 회귀식을 도출, 발주자 중심의 작업분류체계를 설정하고 이를 활용하여 이를 발주자 중심의 성과측정기준선을 제안방안을 제시하고자 한다.

  • PDF

공동주택 공사의 작업지연요소 분석 (An Analysis on Work Delay Factors in Apartment House Construction)

  • 안상현;유정호;김창덕
    • 한국건설관리학회논문집
    • /
    • 제8권6호
    • /
    • pp.159-166
    • /
    • 2007
  • 작업지연은 건설사업의 확실성을 저해하는 요소이다. 따라서 작업지연 원인에 대한 분류체계를 확립하고 관리항목을 도출하는 것은 건설사업의 경쟁력을 향상시킬 수 있는 요인이다. 하지만 분류별 작업지 연원인의 정량적 분석에 따른 중점관리 항목 도출에 대한 연구는 미흡하다. 따라서 본 연구에서는 설문조사와 인터뷰를 통한 공동주택 공사의 작업지연요소를 공종별로 도출하였다. 그 결과, 골조공사와 마감공사에서는 작업자수 부족이 전기설비에서는 작업자 능력이 그리고 기계설비에서는 선행 작업 미완료가 중점관리 대상으로 도출되었다.

아파트와 한옥의 LCC(Life Cycle Cost)분석 사례 연구 (A Case study of Life Cycle Cost Analysis on Apartment houses and Han-Ok)

  • 김근우;윤석헌
    • 한국건축시공학회지
    • /
    • 제10권6호
    • /
    • pp.1-6
    • /
    • 2010
  • 건축물의 총 소유비용을 분석하기 위해서는 초기단계의 설계와 시공비용 이외에도 기획비용, 유지관리 및 운영비용을 고려해야 한다. 이를 LCC(Life Cycle Cost)라고 부른다. 현재, 충분한 데이터와 기준의 부족으로 인해 LCC의 분석에 많은 어려움을 겪고 있다. 본 연구에서는 건축물의 LCC 분석 방법을 제시하고, 현대식 아파트와 전통 한옥 주택에 대한 LCC 사례 분석을 수행하고자 한다. 사례 연구의 결과 한옥이 현대식 아파트에 비해 유지보수와 운영 비용에 있어서 보다 효율적인 것으로 조사되었다.

공동주택 벽 철근 조립 생산성 향상 방안에 관한 연구 (Productivity Improvement Method of Wall Rebar Work in Apartment House Construction)

  • 김민규;김영길;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.159-160
    • /
    • 2019
  • Reinforced concrete construction is one of the labor intensive construction projects and its productivity is very low. It is necessary to increase the productivity of rebar construction for improving the productivity of construction work. Therefore, in this study, the rebar drawings of apartment buildings are analyzed to prefabricate wall rebar unit shaped mesh in the factory and installing it on site. If the proposed wall rebar unit is applied to apartment construction working time of wall rebar can be reduced by 50% or more.

  • PDF

공동주택 개발사업 타당성 평가항목에 관한 연구 (A Study on the Evaluation Criteria for Feasibility Analysis of Apartment House Development Project)

  • 홍주현;고성석
    • 한국건설관리학회논문집
    • /
    • 제10권1호
    • /
    • pp.102-113
    • /
    • 2009
  • 공동주택 개발사업의 기획 추진시 사업의 성공적인 성과를 이루기 위해서는 기획단계에서의 수익성과 분양성에 대한 현실적인 평가와 분석을 통한 정량적 예측과 이에 대한 보완 개선적인 과정이 가장 중요한 요소라 할 수 있다. 특히, 개발사업 수행 중에서 기획단계에서의 초기 분양율 예측을 통한 사업타당성 분석 및 검증은 전체사업의 기대수익과 성공가능여부 예측면에서 중점 고려요소들을 분석하고 미흡한 요소에 대한 투자와 개선을 유도함으로써 개발사업의 리스크 인자를 감소시키고 사업의 성공가능성을 확대시킴으로써 그 효과를 극대화 할 수 있다. 이와 같은 관점에서 본 연구에서는 공동주택 개발사업 타당성 검토요소 및 항목간 중요도 산정지표 연구를 기반으로 하여, 민간 공동주택 사례별 실제 초기분양율을 비교 분석함으로써, 산정지표 중 누락된 항목 및 추가적으로 고려해야 할 항목을 중요도 조사결과를 바탕으로 추가적으로 배점화하여 4분야 9항목의 33세부 평가내용으로 조합하여 공동주택의 수익성과 분양성 예측을 위한 효율적인 평가항목과 기준을 제시하였다.