• Title/Summary/Keyword: Heavy Construction Equipment

Search Result 177, Processing Time 0.024 seconds

Innovative Methodology for Assembling Jack up Leg of 205m on ground of Ultra

  • Yang, Yeong-Tae;Sim, Song-Seop;Lee, Seung-Yeop;Hwang, Oe-Ju;Sin, Bong-Yeong
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2003.10a
    • /
    • pp.87-92
    • /
    • 2003
  • Generally, in jack up rig design for harsh environment, its leg height is a major factor for achieving a sufficient serviceability & operability in terms of the worst environment and the workable depth. Due to difficulties in constructing such a high-slender leg, inaccessibility of yard fabrication equipment, etc. the construction of Jack up rig fur harsh deep sea has not been common. Method using heavy crawler crane, fabrication tower or extension by the floating crane vessel is still conventional construction but, considering high cost fur mobilizing heavy lift vessel (HLV) or additional marine work for implementing preload / full height test at sea, the ground-base construction is much advantageous. Air skidding method (ASM hereafter) is ground-based construction methodology, newly developed due to such requests. ASM could also be extended to similar engineering fields. This paper presents the operating sequence, design parameters and procedure which were verified through successful operation at the end of May 2002.

  • PDF

Development of a Design Support Program for Pivot Points of Working Devices in Construction Equipment using Planar Multi-body Dynamic Analysis (평면 다물체 동역학 해석을 이용한 건설장비 작업장치의 링크 피봇점 설계 지원 프로그램 개발)

  • Park, Hyun-Gyu;Jang, Jin-Seok;Yoo, Wan-Suk;Kim, Min-Seok;Lee, Hee-Jong;Lee, Jae-Wook
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.14 no.6
    • /
    • pp.49-56
    • /
    • 2015
  • For designing working devices of construction equipment, it is necessary to consider not only sufficient working ability but also available working range. Therefore, it is important to select the appropriate pivot positions of links. This paper presents a study on selection of pivot points of links used in construction equipment. To analyze the effect of each pivot point, a design program for pivot selection is developed. A conventional pivot design method requires a complicated process because it needs to create a certain working position manually to evaluate its performance. However, the developed program includes an automatic link assembly algorithm; thus, the working device can easily be analyzed by using pivot information of links. The developed program also included a kinematic/static analysis module and characteristic analysis algorithms. Therefore, it is possible to easily analyze a working device model created through the automatic assembly algorithm, whereby users can easily analyze the effect of each link pivot point for the actual product design.

Feasibility Study on Road Bridge Passed by Heavy Equipment Transporter (HETS 차량의 교량 통과 가능성에 관한 연구)

  • Kang, Young-Chul;Lee, Pil-Jae
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.12 no.2
    • /
    • pp.236-247
    • /
    • 2009
  • In Korea, the driving system restriction criteria is strictly applied(gross weight 400kN, axial load 100kN). Especially after the Seoungsu Bridge accident, safety factor has been strictly applied. The Safety factor is applied to the cumulative results for each steps like design, construction, maintenance of the Bridge. Because of it, the bridge is undervalued compared to its capacity. So, this generates loss for both private and military sector(eg. logistical delays, structural damage, etc.). But analyzing data from many existing researches we have confirmed that the military heavy vehicle may pass through the first class bridges. In consequence, this study have focused on determining whether HETS vehicles can pass over the first class bridge, without safety issues, using MIDAS structural analysis program. The results have confirmed that the military heavy vehicle may pass over the bridge.

A Study on Equipment and Space Composition of Heavy Ion Therapy Center (중입자치료센터의 장비 및 공간 구성에 관한 연구)

  • Hong, chang pyo
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.26 no.4
    • /
    • pp.7-14
    • /
    • 2020
  • Purpose: The purpose of this study is to provide basic information for the establishment of a Heavy Ion Therapy center by analyzing the cases of Heavy Ion Therapy devices, introducing the equipment and space composition of Heavy Ion Therapy equipments. Methods: This study is carried out by study the Heavy Ion Therapy, by figure out status of the installation of treatment centers around the world and by analyze the composition of Heavy Ion Therapy equipments and spaces through case studies. Results: The results of this study, which investigated the treatment of Heavy Ion Therapy and analyzed the plans of the five Heavy Ion Therapy centers, are summarized as follows. 1) Heavy Ion equipment requires a significant floor area. Vertical as well, many cross-sectional areas need to be secured for the construction of a delivery system. The Heavy Ion Therapy device should be built as a shielded wall because of the radiation leaking. Therefore, it is necessary to consist of a independent treatment center. 2) The size of Heavy Ion devices is getting smaller. Linac can be put into syncrotron. and the size of syncrotron, delivery system, and rotating-gantry is getting smaller. 3) Japan is often installed for treatment, and control rooms are integrated, while Europe has secured research space and each control room is separated. Implications: People are not familiar with the Heavy Ion Therapy. And the effectiveness of the treatment is not well promoted yet. Hopefully, more attention will be paid to the research involved in the Heavy Ion Therapy.

Development of Productivity-based Estimating Tool for Fuel Use and Emissions from Earthwork Construction Activities

  • Hajji, Apif M.;Lewis, Michael Phil
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.2
    • /
    • pp.58-65
    • /
    • 2013
  • Earthwork activities are typically performed by heavy duty diesel (HDD) construction equipment that consumes large quantities of diesel fuel use and emits large quantities of pollutants, including nitrogen oxides (NOx), particulate matters (PM), hydrocarbon (HC), carbon monoxide (CO), and carbon dioxide ($CO_2$). This paper presents the framework for a model that can be used to estimate the production rate, activity duration, total fuel use, and total pollutants emissions for earthwork activities. A case study and sensitivity analysis for an excavator performing excavations are presented. The tool is developed by combining the multiple linear regressions (MLR) approach for modeling the productivity with the EPA's NONROAD model. The excavator data from RSMeans Heavy Construction Data were selected to build the productivity model, and emission factors of all type of pollutants from NONROAD model were used to estimate the total fuel use and emissions. The MLR model for the productivity rate can explain 92% of the variability in the data. Based on the model, the fuel use and emissions of excavator increase as the trench depth increase, but as the bucket size increase, the fuel use and emissions decrease.

Research on the safety working instructions in the retaining wall construction (concrete retaining wall) (옹벽(콘크리트 옹벽)의 안전작업 지침 개요)

  • Oh, Ki-Taek;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.1
    • /
    • pp.25-33
    • /
    • 2016
  • This guidance purpose is setting Safety Health work instruction for prevent accident such as falling from heights work, collapse and trapped under the heavy equipment and Sediment collapse during retaining wall work by unsder the Industry Safety and Health rules.

High Productive Welding Technologies for Large Container Ship (대형 컨테이너선 건조를 위한 고능률 용접기술)

  • Goo, Yeon-Baeg;Sung, Hee-Joon;Choi, Kee-Young;Kim, Kyeong-Ju
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2009.09a
    • /
    • pp.80-86
    • /
    • 2009
  • In order to improve productivity of large container ship construction, large heat input and/or high productive welding technologies are necessary. This can be achieved by the joint research and cooperation among steel maker, welding consumable company, welding equipment company and ship yards. Two electrodes SAW process is effective the plate butt welding and partial joint welding, while FGB welding process is for the connection of block to block joint. The higher strength and thicker steel is developed, the more reliable welding procedure such as two electrodes EGW including light weight welding equipment should be developed.

  • PDF

Aerial Working Platform Training Simulator (고소작업대 조종훈련용 시뮬레이터)

  • Ki, Jae-Sug
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2007.04a
    • /
    • pp.133-141
    • /
    • 2007
  • Aerial working platform is recently used broadly in heavy industry and construction field and also the utilization of it is growing. However, the raise of critical incident caused by unskilled operator is increasing gradually. To reduce and prevent such incident, the training for operating is essential. It's not easy to cover the requirements for the training with real platform because of the high price of it, safety and weather condition. This paper proposes a simulator for the training based on virtual reality to give the training safely regardless to the weather condition and the simulator is deliverable in lower price than real one. The simulator proposed in this paper is available to be set according to the level of trainee managing the assessment level and be also applied for the design of general heavy equipment training simulator based.

  • PDF

Pile Moniotring for Offshore Jacket Structures ; Field Study (해상 자켓 구조물 파일 모니터링 현장 사례)

  • Kim, Dae-Hak;Lee, Kyu-Hwan;Park, Chan-Duck;Moon, Sang-Wook;Kim, Hak-Jung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.1237-1244
    • /
    • 2006
  • This research discussed about method for basis construction of sea jacket construction. Several access ways of method for foundation construction of sea jacket construction are used. Accompany many efforts of design and build process to overcome the form of construction work and application equipment, special quality of construction and restriction and so on of sea environment in the case of pile foundation. Therefore, great many factor of sea condition, construction special quality, base condition, construction time, equipment composition, worker composition etc. shows other work form in spot at sea jacket construction process.

  • PDF

Study on the Impact Coefficient of the Lifting System (조금구의 충격계수에 관한 연구)

  • 하대환
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.3
    • /
    • pp.64-67
    • /
    • 2001
  • In resent the weight of structure is heavier and bigger than before. Engineers use many heavy equipments to erect buildings and bridges. The heavy equipment is very useful to lift any weight. But most engineers do not know the impact of the weight when the equipment lifts the weight. In this study one researched into the impact of the weight in the crane work which lifts the weight in the construction site. Also along the number of pulley sheave the impact of the weight was researched. From the impact field test the impact coefficient of a single pulley sheave crane was 0.65 and the four pulley sheaves crane was 0.13. The result shows that the impact coefficient of a single pulley crane is more than 5 time of the impact coefficient of the four pulley sheaves crane and that engineers must consider the impact effect of the crane work in the construction site.

  • PDF