• Title/Summary/Keyword: Ground Facility

Search Result 425, Processing Time 0.026 seconds

Generation of critical and compatible seismic ground acceleration time histories for high-tech facilities

  • Hong, X.J.;Xu, Y.L.
    • Structural Engineering and Mechanics
    • /
    • v.26 no.6
    • /
    • pp.687-707
    • /
    • 2007
  • High-tech facilities engaged in the production of semiconductors and optical microscopes are extremely expensive, which may require time-domain analysis for seismic resistant design in consideration of the most critical directions of seismic ground motions. This paper presents a framework for generating three-dimensional critical seismic ground acceleration time histories compatible with the response spectra specified in seismic design codes. The most critical directions of seismic ground motions associated with the maximum response of a high-tech facility are first identified. A new numerical method is then proposed to derive the power spectrum density functions of ground accelerations which are compatible with the response spectra specified in seismic design codes in critical directions. The ground acceleration time histories for the high-tech facility along the structural axes are generated by applying the spectral representation method to the power spectrum density function matrix and then multiplied by envelope functions to consider nonstationarity of ground motions. The proposed framework is finally applied to a typical three-story high-tech facility, and the numerical results demonstrate the feasibility of the proposed approach.

Operating Process Design and Verification on the Oxidizer Filling Ground Facility for Liquid Rocket (액체로켓 산화제 지상공급시스템의 운용 프로세스 설계 및 검증)

  • Kim, Ji-Hoon;Park, Soon-Young;Park, Pyun-Goo;Yoo, Byung-Il
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2011.11a
    • /
    • pp.781-783
    • /
    • 2011
  • The oxidizer filling system, ground facility of the launch complex, should accept difficult requirements from the launcher sufficiently. The launcher do not have unnecessary insulators for mass reduction and manages liquid oxygen mass fastidiously to satisfy the mission requirement. So, the ground facility should be able to accept its requirements, then we should make the operating process being adjusted. In this paper, the operating process design and verification results on the oxidizer filling ground facility for liquid rocket is demonstrated.

  • PDF

Ground Firing Test Facility of Hybrid Rocket Engine (하이브리드로켓엔진 지상연소시험 설비)

  • Kim, Soo-Jong;Kim, Gi-Hun;Cho, Jung-Tae;Cho, Min-Kyoung;Do, Gyu-Sung;So, Jung-Soo;Heo, Jun-Young;Lee, Jung-Pyo;Park, Su-Hayng;Moon, Hee-Jang;Sung, Hong-Gye;Kim, Jin-Kon
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2008.11a
    • /
    • pp.251-254
    • /
    • 2008
  • Ground firing test facility and test field for firing test of hybrid rocket engine were constructed. Ground firing test facility were composed of hybrid rocket engine, thrust stand, oxidizer storage/supply system, control system and data acquisition system. Firing tests of thrust 50 kgf class were conducted. Stable performance data was obtained and operational reliability of ground firing test facility were found.

  • PDF

Rocket Engine Test Facility Improvement for Hot Firing Test of 75 ton-f Class Gas Generator and Cold Flow Test (75톤급 가스발생기 연소시험을 위한 시험장 개선 및 수류시험)

  • Kang, Dong-Hyuk;Lim, Byoung-Jik;Ahn, Kyu-Bok;Seo, Seong-Hyeon;Han, Yeoung-Min;Choi, Hwan-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2009.11a
    • /
    • pp.29-33
    • /
    • 2009
  • On the basis of the development experience of a gas generator for the 30 ton-f thrust liquid rocket engine combustor a Subscale Ground Firing Test Facility was designed and fabricated for a gas generator for the 75 ton-f thrust liquid rocket engine combustor. The Subscale Ground Firing Test Facility developed is going to be used to develop 75 ton-f class gas generator. Acquired data and test technique from this facility will be used to develope the high performance liquid rocket engine combustor and the Ground Firing Test Facility. This report describes the improved Subscale Ground Firing Test Facility for 75 ton-f class gas generator and results of the cold flow test.

  • PDF

Operation Techniques of Liquid Rocket Engine Combustor Ground Firing Test Facility (액체로켓엔진 연소기 지상연소시험설비 운영관리 기술)

  • Kang, Dong-Hyuk;Lim, Byoung-Jik;Moon, Il-Yoon;Seo, Seong-Hyeon;Han, Yeoung-Min;Choi, Hwan-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2006.11a
    • /
    • pp.157-162
    • /
    • 2006
  • A Liquid Rocket Engine(LRE) ground firing test facility was built in Korea Aerospace Research Institute(KARI) in 2001 to develop the LRE for the first Korean liquid rocket, KSR-III. Around 170 tests were conducted since its establishment until recently by September 2006, and in the meantime, a considerable improvements were made in the capability. This paper describes the outline, conducted tests and operation techniques which have been accumulated through the operation of KARI LRE ground firing test facility.

  • PDF

Operation and Maintenance Techniques for Liquid Rocket Combustor Ground Firing Test Facility (액체로켓 연소기 지상연소시험설비 운영 및 관리 기술)

  • Kang, Dong-Hyuk;Lim, Byoung-Jik;Moon, Il-Yoon;Seo, Seong-Hyeon;Han, Yeoung-Min;Choi, Hwan-Seok
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.11 no.3
    • /
    • pp.43-49
    • /
    • 2007
  • A ground firing test facility for Liquid Rocket Engine(LRE) combustor was built in Korea Aerospace Research Institute(KARI) in 2001 to support the development of the first Korean LRE for the KSR-III. About 170 tests were conducted up to date since its establishment and in the meantime a considerable improvements were made in the facility capability. This paper describes the outline, conducted tests and operation techniques which have been acquired through the operation of the test facility.

Development of B-Value Based GBAS Ground Facility Error Standard Deviation Model and Verification (B-Value를 이용한 GBAS 지상국 오차 표준편차 모델 개발 및 성능 평가)

  • Jun, Hyang-Sig;Ahn, Jong-Sun;Lee, Young-Jae;Choi, Young-Kiu;Sung, Sang-Kyung;Yeom, Chan-Hong
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.37 no.12
    • /
    • pp.1232-1237
    • /
    • 2009
  • The ICAO and FAA are developing and verifying of GBAS for civil aircraft landing and take-off. The guarantee of aircraft integrity issue is the important part of GBAS. To guarantee integrity, the GBAS ground facility broadcasts various informations to aircraft. The informations are related to the estimated accuracy of each pseudorange correction and the estimated error terms, for example B-value and standard deviation of the ground facility error. These parameters are used to calculate position error (estimated value of the user). If estimated position errors don't satisfy requirements, aircraft use alternate navigation means. In this paper, GBAS reference stations's real data, which operated by KARI (Korea Aerospace Research Institute) in Jeju international airport, are used to development of new ground facility error standard deviation model. We verify improvement of GBAS availability, with respected to vertical protection level, using B-value based a new ground facility error standard deviation model and a sigma inflation factor.

Development of Machine Learning Model to Predict the Ground Subsidence Risk Grade According to the Characteristics of Underground Facility (지하매설물 속성을 활용한 기계학습 기반 지반함몰 위험도 예측모델 개발)

  • Lee, Sungyeol;Kang, Jaemo;Kim, Jinyoung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.23 no.8
    • /
    • pp.5-10
    • /
    • 2022
  • Ground Subsidence has been continuously occurring in densely populated downtown. The main cause of ground subsidence is the damaged underground facility like sewer. Currently, ground subsidence is being dealt with by discovering cavities in ground using GPR. However, this consumes large amount of manpower and cost, so it is necessary to predict hazardous area for efficient operation of GPR. In this study, ◯◯city is divided into 500 m×500 m grids. Then, data set was constructed using the characteristics of the underground facility and ground subsidence in grids. Data set used to machine learning model for ground subsidence risk grade prediction. The purposed model would be used to present a ground subsidence risk map of target area.

A Study on Business Promotion Procedure and Service Model for Ubiquitous Sensor Network Based Ground Facility Management (USN 기반의 지상시설물 관리를 위한 추진절차 및 서비스 모델 연구)

  • Jeong, Jin-Seok;Kim, Eui-Myoung;Lee, Yong-Joo;Byun, In-Sun
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.26 no.4
    • /
    • pp.433-442
    • /
    • 2008
  • This research dealt with the methodological procedures of ubiquitous sensor networks, applying to urban ground facilities. Recently Korean government established a guide, "u-City IT Infra guide v1.0" when promoting u-City implement projects. This guide conceptually included general processes about u-City mainframe in overall, but its guidance could not lead the detailed procedures and methods for specific ground facility. Therefore, this research proposed the details of the procedure for the intelligence of facilities after reviewing the existing procedures for ubiquitous city. Newly proposed procedure for the intelligence of facilities was consisted of selection of facility and sensors for intelligence, setting a level for intelligence, and suggestion of service model for the selected facility.

A Study on Trouble and Arrangement of the Ground-Fault Protection for 2 Step Voltage Distribution System of Premises (2 Step 이상 운용 고객의 구내배전계통 지락보호시스템 구성 현황 및 문제점 검토)

  • Im, Jin-Sung;Shin, Myoung-Ho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.10
    • /
    • pp.73-77
    • /
    • 2010
  • Most accidents occurred in power receiving & transforming facility are ground fault. The quality of power supply is deteriorated since the ground fault is not detected promptly. This paper analyzes the problems about system-grounding type of 2 step power receiving & transforming facility, arrangement of protection relaying scheme and ground-fault protection system of ungrounded system. Then, this paper presents the arranging scheme of system-grounding type to improve power supply reliability.