• Title/Summary/Keyword: Flow management

Search Result 3,544, Processing Time 0.031 seconds

A Method to Calculate Charge for Reactive Power Service under Competition of Electric Power Utilities

  • Ro, Kyoung-Soo;Park, Sung-Chul
    • KIEE International Transactions on Power Engineering
    • /
    • v.11A no.4
    • /
    • pp.39-44
    • /
    • 2001
  • As electric power systems have been moving from vertically integrated utilities to a deregulated environment, the charging of reactive power management is a new challenging them for market operators. This paper proposes a new methodology to compute the costs of providing reactive power management service in a competitive electrical power market. The proposed formulation, which is basically different from those shown in the literature, consists of two parts. One is to recover investment capital costs of reactive power supporting equipment based on a reactive power flow tracing algorithm. The other is to recover operational costs based on variable spot prices using the optimal power flow algorithm. The charging shapes resulted from the proposed approach exhibit a quite good meaning viewed from a practical sense. It turns out that reactive power charged are mostly due to recovery of capital costs and slightly due to recovery of operational costs. The methods can be useful in providing additional insight into power system operation and can be used to determined tariffs of a reactive power management service.

  • PDF

A Part Release Method Considering Tool Scheduling in FMS (FMS에서 공구 일정계획을 고려한 부품투입 방법)

  • 이충수;최정상
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.28 no.1
    • /
    • pp.1-10
    • /
    • 2003
  • A recent trend In flexible manufacturing systems (FMS) Is to utilize the Identical versatile machines with fast tool delivery devices. Unlike a conventional FMS where parts are fed to the machines with the required tools, tools are acquired from other machines using a tool delivery system and parts can be finished on the same machine In these FMS. Therefore it Is more important problem 4o plan tool flow using tool delivery system In these FMS rather than part flow In conventional FMS. According to the existing study, In FMS 20∼30 percent of the total management cost Is the cost related with tools and It Is possible to reduce the tool Inventory by 40 percent using efficient tool allocation. In this study, In FMS under dynamic tool allocation strategy, a new method of part release considering tool flow at the stage of part release Is proposed. In order to prove the efficiency of the proposed part release It is compared with other part release through simulation experiments. Performance measures in these experiments are the throughput and the number of tardy parts.

A Study on Interaction Factors for Knowledge Transference of e-Learning (e-Learning의 원활한 지식전달을 위한 상호작용 환경에 관한 연구)

  • Kang, Inwon;Lee, Ji Won
    • Knowledge Management Research
    • /
    • v.10 no.1
    • /
    • pp.17-32
    • /
    • 2009
  • Cyber University has been continuously increased since it is of great necessity of education through lifelong study. Recently, the management of cyber universities does not ensure education success, because some problems are coming out. Now we are to take an interest in qualitative level of e-learning. The purpose of this study is to classify and investigate interaction factors of e-learning, which were one of the restrictions to develop e-learning, influence learning flow and satisfaction. The authors discuss the implications of the findings for interaction and learning flow theory and practice.

  • PDF

기상, 유출, 하수관로 유동 모형과 ArcView를 결합한 하수도 시설 관리 시스템의 개발 및 적용

  • 김준현;한영한;박형춘;한미덕
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 1999.12a
    • /
    • pp.26-29
    • /
    • 1999
  • An integrated sewer management system was developed for the analysis of sewer flow and for optimal operation of sewer works using ArcView and SWMM. SWMM and ArcView were dynamically linked together using Avenue in order to construct user-friendly management system. The developed system was applied to a residential area in Choonchun city to verify its utilities. All the relevant field data were analyzed on the basis of developed system, and the modeling of sewer flow was implemented using MET, RUNOFF, TRANSPORT in SWMM. As this system can provide comprehensive prediction of flow and pollution profiles, it could serve as a tool not only for optimal management, but also for decision support system to examine the efficiency of planning and implementation of sewer projects.

  • PDF

A Study on the Improvement Scheme of the Total Water Pollution Load Management Plan (수질오염총량관리 계획수립의 개선방안에 관한 연구)

  • Kim, Young-Il;Yi, Sang-Jin
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.6
    • /
    • pp.977-981
    • /
    • 2006
  • In order to improve water quality in drinking water sources, Ministry of Environment (MOE) was implemented total water pollution load management (TWPLM) in all the major river basins. From the experience of the application of TWPLM, we could find some problems relating the target watershed, standard operating procedure (SOP) of establishment and implementation plan, water quality and flow rate, design flow, water quality model, margin of safety (MOS), and estimation of wasteload were found. The authors were reviewed ongoing TWPLM and presented the improvement schemes for a successful TWPLM. For the application of these suggestions, further detailed studies should be done to implement TWPLM in the future.

Min-Max Regret Version of an m-Machine Ordered Flow Shop with Uncertain Processing Times

  • Park, Myoung-Ju;Choi, Byung-Cheon
    • Management Science and Financial Engineering
    • /
    • v.21 no.1
    • /
    • pp.1-9
    • /
    • 2015
  • We consider an m-machine flow shop scheduling problem to minimize the latest completion time, where processing times are uncertain. Processing time uncertainty is described through a finite set of processing time vectors. The objective is to minimize maximum deviation from optimality for all scenarios. Since this problem is known to be NP-hard, we consider it with an ordered property. We discuss optimality properties and develop a pseudo-polynomial time approach for the problem with a fixed number of machines and scenarios. Furthermore, we find two special structures for processing time uncertainty that keep the problem NP-hard, even for two machines and two scenarios. Finally, we investigate a special structure for uncertain processing times that makes the problem polynomially solvable.

A Study on the Validation Methodology of Network Analysis Applications in Energy Management Systems (계통운영시스템 계통해석 프로그램 검증 방안에 관한 연구)

  • Cho, Yoon-Sung
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.10
    • /
    • pp.27-36
    • /
    • 2014
  • Network analysis applications in energy management systems play a key role in the economic and reliable operation of power systems. In order to provide operators with useful network information, the accurate results of topology processing, state estimation, power flow, and contingency analysis must be simulated. This paper proposes a validation methodology of network analysis applications in energy management systems. The energy management systems was checked to ensure that it meets the originally specified functions based on the proposed methodology. In addition, the performance of state estimation is evaluated with the reference of the proposed methodology. The proposed methodology is being conducted by energy management systems and the Korean power systems have been utilized for the test systems.

Application of Personal Digital Assistant (PDA) for Mobile Bridge Management System (MBMS) (PDA를 이용한 무선교량유지관리(MBMS) Application 개발)

  • 이태식;이동욱;이성현
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.3
    • /
    • pp.223-231
    • /
    • 2004
  • The accumulated BMS data have made it easy to make reasonable decision-making for bride maintenance and repair work. In the developing period of BMS, the bridge management was not easy due to the lack of understanding of BMS and low credibility of the data. In recent years, it has been possible to enhance the credibility of the data and to expand the application scopes of BMS with the efforts of Local Road Construction Offices. The reasonable decision making for bridge management can improve the performance of bridges under the practical constraints such as limited budget. It can then result in the reduction of bridge maintenance budget. This study provides the methodology for the application of mobile internet-based KOBMS for bridge management. The data flow for BMS is the most important factor for decision-making on budget allocation, and this study establishes the basic scheme of the data flow for BMS. The implementation of PDA for BMS may suggest a new paradigm of 'Mobile' in the field of construction management.

A Study on the Improving Life-up and Procurement Work Flow for Effectiveness of Resources increase in the Building Construction (건설공사의 자원 효용성 증대를 위한 조달 및 양중 작업흐름 개선에 관한 연구)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.442-445
    • /
    • 2003
  • The purpose of this study is to present an improved lift-up & procurement work flow for effectiveness of resources increase in building construction. The current lift-up & procurement work flow has some waste factors; complicated information system, connection lack with process and decision-making delay. Therefore the study applied the value stream mapping methodology for improvement of current lift-up & procurement work flow. The main contents of the study are as follows; 1) A problem of current work flow were analyzed through current state mapping(CSM). 2) An improved work flow was suggested through future state mapping(FSM). 3) An improvement effect analysis of information system and lift-up planning The study recommends that continuous improvement of lift-up & procurement work flow and efficient management of information in building construction.

  • PDF

A Study on Effect Analysis of Integrated Demand Management According to Energy System Management Model (Energy System Management 모형을 통한 통합 수요관리 효과분석에 관한 연구)

  • Kim, Yong-Ha;Jo, Hyeon-Mi;Kim, Young-Gil;Park, Hwa-Yong;Kim, Hyeong-Jung;Woo, Sung-Min
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.7
    • /
    • pp.1339-1346
    • /
    • 2011
  • This paper is developed to demand management scenario of energy consumption efficiency improvement, electricity generation efficiency improvement, network efficiency improvement, change of distribution ratio, movement of energy source, change of heating system, put of CHP to quantitatively assess to impact on energy use of demand management at the national level. This scenario can be applied Energy System Management model was developed based on Energy Balance Flow. In addition, effect analysis through built demand management scenario was quantitatively evaluated integrated demand management effectiveness of energy cost saving, CO2 emission reduction and energy savings of national level by calculating to primary energy source usage change in terms of integration demand management effect more often than not a single energy source separated electricity, heat and gas.