• Title/Summary/Keyword: Finishing works

Search Result 93, Processing Time 0.031 seconds

Study on the Defects of Finishing Works of Apartment Houses during Warranty Liability Period and its Correlation (공동주택 마감공사의 하자보수기간 현황 및 연관성 연구)

  • Lee, Ung-Kyun;Seo, Deok-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.4
    • /
    • pp.385-391
    • /
    • 2017
  • The warranty liability period for defects in apartment buildings by work type is not based on scientific analysis, making the appropriateness of the term a culprit behind the lawsuits. Therefore, this research aims to evaluate the appropriateness of the warranty liability term of apartment buildings by identifying the current status of defects, in particular, caused by finishing works. That is because the number of defects, caused during the finishing works, accounted for the largest portion of the total defect cases of apartment buildings reported to the Apartment Defect Dispute Mediation Committee under the Ministry of Land, Infrastructure, and Transport of Korea between 2010 and 2011. The result from analyzing claims for defect repairs of the finishing works showed that most cases by work type continued to be made after two years, and only about 60% were charged within the warranty period. And, defects by work type have correlation, which needs to be considered for a better construction technique. Considering a low correlation between the possibility of defects and the construction performance rankings, which are highly relevant to the apartment preference. It is believed that there needs to be a qualification process for agencies that actually performs finishing works.

Priority on Work Improvement for Automation of Ceiling Finishing Work (천장마감공사 자동화기술 적용을 위한 작업개선 우선순위 도출)

  • Lee, June-Hyuck;Lee, Dongyoun;Kang, Goune;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.187-188
    • /
    • 2015
  • The construction finishing work is emphasized according to high dependence on labor and long term that occupy approximately 40% in construction period, so that it is required for the alternatives such as automation technology. However, it is insufficient to develop the automation technology of construction finishing work compared to other works, for instance, frame work. Also it is not enough about this preliminary research which survey the improvement needs to select the development object. Therefore, this study aimed at derivation of detail works required improvement in ceiling finishing work by the questionnaire survey. These results may provide the basic information to develop the automation technology of construction finishing work.

  • PDF

A Study on the Analysis of Planning and Management Factors of Finishing Works Using an Analytic Hierarchy Process (계층분석법(AHP)을 이용한 마감공정의 계획 및 관리요인 분석에 관한 연구 - 초고층 주거건축물 공사 건식벽체공법을 대상으로)

  • Lee, Chi-Joo;Kim, Jae-Joon;Lee, Yoon-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.132-140
    • /
    • 2007
  • There is an increase in interest and investment in high-rise housing as it is perceived to be a new value-added market in the construction industry. In constructing a high-rise housing, the finishing works are executed in accompaniment with many other activities that are progressed repeatedly and spontaneously on each floor. It was reported that the duration of finishing works differs according to the management ability of the executing company and has a significant effect on the entire project duration. We suggest a need to concentrate on important management factors by analyzing the factors affecting the productivity of finishing works based on the site characteristics in high-rise housing. There are various complex productivity-affecting factors including the technical factors involved in planning and managing the processes of finishing works. From the viewpoint of planning and management factors, the importance of productivity-affecting factors was analyzed using the Analytic Hierarchy Process (AHP). A continuous examination of the management of high-importance factors will make it possible to improve productivity by enhancing the understanding of productivity-affecting factors of finishing works and suggesting a practical management direction.

Basic Research on Evaluation of Defect Repair Period of Finishing Works in Apartment Houses according to Performance Data (실적자료에 의한 공동주택 마감공사의 하자보수기간의 적절성 평가 기초연구)

  • Kim, Dae-gil;Lee, Ung-Kyun;Seo, Deok-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.245-246
    • /
    • 2015
  • Cases of lawsuit and conflict are increasing because of defects in apartments in use after the completion of construction. Further, with changes in the consciousness of residents and in the social environment, many residents are showing interest in defect-related lawsuits. However, the term of warranty liability defined in the current law is not practically appropriate, and the verification of the determination of the term of warranty liability is insufficient. Against this background, this research aims to evaluate the appropriateness of defect repair periods by examining the actual defect condition of the finishing work among the various defects related to apartments. Collected performance data are analyzed by statistical techniques by considering the defect occurrence rate per construction type and the construction year of the finishing work in apartment construction. The analysis results will be used as basic data for evaluating the appropriateness of the standards for the term finishing works warranty liability.

  • PDF

An Examination of a Risk Assessment Method and Analysis of Defect Types of Apartment Finishing Works (공동주택 마감공사의 하자유형별 분석 및 위험성 평가 방법에 관한 연구)

  • Son, Seunghyun;Lee, Jae-hyeon;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.2
    • /
    • pp.249-260
    • /
    • 2024
  • In recent years, the proportion of medium and small-sized apartments within the housing market has seen a noticeable increase, alongside a corresponding rise in disputes related to construction defects. Such disputes are most prevalent in the finishing works phase of construction, which not only are frequent in occurrence but also impose significant repair costs. Furthermore, there is a noticeable scarcity of research focused on the quality management of finishing work defects prior to the completion of construction. Addressing this issue necessitates a methodology capable of preemptively identifying defects by analyzing their frequency and associated costs across various defect types. Consequently, the aim of this study is to propose a risk assessment methodology by conducting an analysis of defect cases across 3,299 apartment units, considering aspects such as frequency and severity. The outcomes of this research endeavor are expected to offer practical management strategies to enhance the quality of apartment finishing works and serve as an academic foundation for the enhancement of construction management systems pertaining to apartment finishing works.

Process Planning for Finishing Works of High-rise Residential Buildings Project (고층 공동주택 마감공사의 공정계획 프로세스)

  • Baek, Tae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.110-117
    • /
    • 2017
  • In the construction of high-rise residential buildings in which the finishing works are done repetitively in each housing unit, the construction period and cost can be reduced, while maintaining the quality, if the work process is properly managed in order for the resources to be input continuously. Time management methods such as the Bar Chart, CPM and LOB are not appropriate, due to the difficulties involved in the diagraming of repetitive works and applying them to the project. The Tact method also has difficulties in maintaining a constant work flow and needs significant effort and cooperation from the subcontractors to allocate the resources consistently. Partitioning, base works for finishing, floor mortar plastering and the final finishing work are done sequentially in residential buildings projects, and there are many repetitive activities which differ in terms of the work method, work area and productivity. If these repetitive activities are synchronized or converged toward the last work area, the goal of process management can be achieved effectively. Therefore, a process planning method for the finishing works of residential building projects is proposed, which takes into consideration elements, such as the sequential relation between the activities in each housing unit and classification of repetitive works in terms of their management method, work area and production rate, for the continuous input of resources into the housing units.

A Verification of the Accuracy in BIM-Based Quantity Taking-Off - Focusing on Finishing Work (BIM 기반 물량 산출의 정확성 검증 - 마감공사 공종을 중심으로)

  • Kim, Ji-Hyun;Yoon, Su-Won
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.1-9
    • /
    • 2013
  • Currently, various studies and applications related BIM based quantity take-off have been attempted, because of the accuracy of cost estimating and reliability by using the BIM model information in automatical calculation. Finishing works that have a large number of various types and materials need the higher accuracy and reliability on the BIM-based quantity take-off. Therefore, this study compared and analyzed 2D and 3D based quantity through Test-bed and determine the cause of the quantity difference. This verified the accuracy and efficiency in the BIM-based quantity take-off for finishing works. Also this study has been proposed opinions for calculating the exact BIM-based quantity take-off.

Simulation Modeling for Productivity Analysis of Concurrent Construction Method of External Insulation Finishing System in Apartment (공동주택용 외단열 적층시공 공법의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kim, Min Ju;Kim, Taehoon;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.68-69
    • /
    • 2015
  • Traditional External Insulation Finishing System(EIFS) is applied to apartment construction by performing structural framework and insulation finishing work sequentially. Separate execution of the three works increases construction cost and duration. Concurrent construction method of EIFS, which performs framework and insulation finishing work simultaneously, is introduced in order to solve these problems. However, the introduced method is exposed to the risk of construction delay caused by bottlenecks due to interacting processes and resources. Therefore, this paper presents a simulation model suitable for estimating work productivity of the concurrent construction by considering predecessor and successor processes to optimize resource allocation and minimize construction delay.

  • PDF

A Study on the Design for the Air Impeller of a Finishing Tool Unit (피니싱 툴 유니트의 에어 임펠러 설계에 관한 연구)

  • Choi, Hyun-Jin;Kang, Ik-Soo;Lee, Seung-Yong;Jang, Eun-Sil;Park, Sun-Myung;Choi, Seong-Dae
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.3
    • /
    • pp.312-319
    • /
    • 2015
  • The grinding and furbishing process as the finishing process for molds include the works such as the grinding, buffing, lapping and polishing among others. A finishing tool unit is applied to this finishing process for the burr, lapping, polishing and others of molds. A finishing tool unit can carry out the flexible machining, depending on the machining allowance for objects to be cut on the basis of the instrumental driving mechanism which enables the up, down, left and right floating, which is applied in link with the dedicated cutters and robot machining systems. This study selected the shape to increase the rotatory force of an impeller when air is discharged during the driving of a finishing tool unit, and reflected it to the impeller designing. In addition, the study analyzed each flow velocity and pressure distribution per air pressurization value and finally analyzed the rotating torque to suggest the optimal conditions in designing impellers.

Integrating a Machine Learning-based Space Classification Model with an Automated Interior Finishing System in BIM Models

  • Ha, Daemok;Yu, Youngsu;Choi, Jiwon;Kim, Sihyun;Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.4
    • /
    • pp.60-73
    • /
    • 2023
  • The need for adopting automation technologies to improve inefficiencies in interior finishing modeling work is increasing during the Building Information Modeling (BIM) design stage. As a result, the use of visual programming languages (VPL) for practical applications is growing. However, undefined or incorrect space designations in BIM models can hinder the development of automated finishing modeling processes, resulting in erroneous corrections and rework. To address this challenge, this study first developed a rule-based automated interior finishing detailing module for floors, walls, and ceilings. In addition, an automated space integrity checking module with 86.69% ACC using the Multi-Layer Perceptron (MLP) model was developed. These modules were integrated into a design automation module for interior finishing, which was then verified for practical utility. The results showed that the automation module reduced the time required for modeling and integrity checking by 97.6% compared to manual work, confirming its utility in assisting BIM model development for interior finishing works.