References
- Hwang, Y-S (2004), "Automatic Quantity Takeoff from Drawing Through IFC Model", Journal of The Architectural Institute of Korea, Vol. 20, No. 12, pp. 89-97.
- Joo, S-I, Jun, H-J (2009), "A Study on the BIM-basd Material Take Off That is Usable as 4D Simulation", Proc. of Conference in Architectural Institute of Korea, Architectural Institute of Korea, Vol. 29, No. 1, pp. 335-338.
- Jun, K-H, Yun, S-H (2011), "The case study of BIM-based quantity take-off for concrete and form work ", Journal of KIBIM, Vol. 1, No. 1, pp. 13-17.
- Kim, B-M, Jeon, H-J, Jang, S-J, Yun, S-H, Paek, J-H (2008), "A Study on the Improving Effectiveness of Quantity Estimation with BIM", Proc. of Conference in Architectural Institute of Korea, Architectural Institute of Korea, Vol. 28, No. 1, pp. 705-708.
- Kim, C-S (2011), "A Study on the Modeling Method for Material Take-off BIM based Framework", Master Thesis, Gyeongsang National University.
- Kim, S-A, Yoon, S-W, Chin, S, Kim, T-Y (2009), "A Development of Automated Modeling System for Apartment Interior to Improve Productivity of BIM-based Quantity Take-Off", Journal of The Architectural Institute of Korea, Vol. 25, No. 9, pp. 133-143.
- Kwo, O-B, Son, J-H, Lee, S (2010), "Study on the Application of 3D-based BIM for School Facilities to Increase Cost Management Efficiency", Journal of the Korea Institute of Building construction, Vol. 10, No. 6, pp. 49-60. https://doi.org/10.5345/JKIC.2010.12.6.049
- Kwon, O-C, Jo, C-W, Cho, J (2011), "Introduction of BIM Quality Standard for Quantity Take-off", Journal of the Korea Institute of Building construction, Vol. 11, No. 2, pp. 171-180. https://doi.org/10.5345/JKIC.2011.04.2.171
- Lee, C-H, Kim, S-A, Chin, S (2011), "An Index for Measuring the Degree of Completeness of BIM-based Quantity Take-Off ", Korea Journal of Construction Engineering and Management, Vol. 12, No. 6, pp. 79-92. https://doi.org/10.6106/KJCEM.2011.12.6.79
- Lee, J-C (2004), "Developing an Automated Module for Scheduling and Quantity Estimation Based on 3D CAD Model Information towards Effective Use of 4D CAD Model", Journal of The Architectural Institute of Korea, Vol. 20, No. 2, pp. 15-22.
- Lee, J-J, Shin, T-H, Kim, S-A, Kang, M-K, Chin, S (2008), "A System Development of Quantity Data Type Analysis for BIM based Automation of Estimation Framework", Proc. of KICEM Annual Conference 2008, Korea Institute of Construction Engineering and Management, pp. 744-747.
- Lee, M-K, Chin, S (2013), "A Study on the Accuracy of BIM-based Quantity Take-Off of Apartment Interior ", Korea Journal of Construction Engineering and Management, Vol. 14, No. 1, pp. 12-22.
- Lee, S-W (2009), "BIM Components Analysis and Adaptation Plan by Application Phase for Design Process Efficiency", Master Thesis, Chung-Ang University.
- Olatunji, A. O. Sher D. W (2010), 'Handbook of Research on Building Information Modeling and Construction Informatics: Concepts and Technologies-Chapter 8. A Comparative Analysis of 2D computer-aided Estimating (CAE) and BIM Estimating Procedures', Information Science Reference (IGI Global), pp. 170-189.
- Park, Y-J, Won, S-K, Han, C-H, Lee, J-B (2011), "A Study on 3D BIM Collaborative Approximate Estimating Model of Structural Work for Apartment Projects", Journal of The Architectural Institute of Korea, Vol. 27, No. 6, pp. 123-130.
- Shen, Z, Issa, R. R (2010), "Quantitative evaluation of the BIM-assiested Construction detailed cost estimates", ITcon Vol. 15, pp. 234-257.
- Yoo, M-K (2008), "A Study on Improving Estimating Practices of Building Projects Using BIM", Master Thesis, Chung-Ang University.
Cited by
- BIM기반 철근콘크리트구조의 물량산출 비교 vol.33, pp.1, 2013, https://doi.org/10.7734/coseik.2020.33.1.35