• Title/Summary/Keyword: Failure Repair

Search Result 776, Processing Time 0.03 seconds

Optimal System Burn-in for Maximizing Reliability of Non-series Systems (비 직렬 시스템의 신뢰도 최적화를 위한 시스템 번인)

  • Kim, Kyungmee O.
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.33 no.2
    • /
    • pp.273-281
    • /
    • 2007
  • The decision of how long performing system burn-in must be answered with a probabilistic model of a system lifetime at which infant mortality failures created during assembly processes are quantified. In this paper, we propose such a model which is modified from previous results. Using the system model, we derived system reliability in terms of component and system burn-in times for the two cases of minimal repair at system failure and of component replacement and connection repair at their failure times. The procedure is illustrated with a bridge system and the optimal system burn-in times are obtained for maximizing system reliability. The result suggests that an assumption of minimal repair at system failure may underestimate the optimal burn-in time in practice.

On Multipurpose Replacement Policies for the General Failure Model

  • Cha, Ji-Hwan
    • Journal of the Korean Data and Information Science Society
    • /
    • v.14 no.2
    • /
    • pp.393-403
    • /
    • 2003
  • In this paper, various replacement policies for the general failure model are considered. There are two types of failure in the general failure model. One is Type I failure (minor failure) which can be removed by a minimal repair and the other is Type II failure (catastrophic failure) which can be removed only by a complete repair. In this model, when the unit fails at its age t, Type I failure occurs with probability 1-p(t) and Type II failure occurs with probability p(t), $0{\leq}p(t){\leq}1$. Under the model, optimal replacement policies for the long-run average cost rate and the limiting efficiency are considered. Also taking the cost and the efficiency into consideration at the same time, the properties of the optimal policies under the Cost-Priority-Criterion and the Efficiency-Priority-Criterion are obtained.

  • PDF

Cost analysis for minimal repair model in stepdown warranty policy (단계별 보증제도에서 응급수리 모형에 관한 보증비용 분석)

  • 김재중;김원중
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.16 no.27
    • /
    • pp.21-25
    • /
    • 1993
  • This article is concerned with cost analysis in stepdown warranty policy. The repair of item is divided into two policies. First, perfect repair can be considered that the failurerate is the same as new item. Second, minimal repair is shown that the failurerate is the same as just before the item failure In this paper, the minimal repair model is introduced. And it is assumed that manufacturers repair the item failure within the warranty periodn. But warranty period is not renewed at all. At this point the warranty cost is analyzed in manufacturer's and customer's point of view.

  • PDF

Post-Damage Repair of Prestressed Concrete Girders

  • Ramseyer, Chris;Kang, Thomas H.K.
    • International Journal of Concrete Structures and Materials
    • /
    • v.6 no.3
    • /
    • pp.199-207
    • /
    • 2012
  • Concrete is an economical construction material and for that reason it is widely used in buildings and infrastructures. The use of deicing salts, expansion joint failure, and freeze-thaw cycles have led to concrete bridge girders experiencing corrosion of steel reinforcement and becoming unsafe for driving. The goal of this research is to assess the effectiveness of current and possible repair techniques for the end region of damaged prestressed concrete girders. To do this, three American Association of State Highway and Transportation prestressed concrete girders were tested to failure, repaired, and retested. Three different repair materials were tested including carbon fiber, glass fiber, and surface mounted rods. Each different repair material was also tested with and without injected epoxy. Comparisons were then made to determine if injecting epoxy had a positive effect on stiffness and strength recovery as well as which repair type regained the largest percentage of original strength.

Extended warranty model under minimal repair-replacement warranty policy

  • Jung, Ki Mun
    • International Journal of Reliability and Applications
    • /
    • v.18 no.1
    • /
    • pp.1-8
    • /
    • 2017
  • In this paper, we study an extended warranty model under minimal repair-replacement warranty (MRRW) which is suggested by Park, Jung and Park (2013). Under MRRW policy, the manufacturer is responsible for providing the minimal repair-replacement services upon the system failures during the warranty period. And if the failure occurs during the extended warranty period, only the minimal repair is conducted. Following the expiration of extended warranty, the user is solely responsible for maintaining the system for a fixed length of time period and replaces the system at the end of such a maintenance period. During the maintenance period, only the minimally repair is given for each system failure. The main purpose of this article is to suggest the extended warranty and replacement model with MRRW. Given the cost structures incurred during the life cycle of the system, we formulate the expected cost and the expected length of life cycle to obtain the expected cost rate.

  • PDF

Optimal Preventive Replacement Policies for a Change of Operational Environment (사용환경의 변화에 대한 최적예방교환정책)

  • Kong, M.B.
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.21 no.4
    • /
    • pp.507-517
    • /
    • 1995
  • The failure rate of an item depends on operational environment. When an item has a chance failure period and a wearout failure period in sequel, the severity of operational environment causes the increase in the slop of wearout failure rate or the increase in the magnitude of chance failure rate. For such a change of operational environment, this paper concerns the change of optimal preventive replacement time. Two preventive replacement policies, age replacement policy and periodic replacement policy with minimal repair, are considered. Investigated properties are: (a) in age replacement policy, optimal preventive replacement time increases as the chance failure rate increases and optimal preventive replacement time decreases as the slope of wearout failure rate increases, and (b) in periodic replacement policy with minimal repair, optimal preventive replacement time increases as the slope of wearout failure rate increases; however, the change of chance failure rate does not alter the optimal preventive replacement time.

  • PDF

HTSC and FH HTSC: XOR-based Codes to Reduce Access Latency in Distributed Storage Systems

  • Shuai, Qiqi;Li, Victor O.K.
    • Journal of Communications and Networks
    • /
    • v.17 no.6
    • /
    • pp.582-591
    • /
    • 2015
  • A massive distributed storage system is the foundation for big data operations. Access latency performance is a key metric in distributed storage systems since it greatly impacts user experience while existing codes mainly focus on improving performance such as storage overhead and repair cost. By generating parity nodes from parity nodes, in this paper we design new XOR-based erasure codes hierarchical tree structure code (HTSC) and high failure tolerant HTSC (FH HTSC) to reduce access latency in distributed storage systems. By comparing with other popular and representative codes, we show that, under the same repair cost, HTSC and FH HTSC codes can reduce access latency while maintaining favorable performance in other metrics. In particular, under the same repair cost, FH HTSC can achieve lower access latency, higher or equal failure tolerance and lower computation cost compared with the representative codes while enjoying similar storage overhead. Accordingly, FH HTSC is a superior choice for applications requiring low access latency and outstanding failure tolerance capability at the same time.

Studies on Repair of Reinforced Concrete Structures(II) - Their Influence on Flexural Performance - (철근콘크리트 구조물의 보수 공법연구(II) - 휨 거동 비교 -)

  • 김병국;신영수;홍기섭;이차돈;최완철
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1995.04a
    • /
    • pp.219-224
    • /
    • 1995
  • A series of 15 reinforced concrete beams was tested to explore the effects of polymer repair on damaged beams. The key parameters for this study were the repair materials, repair methods, repair depths and repair locations. The repaired specimens failed by a typical flexural mode, showing minor interface failure. The results show that epoxy, polyester resins and latex modified cementitous mortars are effective for repairing the concrete beams. The results also show that the depth and the location of the repair do not change significantly the flexural preformance of the repaired beams.

  • PDF

Two Forms of Preventive Replacement Policy with Minimal Repair at Failure (수리사용 후 교환(交換)정책의 두 형태)

  • Park, Gyeong-Su;Gang, Ho-Seon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.4 no.1
    • /
    • pp.1-3
    • /
    • 1978
  • This paper presents a model for determining the optimal number of minimal repairs before replacement. The basic concept parallels the periodic replacement model with minimal repair at failure introduced by Barlow and Hunter, only difference being the replacement signalled by the number of previous minimal repairs performed on the unit. In the case of Weibull distribution, which is widely used as a general failure distribution, the optimal solution could be obtained numerically and seems more cost effective compared to the Barlow and Hunter's Policy II.

  • PDF

Warranty Analysis Based on Different Lengths of Warranty Periods

  • Park, Min-Jae
    • Communications for Statistical Applications and Methods
    • /
    • v.18 no.3
    • /
    • pp.277-286
    • /
    • 2011
  • Global companies can sell their products with dierent warranty periods based on location and times. Customers can select the length of warranty on their own if they pay an additional fee. In this paper, we consider the warranty period and the repair time limit as random variables. A two-dimensional warranty policy is considered with repair times and failure times. The repair times are considered within the repair time limit and the failure times are considered within the warranty period. Under the non-renewable warranty policy, we obtain the expected number of warranty services and their variances in the censored area by warranty period and repair time limit to conduct a warranty cost analysis. Numerical examples are discussed to demonstrate the applicability of the methodologies and results using field data based on the proposed approach in the paper.