• Title/Summary/Keyword: Estimation Unit

Search Result 1,133, Processing Time 0.027 seconds

Economic performance of cable supported bridges

  • Sun, Bin;Zhang, Liwen;Qin, Yidong;Xiao, Rucheng
    • Structural Engineering and Mechanics
    • /
    • v.59 no.4
    • /
    • pp.621-652
    • /
    • 2016
  • A new cable-supported bridge model consisting of suspension parts, self-anchored cable-stayed parts and earth-anchored cable-stayed parts is presented. The new bridge model can be used for suspension bridges, cable-stayed bridges, cable-stayed suspension bridges, and partially earth-anchored cable-stayed bridges by varying parameters. Based on the assumption that each structural member is in either an axial compressive or tensile state, and the stress in each member is equal to the allowable stress of the material, the material quantity for each component is calculated. By introducing the unit cost of each type of material, the estimation formula for the cost of the new bridge model is developed. Numerical examples show that the results from the estimation formula agree well with that from the real projects. The span limit of cable supported bridge depends on the span-to-height ratio and the density-to-strength ratio of cables. Finally, a parametric study is illustrated aiming at the relations between three key geometrical parameters and the cost of the bridge model. The optimization of the new bridge model indicates that the self-anchored cable-stayed part is always the dominant part with the consideration of either the lowest total cost or the lowest unit cost. It is advisable to combine all three mentioned structural parts in super long span cable supported bridges to achieve the most excellent economic performance.

Enhancement of H.264/AVC Encoding Speed and Reduction of CPU Load through Parallel Programming Based on CUDA (CUDA 기반의 병렬 프로그래밍을 통한 H.264/AVC 부호화 속도 향상 및 CPU 부하 경감)

  • Jang, Eun-Been;Ha, Yun-Su
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.34 no.6
    • /
    • pp.858-863
    • /
    • 2010
  • In order to enhance encoding speed in dynamic image encoding using H.264/AVC, reducing the time for motion estimation which takes a large portion of the processing time is very important. An approach using graphics processing unit(GPU) as a coprocessor to assist the central processing unit(CPU) in computing massive data, will be a way to reduce the processing time. In this paper, we present an efficient block-level parallel algorithm for the motion estimation(ME) on a computer unified device architecture(CUDA) platform developed in general-purpose computation on GPU. Experiments are carried out to verify the effectiveness of the proposed algorithm.

Maritime radar display unit based on PC for safe ship navigation

  • Bae, Jin-Ho;Lee, Chong-Hyun;Hwang, Chang-Ku
    • International Journal of Ocean System Engineering
    • /
    • v.1 no.1
    • /
    • pp.52-59
    • /
    • 2011
  • A prototype radar display unit was implemented using inexpensive off-the-shelf components, including a nonlinear estimation algorithm for the target tracking in a clutter environment. Two custom designed boards; an analog signal processing board and a DSP board, can be plugged into an expansion slot of a personal computer (PC) to form a maritime radar display unit. Our system provided all the functionality specified in the International Maritime Organization (IMO) resolution A422(XI). The analog signal processing board was used for A/D conversion as well as rain and sea clutter suppression. The main functions of the DSP board were scan conversion and video overlay operations. A host PC was used to run the tracking algorithm of targets in clutter, using the discrete-time Bayes optimal (nonlinear, and non-Gaussian) estimation method, and the graphic user interface (GUI) software for Automatic Radar Plotting Aid (ARPA). The proposed tracking method recursively found the entire probability density function of the target position and velocity by converting into linear convolution operations.

Notes on the Comparative Study of the Reliability Estimation for Standby System with Exponential Lifetime Distribution

  • Kim, Hee-Jae
    • Journal of the Korean Data and Information Science Society
    • /
    • v.14 no.4
    • /
    • pp.1055-1065
    • /
    • 2003
  • We shall propose maximum likelihood, Bayesian and generalized maximum likelihood estimation for the reliability of the two-unit hot standby system with exponential lifetime distribution that switch is perfect. Each estimation will be compared numerically in terms of various mission times, parameter values and asymptotic relative efficiency through Monte Carlo simulation.

  • PDF

Notes on the Comparative Study of the Reliability Estimation for Standby System with Rayleigh Lifetime Distribution

  • Kim, Hee-Jae
    • Journal of the Korean Data and Information Science Society
    • /
    • v.15 no.1
    • /
    • pp.239-250
    • /
    • 2004
  • We shall propose maximum likelihood, Bayesian and generalized maximum likelihood estimation for the reliability of the two-unit hot standby system with Rayleigh lifetime distribution that switch is perfect. Each estimation will be compared numerically in terms of various mission times, parameter values and asymptotic relative efficiency through Monte Carlo simulation.

  • PDF

A Study on Digital Fault Locator for Transmission Line (송전선로용 디지털 고장점 표정장치에 관한 연구)

  • Lee, Kyung-Min;Park, Chul-Won
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.64 no.4
    • /
    • pp.291-296
    • /
    • 2015
  • Transmission line is exposed to a large area, and then faults are likely to occur than the other component of power system. When a fault occurs on a transmission line, fault locator helps fast recovery of power supply on power system. This paper deals with the design of a digital fault locator for improvement accuracy of the fault distance estimation and a fault occurrence position for transmission line. The algorithm of a fault locator uses a DC offset removal filter and DFT filter. The algorithm utilizes a fault data of GPS time synchronized. The computed fault information is transmitted to the other side substation through communication. The digital fault locator includes MPU module, ADPU module, SIU module, and a power module. The MMI firmware and software of the fault locator was implemented.

Congestion Management with Arrival Estimation of Unit Loads in an Automated Material Handling System (운송시간의 예측을 통한 물류정체 통제 모형)

  • Chung, Jae-Woo;Hur, Yeon-Ho
    • Korean Management Science Review
    • /
    • v.29 no.1
    • /
    • pp.131-141
    • /
    • 2012
  • The automated material handling systems today are playing ever more important roles in semiconductor/LCD fabrication facilities. Recently they became more flexible, intelligent, and speedy than in the past. The facilities have been fully automated because the size and weight of the unit loads used in the facilities were being increased beyond the limits that a human operator can handle. This research develops an efficient procedure to streamline the delivery of unit loads by the automated material handling system (AMHS). For this task, the research employs the event scheduling theory that has been successfully used in the both academia and industry. The developed procedure was applied to an actual LCD fabrication facility and improved the performance of an existing material handling system.

Estimation of Pollutants Loads using Unit Load Method in Hong-Bo Watershed (원단위법을 이용한 홍보유역의 오염부하량 산정)

  • Kim, Sun-Joo;Lee, Suk-Ho;Heo, Bae-Young
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2001.10a
    • /
    • pp.492-496
    • /
    • 2001
  • The purpose of this study is to estimation of pollutants loads using unit load method in Hong-bo watershed. In general, because river water quality management have been conducted with point source pollutant in our country, pollutants caused by precipitation have not been managed well so far. Especially the pollutants tends to concentrate in the reservoir of reclaimed land. Therefore, the reservoir of reclaimed land is need to continuous monitoring and update of an accurate data. also, It is need to improvement of environmental pollution. There are divide into nine sub-catchments and made an estimate of pollutants loads using unit load method in Hong-bo basin. The sample of data was during the 10 years.

  • PDF

A New Low Power High Level Synthesis for DSP (DSP를 위한 새로운 저전력 상위 레벨 합성)

  • 한태희;김영숙;인치호;김희석
    • Proceedings of the IEEK Conference
    • /
    • 2002.06b
    • /
    • pp.101-104
    • /
    • 2002
  • This paper propose that is algorithm of power dissipation reduction in the high level synthesis design for DSP(Digital Signal Processor), as the portable terminal system recently demand high power dissipation. This paper obtain effect of power dissipation reduction and switching activity that increase correlation of operands as input data of function unit. The algorithm search loop or repeatedly data to the input operands of function unit. That can be reduce the power dissipation using the new low power high level synthesis algorithm. In this Paper, scheduling operation search same nodes from input DFG(Data Flow Graph) with correlation coefficient of first input node and among nodes. Function units consist a multiplier, an adder and a register. The power estimation method is added switching activity for each bits of nodes. The power estimation have good efficient using proposed algorithm. This paper result obtain more Power reduction of fifty percents after using a new low power algorithm in a function unit as multiplier.

  • PDF

A Study on the Revision of Construction Standard Unit Price for Concrete Pavement Works (콘크리트포장 시공실태 조사에 따른 표준시장단가 개정 연구)

  • Lee, Ju-hyun;Baek, Seung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.196-197
    • /
    • 2022
  • This study aims to come up with the revision of construction standard unit price for concrete pavement works to improve its applicability and availability by a construction site survey. Construction site survey was conducted from March to November 2021 with 36 construction sites. This results of the revision are expected to support to public construction project owner or estimator in construction cost estimation works.

  • PDF