• Title/Summary/Keyword: Establishment of Project Planning

Search Result 122, Processing Time 0.025 seconds

Characteristics of Public Facilities Regenerated from Unpleasant Facilities in Western Part of Seoul - Focusing on the Relationship Between Historical Context and Local Context - (서울 서부의 기피시설에서 재탄생된 공공시설들의 특성 - 시대 및 장소적 맥락의 관계를 중심으로 -)

  • Eom, Jun-Sik;An, Dai-Whan
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.11
    • /
    • pp.57-65
    • /
    • 2018
  • The aim of this study is to understand the direction of planning for regeneration based on six representative cases of western part of Seoul that were regenerated from the unpleasant facilities since the 20th century. In particular, the similarities and differences were derived by analyzing the characteristics of the history and the location in terms of the 1st establishment and the regeneration in each cases. As a result, looking the tendency to regenerate the unpleasant facility, it can be seen that there is a correlation between the historical and the locational context when establishing and regenerating. Considering the distinct characteristic of the Location and the history of establishment & regeneration, we could classify the characteristics of public facilities as extroverted tendency and intrinsic tendency analysed by a geographic and an architectural, a programmatic aspects. Therefore, when planning the project regenerated from unpleasant facilities, it should be set considering the locational context and the historical context of establishment & regeneration.

Effect of the Orchard Scale Improvement Project on Farm Profitability - Focusing on Apple - (과원 규모화 사업이 농가 수익성에 미치는 영향 - 사과를 중심으로 -)

  • Kim, Se-Hyuk;Lim, Cheong-Ryong;Kim, Tae-Kyun
    • Journal of Korean Society of Rural Planning
    • /
    • v.30 no.1
    • /
    • pp.99-106
    • /
    • 2024
  • The purpose of this study is to analyze how the orchard scale improvement project affects the profits of apple farmers. For this purpose, the variable profit function of Apple was estimated using seemingly unrelated regression analysis. For the analysis, raw data from the Rural Development Administration's Agricultural Income Survey from 2015 to 2021 were used. Of the 1,009 apple farms, 95 farms participated in the orchard scale improvement project and 914 farms did not participate. The results show that the profits of farms participating in the project were found to be higher than those of non-participating farms, and as the cultivation area increased, profits tended to increase and then decrease. The results also indicated that below a certain size (19,462m2), the profits from project participation appear to be lower. The results of this study can provide useful information to the establishment of government policies and apple farmers who want to participate in the orchard scale improvement project.

A Study on The Operational Activation of the Facilities in the Rural Development Project - A Focus on the IPA on The Project Selection Factor and The Operation of a Business - (농촌지역개발사업 조성 시설물의 운영 활성화 방안 연구 - 사업선정요소에 대한 IPA분석 및 사업운영을 중심으로 -)

  • Kim, Hae-Young;Na, seung-hwa;Shin, Yong-Gyu;Cho, Joong-Hyun
    • Journal of Korean Society of Rural Planning
    • /
    • v.25 no.1
    • /
    • pp.89-97
    • /
    • 2019
  • This study aims to make a revitalizing plan for managing and maintaining of facilities which were installed after the rural development projects. The survey was conducted to examine some issues of operating facilities from the developing plan. There were some factors that should be considered in the establishment stage of the project plan when promoting rural development projects. Among them, the preservation and maintenance of rurality, consistency with business plans, connectivity with local resources, and ease of maintenance were less reflective than its importance. And for each facility, systematic consulting on appropriate scale and operational management plans and detailed planning is needed.. It's also necessary to plan action so that the local community can lead. The current or future rural development project will be succeeded when local governments support to strengthening their local groups or people's abilities.

An Analysis on Planners and Project Objectives of Kakao Storyfunding

  • Yoon, Haing Seok;Kim, Kyoung Soo
    • Journal of Integrative Natural Science
    • /
    • v.11 no.4
    • /
    • pp.212-225
    • /
    • 2018
  • This study is based on the purpose of organizing and planning a fundraising for Daum Kakao's 'storyfunding' during the recent crowdfunding that uses mobile-based Internet platforms to raise funds. Analysis by project subjects shows that one planner is more efficient if the ability of one planner, such as 'publishing', is important. However, there were many group A types of contents that require variety of expertise such as 'campaign' and 'journalism' after funding is completed. As a result of analysis by planning purposes, there were the most funds available to produce contents. This is a sign that there are many projects that match the basic purpose of story funding. There are also many other purposes for the purpose of raising public opinion for the project or the establishment of monuments, or for the support of people, animals, or animal rights groups. And there is a private equity fund to sell or promote products. Such quantitative research and analysis will accurately determine the current situation of crowdfunding and will provide basic data such as efficient human composition and goals setting to achieve the goals of crowdfunding in the future.

A Study on the Residents' Participation in the Development Process of Rural Village - Focused on the Namsa Traditional Theme Village - (농촌마을개발사업의 전개와 주민참여에 관한 연구 -산청 남사 젼통테마마을을 대상으로 -)

  • Kim, Hye-Min
    • Journal of Korean Society of Rural Planning
    • /
    • v.12 no.3 s.32
    • /
    • pp.1-11
    • /
    • 2006
  • After the 2000's, the rural village development projects are designated as participatory rural village development programs and projects. The purpose of this study is to draw a scheme to facilitate resident's participation in rural village development project by exploring the factors influencing resident's participation. For this, in Namsa rural theme village in Dansung-myon, Sanchung-gun, Kyongnam Province, the data were collected through field surveys and interviews residents residing in this village. In addition, observations studies and an opinion survey of the persons concerned in the presentation meetings were also conducted. I investigated and analysed the activation factors and the characteristics of residents' participation, and amenity resources which were essential for community planning including the planning-establishment, theme-searching and development of experience program. Through this study, I drew findings as follows; 1) The leader's leadership and residents' positive participation are very important activation factors in the first stage of rural viability. 2) And then, the external support and concern, the establishment of short-and long-term community planning, and the rural-income increase through the development of amenity resources play important roles as activation factors in the successive stage of rural viability. Based on the results of this study, the following recommendations were made. In order to improve the level of resident's participation in rural village development programs and projects, it is necessary to evaluate their successes, failure, barriers and the positive correlation between their success more delicately. In addition to this, it must be suggested the better model for participatory rural village development programs for the further enhancement and improvement of rural village development projects.

PROGRAMMATIC AND PROJECT-LEVEL RISKS: ESTABLISHING A RISK MANAGEMENT PROCESS FOR MIDDLE EAST PLANT PROJECTS

  • G. Edward Gibson Jr.;John Walewski;SangBum Kim;Clayton Ingam;Hamid Hajian
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1000-1014
    • /
    • 2009
  • Research sponsored by the Korean Government investigated the establishment of a risk management process by Korean contractors involved with plant projects in the Middle East. This research effort builds upon the work completed by the Construction Industry Institute (CII), called the International Project Risk Assessment (IPRA) tool and method, and also explored how CII's Project Definition Rating Index (PDRI) could be incorporated to improve project planning by addressing risks and scope development issues. Specific findings and recommendations were developed including the creation of the Contractor Critical Areas of Concern (CCAC) risk screening tool for Korean contractors pursuing Middle East oil and gas projects.

  • PDF

The Policy Proposal for Selecting Facility-stems of Rural Living Environment Renewal Program (농촌생활환경정비 대상 시설항목의 선정: 정책적 제안)

  • 윤원근;이상문
    • Journal of Korean Society of Rural Planning
    • /
    • v.4 no.2
    • /
    • pp.8-19
    • /
    • 1998
  • The problem of outdated and surplus facility-items in existing Rural Living Environment Renewal Program(RLERP) makes this study focus on restricting the range of facility sorts for the purpose of coㅁins with the changing rural living environment. In the four aspects of plan establishment, project implementation, comprehensiveness and linkage between programs, this study made an analysis of the existing RLERP that has 4-stage hierarchy, namely, Gun(county), Myun(primary administrative district), village and project site level Firstly, Myun and upper level policy programs fulfill the comprehensiveness and planning aspects, but have defects in the implementation and linkage aspects. Secondly, the village level programs satisfies more or less the four condition, but give rise to the problems of equity between the project target village and the non-target, and of generalization of the planning method applying to a specific village. At last, project level programs, controlled by several ministries, have defects in comprehensiveness and linkage aspects, exposing the sectoralism of central government. Above all, the existing RLERP has so many facility items, which have led to inefficient investment till now. Therefore, it's necessary that the environmental facilities should be selected(simultaneously reduced ), referring to following 5 criteria. (1) Exception of facilities relating to agricultural production. (2) Confined to public facilities to be constructed by government support. (3) Common-use facilities located in small town and below level area. (4) Consideration of not only the present need but also the future need of rural residents. (5) Reflection of a regional difference of mountain, plane and suburban area. Just 13 kinds of living environmental facilities are finally selected as the result of the selecting work, which can be an new alternative for RLERP. Concludingly, the selected facility items should be integrated into a designated project site by the prepared plan in order to enhance the efficiency of RLERP, investment and also to satisfy the four analytic aspects mentioned above.

  • PDF

Comparative Analysis of Satisfaction by Subjects of College Dormitory Management - Focusing on the J University - (대학 기숙사 관리 운영 주체별 만족도 비교 분석 - J 대학교를 중심으로 -)

  • Kim, Keun-young;Jang, Myunghoun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.47-48
    • /
    • 2021
  • In order to maintain the existence of a university in the era of infinite competition, it is actively promoting the establishment of a school dormitory, one of the welfare facilities, as a way to attract students who want to enter the university. In the past, university dormitories were built by the university and managed and operated on themselves, but recently, due to the poor financial situation of the university, university dormitories promoted BTL method that private construction company built dormitories and rented them for a certain period of time to manage and operate. J University has dormitories managed and operated by itself and dormitories managed and operated by entrusting the private sector. User satisfaction surveys are conducted on two dormitory facilities with different management and operation organizations, and the contents of the survey are compared and analyzed. This study is expected to be used as basic data when planning a dormitory remodeling project or a new dormitory establishment project in the future.

  • PDF

Methodology for Establishment of Operational Concept for Speed-Up of Defense Robot and Improvement Direction of the Defense Acquisition System (국방로봇 신속 전력화를 위한 운용개념 수립 방법론 및 획득체계 개선방향)

  • Eom, Hongseob
    • The Journal of Korea Robotics Society
    • /
    • v.13 no.3
    • /
    • pp.182-189
    • /
    • 2018
  • The purpose of this paper is to suggest the methodology for the establishment of operational concept for speed-up of defense robot and improvement direction of the defense acquisition system for the defense robot. In order to achieve this goal, the current defense acquisition system was analyzed into long-term planning, mid-term programming, and project execution stages. And I suggest the methodology for the establishment of operational concept for speed-up of defense robot and direction of development of the defense robot acquisition system considering the characteristics of the robot in terms of core technologies of robot, robot ecosystem and effectiveness-based-robot-design, respectively. Based on the methodology for establishment of the operational concept of defense robot and development direction of the defense acquisition system presented in this study, it will be possible to design efficiently the defense robot in the future.

A Study on the Prediction of the Construction Cost in Planning Stage of Local Housing Union Project (지역주택조합사업 기획단계의 공사비 예측에 관한 연구)

  • Lee, Jin-Kyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.653-659
    • /
    • 2018
  • The accurate prediction of construction cost is a key factor in a project's success. However, it is hard to predict the construction costs in the planning stages rapidly and precisely when drawings, specifications, construction cost calculation statements are incomplete, among other factors. Accurate construction-cost prediction in the planning stage of a project is also important for project feasibility studies and successful completion. Therefore, various techniques have been applied to accurately predict construction costs at an early stage when project information is limited. There are many factors that affect the construction cost prediction. This paper presents a construction-cost prediction method as multiple regression model with seven construction factors as independent variables. The method was used to predict the construction cost of a local housing union project, and the error rate was 4.87%. It is not possible to compare the cost of the project at the planning stage of the local housing union project, but it has high prediction accuracy compared to the unit price of an existing unit area. It is likely to be applied in construction-cost calculation work and to contribute to the establishment of the budget for the local housing union project.