Korean Journal of Construction Engineering and Management
/
v.5
no.1
s.17
/
pp.71-79
/
2004
In the stage of feasibility study of urban rehabilitation projects, the precise forecast of physical and environmental changes has great influence on the further transaction of the projects. However, various important decision makings are made by the experience and intuition of the person-in-charge in practice without the process and method for systematic and quantitative analysis. In spite of various qualitative influent factors on the projects, the feasibility studies are made by the result of economic analysis only, which often lead the projects to the crucial deficit. The main reasons of such a mal-functional transaction are due to the absence of the reasonal procedure of feasibility study and decision making reflecting the characteristics of urban rehabilitation projects. The objective of this paper is to propose feasibility study processes and decision making methods in relation to various influent factors on urban rehabilitation projects in the initial stage. The goal and process of every analysis stage and the pertinent factors and decision makings are analyzed and proposed through the survey of current research, a case study, interview with the professionals. The processes and methods are well applied to improve current problems of feasibility study of urban rehabilitation projects. In addition, the establishment of the analysis goal at three principal stage and a series of reasonable decision makings with pertinent factors to each stage will lead the project to more successful result than ever.
Journal of the Korean Society of Environmental Restoration Technology
/
v.9
no.4
/
pp.36-51
/
2006
Although the demand and necessity for the facilities of nature environmental conservation and its utilization have been increased recently, the local governments has been experiencing difficulties to launch the facilities since there are no confirmed principles or guidelines for the direction of the facility and distinctions from the ordinary parks. In this regard, the aim of this paper is to provide the overall framework for establishing the facility by equipping checklists from planning to operational stage. The stages are disengaged into 5 steps of siting feasibility, planning, preliminary environmental assessment and environmental impact assessment, design, construction, and operation. This paper also include the recommendations to vitalize the existing facilities, of which expansion of educational program development; utilization of various manpower; provision of appropriate settings; strengthened monitoring; and increased public relations. Furthermore, it is suggested to consider the strengthened local characteristics, reviewing management plan at the stage of applying a new facility establishment to the concerned authority, fostering experts, and expansion of the facilities through restoration of environmentally damaged areas for a new facility.
Proceedings of the Safety Management and Science Conference
/
2013.11a
/
pp.39-48
/
2013
Recently, the using of prefabricated temporary equipments is increasing in the industrial field because it can reduce the installation and dismantling period. The various types of prefabricated temporary equipments are manufacturing with various materials in domestic and overseas countries. However, those equipments should win the safety certificate according to the "Governmental Notification about Safety Certification" which regulate the member-based safety certification. It tends to cause over performance of temporary equipments because it couldn't consider structural benefit of the prefabricated products. As the result of this study, it is concluded that the establishment of new safety certification standard for the prefabricated temporary equipments is resonable and the movable scaffold is appropriate for those prefabricated temporary equipment. The movable scaffolds are using as single structure and cannot be expands horizontally. Other types of temporary equipments are using as complex structure which can freely expand horizontally according to the main structure. From the results of the study, the standard of vertical compression performance of prefabricated movable scaffolds should be more than double the performance of single main frame. Other test items of safety certification standard should be fixed when the Notification is amended. The prefabricated temporary equipments which are adopted for the safety standard on assembled structure should be used, moved and kept in assembled state and not separated discretionally. The establishment of new standard for the assembled structure based on this study leads to the development of various types of temporary equipments using structural efficiency of prefabricated structure.
According to the industrial restructuring in the late 1980's, most domestic mines have been shutdown or suspended in operation. The closed underground excavation caverns remain in their abandoned conditions, and they will potentially cause environmental hazards. To evaluate the feasibility of the utilization of the abandoned caverns, the foreign crises were studied. As a result, we proposed several possible examples including underground storage cavern fur food products, underground compressed air energy system(CAES), and underground repository (or incineration plant) of industrial wastes. Among them, the underground waste repositories are most probable to be seen in Korea in the near future. For this, the study in rock engineering aspects should be conducted, which will include the establishment of support system and safety measure of the abandoned underground excavation caverns.
Decentralized water supply systems, treating the water in users'vicinity, cutting down the distribution system, utilizing the alternative water resources(rainwater harvesting, water reclamation and reuse and so on.) and saving energy and other resources, could be categorized into POU(Point-Of-Use), POE(Point-Of-Entry) and community small scale system. From the literature review, we could thought that decentralized water supply system and hybrid system(integrating centralized and decentralized water supply system within urban water management) might have strengthening comparative advantages to centralized system with respect to: (1) water security, (2) sustainability, (3) economical affordability. Even though it is difficult to derive and quantify direct benefit advantages from decentralized and hybrid system in comparison with centralized system, (1) operational cost reduction, (2) assurance for safe and stability water supply and (3) greenhouse gas reduction can be expected from successful establishment of the former.
KSCE Journal of Civil and Environmental Engineering Research
/
v.31
no.2D
/
pp.315-322
/
2011
The Korea government set a Act called as Before and After Study for a huge SOC projects in order to check their feasibility again at the time of design, construction and completion period. However, the evaluation items and analysis method are so vague that its effectiveness has been challenged. Especially railroad projects need to be evaluated differently by railroad construction types and rolling stocks. This paper suggests the evaluation items as a common items and exclusive items on the type of construction and rolling stocks. Also data collection in the standardized form and GIS techniques and are introduced to analyze evaluation items effectively.
The purposes of this research were to review the validity and to investigated educational needs of the establishment for invention gifted school. And this study was conducted on the establishment plan through diagnosis necessity and validity of the establishment for invention gifted school. The methodes of this study were review, investigation researches, workshop, expert review for validity and a seminar. The results was as follows: First, the invention gifted school presented distinctive curriculum and instruction methods. The curriculum focus on engineering, technology, invention, problem solving, and STEM. And it presented scenario on the establishment of invention gifted school from the viewpoint of necessity and distinction. Second, the invention gifted school investigated high-level transition from demand of education of students and their parents. Third, the necessity level was higher than the validity and feasibility with expert assessment. But, before the establishment of the invention gifted school institute will review pre-requirements and hinder factors.
Korean Journal of Construction Engineering and Management
/
v.12
no.2
/
pp.89-100
/
2011
As an impactive factor on industries and national economy, The Social Overhead Capital(SOC) is major factor to determine the national competitiveness and the investment of SOC is essential for its economic growth. Accordingly, introduction of the preliminary feasibility study and establishment of legal institutionalization and evaluation system has been carried out and reviewed since 1999. Nevertheless of these efforts, basic problems such as lack of scientific method for investment evaluation and loss of effectiveness on feasibility studies are continuously being brought up. Moreover, as the preliminary study to improve the mentioned problems is mainly focused on the economic and estimated demand analysis, the study of policy analysis, the most important phase during a feasibility study, is still insufficient. Therefore, in this paper, a quantitative decision-making model, to which the performance assessment method of Value Engineering(VE) is applied, is developed and proposed to improve the policy analysis of (preliminary) feasibility study that requires combining with relative studies, to induce quantitative analysis method, and to contribute the improvement of value on the political aspect for SOC investment goals and use as a strategic decision-making method by systematic analysis.
Domestic trucking transportation market does not have only the poor business environment but also the serious defects on the transportation trading structure. It makes weaken the competitiveness of trucking industry and hinders the development of trucking industry. The problems of trucking industry such as the recession of the Korean economy and decrease of the trucking charge cause the truck drivers suffer. Korean government and national assembly try to change the law of truck transportation business. The suggested law includes the obligation of trucking information networking system and it can make the transportation business structures more efficiently. This article deals with the strategies for the establishment of trucking transportation networking system and examines the cost-benefit analysis assuming the four demand senario. The results suggest the establishment of the information system not based on the individual trucking industry but on the joint industry at the level of the local area. This article also suggests that the information system has a positive financial feasibility.
Development of a train wireless signal control system using LTE-R technology is expected to have a great ripple effect to the existing signal control market. To make inroads into the international market, it is an urgent issue to practicalize the train wireless signal control system. Because it will require a huge budget to commercialize the wireless signal control system, it is necessary to analyze the feasibility beforehand, with a consideration of the domestic and foreign marketability and the impact on related industries. This study investigated the effect of the practicalization of train control system on future railway and national industrial sectors. We suggested the establishment of a framework for economic feasibility analysis, one that can provide criteria for opportunistic valuation. We also verified this framework through case analysis.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.