Development of a methodology for analysing and quantifying the impact of delay factors affecting construction projects

  • Shebob, Abdulhamid;Dawood, Nashwan;Shah, Raj K.
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.17-29
    • /
    • 2012
  • Delays are one of the biggest problems facing by the construction industry and they have significant financial and social impact in construction projects. The paper presents a framework of Delay Analysis System (DAS) with the aim of analysing the impact of delay factors in Libyan construction projects. The system has designed by integrating the possible delay factors, critical activities of a project using@risk simulator. A case study of building project was demonstrated to identify the impact of delays and the sensitivity of delay factor. The case study result showed that the project might be delayed by 97 to 103 days in comparison to the planned duration. The developed DAS is a tool for analysing and identify the impacts of delay factors and assist to construction manager to take necessary measure in reducing the delay impact. The paper provides a methodology for analysing the possible delay impact in a construction project and informing to construction manager in advance of the possible delay factors.

A Study of Error Analysis for Post Evaluation System on the Construction Projects (건설공사 사후평가시스템 입력오류 분석에 관한 연구)

  • Kim, Kyong-Hoon;Lee, Du-Heon;Kim, Tae-Yeong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.77-85
    • /
    • 2015
  • The data are often missed and many errors of the data are generated in the input process for the post evaluation system on the construction projects, and the reliability of the data falls down much. Accordingly, the detailed analysis about missing and error of data was conducted to ensure reliability of the analysis results about post evaluation on the construction projects. As results in this study, a lot of input data were missed at the initial construction phase, and the data errors were found in the inaccuracy of reference reports, the lack of understanding about input data, and the failure of KRW unit.

DEVELOPMENT OF STRATEGIES FOR APPLICATION OF 4D MODELING IN CONSTRUCTION MANAGEMENT

  • Yang-Taek Kim;Chang-Taek Hyun ;Kyo-Jin Koo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1181-1186
    • /
    • 2005
  • In many construction projects, progress and efficiency are hampered by poor communication of discipline-specific models. For example, architects use 2D or 3D CAD models and builders use CPM diagrams, Gantt charts, and spreadsheets to show their view of the project. Nowadays, advanced computer visualization tools, 4D CAD or VR, can show these disparate models to understand cross-disciplinary impacts of design and construction decisions. In Korea, several leading companies have tried to apply these tools to their pilot projects from the design phase to the maintenance phase. These companies have expected that more project stakeholders could understand a construction schedule more quickly and completely with 4D visualization than with the traditional construction management tools. However, modeling of the 4D CAD or VR can be quite time-consuming and expensive to generate manually and has therefore limited the spread and use of these models. In order to adopt widely those models in construction industry, the areas that those tools could support to take large benefits in diverse functional areas of construction management need to be analyzed. In this study, researchers analyze the usefulness and limitations of the 4D models and VR in the construction industry, develop the strategy of application priority, and improve the 4D modeling method.

  • PDF

An Agent-Based Framework for Investigating Safety-Productivity Tradeoff of Construction Laborers Considering Risk-taking Behavioral Heterogeneity

  • Khodabandelu, Ali;Park, JeeWoong;Kheyrandish, Seyedmohsen
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1114-1121
    • /
    • 2022
  • Construction laborers and crews play a critical role in achieving a safe and productive construction site. Many past research studies used top-down approaches/perspectives for studying the impact of laborers' performance on overall construction site outputs with limited flexibility in accounting for laborers' various characteristics. However, the recent reap in computational advances allowed applications of bottom-up architectures, which can potentially incorporate heterogeneous characteristics of laborers' individual behavioral and decision-making features effectively. Accordingly, agent-based modeling (ABM), as a tool to leverage a bottom-up methodological approach, has been widely adopted by recent research. Existing literature investigated the influence of changes in laborers' behaviors and interactions on either construction sites' safety performance or productivity performance individually, leaving the tradeoff between safety and productivity in this context relatively unexplored. Accordingly, this study aims to develop an agent-based framework to study the tradeoff between project safety and productivity performances resulting from changes in laborers' behaviors after attending safety trainings. Our findings via simulations indicate that proper safety trainings can improve safety performance without negatively impacting productivity performance.

  • PDF

The Current State and Future Directions of Industrial Robotic Arms in Modular Construction

  • Song, Seung Ho;Choi, Jin Ouk;Lee, Seungtaek
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.336-343
    • /
    • 2022
  • Industrial robotic arms are widely adopted in numerous industries for manufacturing automation under factory settings, which eliminates the limitations of manual labor and provides significant productivity and quality benefits. The U.S. modular construction industry, despite having similar controlled factory environments, still heavily relies on manual labor. Thus, this study investigates the U.S., Canada, and Europe-based leading modular construction companies and research labs implementing industrial robotic arms for manufacturing automation. The investigation mainly considered the current research scope, industry state, and constraints, as well as identifying the types and specifications of the robotic arms in use. First, the study investigated well-recognized modular building associations, the Modular Building Institute (MBI), and renowned architecture design magazine, Dezeen to gather industry updates. The authors discovered one university lab and a few companies that adopted Switzerland-based robotic arms, ABB. Researching ABB robotics led to the discovery of ABB's competitor, Germany-based KUKA robotic arms. Consequently, research extended to the companies and labs adopting KUKA models. In total, this study has identified seven modular companies and four research labs. All companies employed robotic arms and gantry robot combinations in a production-line-like system for partial automation, and some adopted design standardization for optimization. The common goal among the labs was to achieve greater flexibility and full automation with robotic arms. This study will help companies better implement robotic arm automation by providing recommendations from investigating its current industry status.

  • PDF

Developing an IFC-based database for construction quality evaluation

  • Xu, Zhao;Li, Bingjing;Li, Qiming
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.301-312
    • /
    • 2017
  • Quality evaluation and control represent increasingly important concerns for construction quality management. There is an evident need for a standard data model to be used as the basis for computer-aided quality management. This study focuses on how to realize evaluation of construction quality based on BIM and database technology. In this paper, the reinforced concrete main structure is taken as an example, and the BP neural network evaluation model is established by inquiring current construction quality acceptance specification and evaluation standard. Furthermore, IFC standard is extended to integrate quality evaluation information and realize the mapping of evaluation information in BIM model, contributing to the visualization and transfer sharing of evaluation information. Furthermore, the conceptual entity model is designed to build quality evaluation database, and this paper select MySQL workbench system to achieve the establishment of the database. This study is organized to realize the requirement of visualization and data integration on construction quality evaluation which makes it more effective, convenient, intuitive, easy to find quality problems and provide more comprehensive and reliable data for the quality management of construction enterprises and official construction administratiors.

  • PDF

Standardization of composite connections for trapezoid web profiled steel sections

  • Saggaff, A.;Tahir, M.M.;Sulaiman, A.;Ngian, S.P.;Mirza, J.
    • Structural Engineering and Mechanics
    • /
    • v.55 no.4
    • /
    • pp.765-784
    • /
    • 2015
  • Connections are usually designed either as pinned usually associated with simple construction or rigid normally is associated with continuous construction. However, the actual behaviour falls in between these two extreme cases. The use of partial strength or semi-rigid connections has been encouraged by Euro-code 3 and studies on semi-continuous construction have shown substantial savings in steel weight of the overall construction. Composite connections are proposed in this paper as partial or full strength connections. Standardized connection tables are developed based on checking on all possible failure modes as suggested by "component method" for beam-to-column composite connection on major axis. Four experimental tests were carried out to validate the proposed standardised connection table. The test results showed good agreement between experimental and theoretical values with the ratio in the range between 1.06 to 1.50. All tested specimens of the composite connections showed ductile type of failure with the formation of cracks occurred on concrete slab at maximum load. No failure occurred on the Trapezoidal Web Profiled Steel Section as beam and on the British Section as column.

A STUDY ON MUTUAL COMMUNICATION SYSTEM BUILDING FOR CUSTOMER SATISFACTION

  • Jong-Chul Go;Hyun-Bae, Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1124-1127
    • /
    • 2009
  • With the help of information and technology development since 2000, there have been increasing number of community forums for communications among future residents through on-line webs after the contracts for purchases have been signed. However, more complaints are being filed since the construction companies take less care of them in the nation. Therefore, a mutual communication system is to be proposed in this paper in order to reduce the complaints in advance due to improper communications, to improve the customer satisfaction, to analyze the troubles for communication, and to provide solutions for better mutual communications

  • PDF

MODEL FOR ORGANIZATIONAL STRATEGY IN INTERNATIONAL CONSTRUCTION JOINT VENTURES: ORGANIZATIONAL ECONOMICS PERSPECTIVE

  • Yi-Hsin Lin;S. Ping Ho
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.768-773
    • /
    • 2005
  • Among various joint ventures, International Construction Joint Ventures (ICJVs) have emerged as a popular approach worldwide to developing large scale projects through international participation. A model, based on economic analysis and represented by several hypotheses obtained from the analysis, will be developed. Furthermore, we will empirically test the hypotheses/model using Structural Equation Model (SEM). This research is expected to explain why there exist different organizational forms for ICJVs, and to develop a framework for choosing appropriate forms with respect to various characteristics of ICJVs.

  • PDF

A STUDY ON THE OPTIMAZATION OF CONSTRUCTION MANAGEMENT BY USING A DESIGN STRUCTURE MATRIX

  • Nobuyuki Suzuki;Aketo Suzuki
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.383-388
    • /
    • 2005
  • In the construction industry, complex works are carried out with significant resources under non-linear circumstances where clear concepts of project management could be of benefit to all parties and personnel involved. In this paper, we define the optimum project management configuration for construction management by using DSM (Design Structure Matrix). Furthermore DSM can be visualized as a network model, and then Graph Theory provides us the numerical results.

  • PDF