References
- A.A. Bubshait, M.J. Cunningham, "Comparison of delay analysis methodologies", Journal of Construction Engineering and Management, vol. 124, no. 4, pp. 315-322, 1998. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:4(315)
- S. AbouRizk, P. Knowles, U.R. Hermann, "Estimating labor production rates for industrial construction activities", Journal of Construction Engineering and Management, vol. 127, no. 6, pp. 502- 511, 2001. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:6(502)
- O. Abdelnaser, J. Peter, A. Mahmood, A. Hussin, H. Aziz, "Causes of construction delays", case studies in Langkawi Island, Malaysia, Paper presented at International Conference on built environmental in Kuala Lumpur, Malaysia, organized by University of Malaya, 2005.
- S.M. Ahmed, S. Azhar, P. Kappagntula, D. Gollapudil, "Delays in construction: a brief study of the Florida construction industry", Proceedings of the 39th Annual ASC Conference, Clemson University, Clemson, SC, USA, pp. 257-266, 2003.
- W.A.M. Alaghbari, "Factors affecting construction speed of industrialized building systems in Malaysia", Master's thesis, University Putra Malaysia, Serdang, 2005.
- A.H. Al-Moumani, "Construction Delay: a quantitative analyses", International Journal of Project Management, vol. 18, no. 1, pp. 51-59, 2000. https://doi.org/10.1016/S0263-7863(98)00060-X
- S.A. Assaf, M. Al-Khalil, M. Al-Hazmi, "Causes of Delay in Large Building Construction Projects", Journal of Project Management in Engineering, vol. 11, no. 2, pp. 45-50, 1995.
- D.K.H. Chua, Y.C. Kog, P.K. Loh, E.J. Jaselskis, "Model for construction budget performance neural network approach", Journal of Construction Engineering and Management, vol. 123, no. 3, pp. 214-222, 1997. https://doi.org/10.1061/(ASCE)0733-9364(1997)123:3(214)
- N. Dawood, "Estimating project and activity duration: a risk management approach using network analysis", Construction Management and Economics, vol. 16, no. 1, pp. 41- 48, 1998. https://doi.org/10.1080/014461998372574
- Y. Frimpong, J. Oluwoye, I. Crawford, "Statistical methods", 2nd ed., Academic, New York, 2003.
- General People's Committee, Regarding permission for investors to execute their investment activities in Libya, decision no. (22) 2003.
- A.S. Hanna, M. Gunduz, "Early warning signs for distressed projects", Canadian Journal of Civil Engineering, vol. 32, no. 5, pp. 796-802, 2005. https://doi.org/10.1139/l05-032
- P. Jaskowski, S. Biruk, "The conceptual framework for construction project risk assessment", Reliability: Theory & Applications, vol. 2, no. 3, pp. 27-35, 2011.
- E.J. Jaselskis, D.B. Ashley, "Optimal allocation of project management resources for achieving success", Journal of Construction Engineering and Management, vol. 117, no. 2, pp. 321-340, 1991. https://doi.org/10.1061/(ASCE)0733-9364(1991)117:2(321)
- Y.C. Kog, D.K.H Chua, P.K. Loh, E.J. Jaselskis, "Key determinants for construction schedule performance", International Journal of Project Management, vol. 17, no. 6, pp. 351-359, 1999. https://doi.org/10.1016/S0263-7863(98)00058-1
- S.T. Kometa, P.O. Olomolaiye, F.C. Harris, "Attributes of UK construction clients influencing project consultants' performance", Journal of Construction Management and Economics, vol. 12, no. 5, pp 433-443, 1994. https://doi.org/10.1080/01446199400000053
- S. Lee, D.W. Halpin, "Predictive tool for estimating accident risk", Journal of Construction Engineering and Management, vol. 129, no. 4, pp. 431-436, 2003. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:4(431)
- N.R. Mansfield, "Causes of delay and cost overruns in Nigerian construction project", International Journal of Project Management, vol. 12, no. 4, pp. 254-260, 1994. https://doi.org/10.1016/0263-7863(94)90050-7
- M. Mezher, W. Tawil, "Causes of delays in the construction industry Lebanon", Engineering Construction and Architectural Management, vol. 5, no. 3, pp. 251-260, 1998.
- C.A.R. Morano, C.G. Martins, M.L.R. Ferreira, "Application of techniques for the identification of risk in the E & P ventures Engevista", vol. 8, no. 2, pp. 120-133, 2006.
- R. Sonmez, J.E. Rowings, "Construction labor productivity modelling with neural networks", Journal of Construction Engineering and Management, vol. 124, no. 6, pp. 498-504, 1998. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:6(498)
- S.O. Ogunlana, K. Prokuntong, V. Jearkjirm, "Construction Delays in Fast Growing Economy Comparing Thailand with Other Economies", International Journal of Project Management, vol. 14, no. 1, pp. 37-45, 1996. https://doi.org/10.1016/0263-7863(95)00052-6
- W. Alaghbari, M.R.A. Kadir, A. Salim, Ernawati "The significant factors causing delay of building construction projects in Malaysia", Engineering, Construction and Architectural Management, vol. 14, no. 2, pp. 192-206, 2007. https://doi.org/10.1108/09699980710731308
- Y. Kim, K. Kim, D. Shin, "Delay Analysis Method Using Delay Section" Journal of construction engineering and management, vol. 131, no. 11, pp. 1155-1164, 2005. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:11(1155)
- E.K. Zaneldin, "Construction claims in United Arab Emirates: Types, causes, and frequency", International Journal of Project Management, vol. 24, no. 5, pp. 453-459, 2006. https://doi.org/10.1016/j.ijproman.2006.02.006
- T.M. Zayed, D.W. Halpin, "Pile Construction Productivity Assessment", Journal of Construction Engineering and Management, vol. 131, no. 6, pp. 705-714, 2005. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:6(705)
Cited by
- A quantitative risk assessment methodology for construction project vol.43, pp.7, 2018, https://doi.org/10.1007/s12046-018-0846-6