A Study of Error Analysis for Post Evaluation System on the Construction Projects

건설공사 사후평가시스템 입력오류 분석에 관한 연구

  • Kim, Kyong-Hoon (Construction Management & Economy Research Division, Korea Institute of Civil Engineering and Building Technology) ;
  • Lee, Du-Heon (Construction Management & Research Division, Korea Institute of Civil Engineering and Building Technology) ;
  • Kim, Tae-Yeong (Construction Management & Economy Research Division, Korea Institute of Civil Engineering and Building Technology)
  • 김경훈 (한국건설기술연구원 건설관리.경제연구실) ;
  • 이두헌 ;
  • 김태영 (한국건설기술연구원 건설관리.경제연구실)
  • Received : 2014.12.04
  • Accepted : 2015.02.02
  • Published : 2015.03.31

Abstract

The data are often missed and many errors of the data are generated in the input process for the post evaluation system on the construction projects, and the reliability of the data falls down much. Accordingly, the detailed analysis about missing and error of data was conducted to ensure reliability of the analysis results about post evaluation on the construction projects. As results in this study, a lot of input data were missed at the initial construction phase, and the data errors were found in the inaccuracy of reference reports, the lack of understanding about input data, and the failure of KRW unit.

현재 건설공사 사후평가시스템 입력과정에서 자료가 오류 및 누락이 발생되는 경우가 많아 데이터의 신뢰성이 떨어지는 경우가 많다. 이에 따라 본 연구에서는 사후평가 결과분석의 신뢰성 확보를 위해 건설공사 사후평가시스템의 입력누락 및 입력오류에 대한 세부적인 분석을 실시하였다. 분석결과, 건설사업 초기 단계일수록 자료의 미입력된 자료의 비중이 높게 나타났다. 그리고 분석된 등록오류로는 참고자료의 부정확, "원" 단위 오류, 입력항목에 대한 이해부족 등으로 나타났다.

Keywords

References

  1. Song, D., and Go, S. (2014). A Study on the Selection of Ex-Post Evaluation Items of Construction Project based on the Preliminary Feasibility Study, Journal of Architectural Institute of Korea, 16(2), pp. 125-134.
  2. Cho, C., Kim, S., and Ahn, C. (2011). A Study on Improvement Evaluation of Reliability of Ex-post, Conference Proceedings of Korea Society for Railway, 2011(10), pp. 2182-2191.
  3. Kwon, S., Park, H. (2009). The Case Study of Post Evaluation for Apartment Complex Projects, Journal of Architectural Institute of Korea, 25(7), pp. 121-128.
  4. Kim, J., and Kwon, S. (2009). A Development of the Post-evaluation Model in the Public Construction: Focus on an Apartment, Journal of Architectural Institute of Korea, 25(3), pp. 119-127.
  5. Kim, J., Jo, C., Sin, T., Kwon, S., Kim, Y., and Jin, S. (2008). A Foundation Study for User Satisfaction Degree's Estimated Model of Post-Evaluation in the public construction, Conference Proceedings of Korea Institute of Construction Engineering and Management, KICEM, 8, pp. 431-434.
  6. Lee, D., Kwon, S., Park, H. (2007). Reformation Proposal of Post Evaluation Regulation for Public Construction Projects, Journal of Architectural Institute of Korea, 23(3), pp. 113-120.
  7. Lee, E., Kim, K., Lee, Y., Kim, J. (2007). A Study on the Proposal of Post-Evaluation Model Through Improvement of Post-Evaluation Indicators in the Public Construction, Journal of Architectural Institute of Korea, 23(12), pp. 133-140.
  8. Lee, E., Ha, H., Choi, J., Jung, K., Park, C., and Kim, J. (2006). A Basic Study on the Influential Factors Analysis of Post-Evaluation Item of Performance Measurement System in Construction Project, Conference Proceedings of Korea Institute of Construction Engineering and Management, KICEM, 6, pp. 347-350
  9. Kim, W., Koo, K., and Hyun, C. (2003). A Study on the Selection of Post-Evaluation Factors for the Building Construction, Journal of Architectural Institute of Korea, 19(12), pp. 171-178.
  10. Chon, W., Cho, H., and Kang, W. (2002). Development of Ex Post Evaluation Process on Road Construction, Conference Proceedings of Korean Society of Civil Engineers, KICEM, 2, pp. 1042-1045.
  11. Kim, W., Seo, Y., Koo, K., and Hyun, C. (2002). A Study on the Selection Method of Evaluation Index for the Evaluation of Outcomes in the Construction:Focusing on Quality, Conference Proceedings of Architectural Institute of Korea, 22(1), pp. 393-396.
  12. Korea Ministry of Government Legislation,