• Title/Summary/Keyword: Emergency power

Search Result 744, Processing Time 0.026 seconds

Study on Emergency Generator Capacity Selection(PG3) in the Chemical Plant (화학 플랜트에서의 비상발전기 용량선정 방안(PG3)에 관한 연구)

  • Lee, Seung-Jae;Jo, Man-Young;Kim, Se-Yong;Kim, Eun-Tae;Kang, Byoung-Wook;Park, Han-Min;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.12
    • /
    • pp.55-60
    • /
    • 2015
  • PG and RG methods are widely known method for calculating the capacity of the emergency generator in construction electrical installation. PG and RG methods are mainly used as a saving a life, fire protection, fire fighting in construction. Because no long distance between the emergency generator and electric motor feeder, the relatively small motor power in construction electrical installation, the capacity of generator in PG and RG methods are little problem of voltage and reactive power of generator. However in many cases the application of the PG and RG method is difficult in the Chemical Plant because it is long distance between the generator and the motor Feeder and motor capacity is very large. Motor starting power factor is about 0.2 lagging power factor and motor starting current is about 6times during motor staring. Also Most of the staring current component is a reactive power component. therefore, it is many cases that lack of reactive power and excess of allowable voltage drop limit and After selection of emergency diesel generator, problems happen during motor starting. Therefore, to be selection of effective emergency generator, active generator power, reactive power and the required reactive power during large motor starting should be considered in chemical plant. It is also required of the verification process through simulation because hand calculation is very difficult considering study cases.

Concept of an intelligent operator support system for initial emergency responses in nuclear power plants

  • Kang, Jung Sung;Lee, Seung Jun
    • Nuclear Engineering and Technology
    • /
    • v.54 no.7
    • /
    • pp.2453-2466
    • /
    • 2022
  • Nuclear power plant operators in the main control room are exposed to stressful conditions in emergency situations as immediate and appropriate mitigations are required. While emergency operating procedures (EOPs) provide operators with the appropriate tasks and diagnostic guidelines, EOPs have static properties that make it difficult to reflect the dynamic changes of the plant. Due to this static nature, operator workloads increase because unrelated information must be screened out and numerous displays must be checked to obtain the plant status. Generally, excessive workloads should be reduced because they can lead to human errors that may adversely affect nuclear power plant safety. This paper presents a framework for an operator support system that can substitute the initial responses of the EOPs, or in other words the immediate actions and diagnostic procedures, in the early stages of an emergency. The system assists operators in emergency operations as follows: performing the monitoring tasks in parallel, identifying current risk and latent risk causality, diagnosing the accident, and displaying all information intuitively with a master logic diagram. The risk causalities are analyzed with a functional modeling methodology called multilevel flow modeling. This system is expected to reduce workloads and the time for performing initial emergency response procedures.

A Study on the Analysis of Failures Related to Emergency Diesel Generators in Overseas Nuclear Power Plants (원전용 비상디젤발전기 국외 손상사례 분석에 관한 연구)

  • Chang, Jung-Hwan;Kim, Jin-Sung;Chung, Hae-Dong;Cho, Kwon-Hae
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.5 no.1
    • /
    • pp.32-37
    • /
    • 2009
  • The emergency diesel generator (EDG) in a nuclear power plant (NPP) shall start within 10 secondss and supply electrical power to engineered safety features within one minute and less if a loss of offsite power (LOOP), A design-basis event, or their combination occur. Each NPP has an EDG set consisting of two diesel generators for redundancy. In addition to the EDG set, an alternate Alternating Current Diesel Generator (AAC DG) is installed and shared by several units to cope with a station black out (SBO), i.e., loss of the offsite power concurrent with reactor trip and unavailability of the EDG set. The objective of this study is to analyze the failure data of emergency diesel generators reported in overseas nuclear power plants.

  • PDF

Application Study of Condition Monitoring Technology for Emergency Diesel Generator at Nuclear Power Plant (원자력발전소 비상디젤발전기 상태감시 기술 적용 연구)

  • Choi, K.H.;Park, J.H.;Park, J.E.;Lee, S.G.
    • Journal of Power System Engineering
    • /
    • v.13 no.1
    • /
    • pp.53-58
    • /
    • 2009
  • The emergency diesel generator(EDG) of the nuclear power plant is designed to supply the power to the nuclear reactor on Station Black Out(SBO) condition. The operation reliability of onsite emergency diesel generator should be ensured by a conditioning monitoring system designed to monitor and analysis the condition of diesel generator. For this purpose, we have developing the technologies of condition monitoring for the wolsong unit 3&4 standby diesel generator including diesel engine performance. In this paper, technologies of condition monitoring for the wolsong standby diesel generator are described about three step. First is for selection of operating parameter for monitoring. Second is for technologies of online condition monitoring, Third is for monitoring of engine performance.

  • PDF

SUGGESTIONS FOR IMPROVMENTS OF THE RADIATION PROTECTION FOR THE EMERGENCY WORKERS DURING THE FUKUSHIMA NUCLEAR POWER PLANT ACCIDENT

  • Khasawneh, Khalid;Cho, Kun-Woo
    • Journal of Radiation Protection and Research
    • /
    • v.39 no.2
    • /
    • pp.103-108
    • /
    • 2014
  • Following the emergency work in Fukushima Daiichi nuclear power plant, more attention was paid for the radiation protection of workers working under severe accident condition. The protection procedure for the emergency workers, including the on-site emergency center, the seismic isolated building and the reestablishment of the radiation protection framework were analyzed to investigate drawbacks and deficiencies which led to adverse effects on the emergency planning and on emergency workers' health and comfort. Those drawbacks were identified and studied, and then suggestions were made to enhance the emergency working condition to avoid any future problems during severe accident emergency work and management.

Direct Load Control Scheme for Congestion Problems in Power System Emergency (비상시 선로혼잡 해결을 위한 직접부하제어)

  • Shin, Ho-Sung;Kim, Byoung-Su;Song, Kyung-Bin;Kim, Jae-Chul;Lee, Hak-Ju;Kwon, Seong-Chul
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2005.05a
    • /
    • pp.307-310
    • /
    • 2005
  • Most of the electric power in the power system of South Korea is flowing from the south area to the north area, Seoul, in the capital of South Korea. Almost of the needs of the electric power in the capital area are about 43% of the total loads and generation plants are mainly located in the south area of South Korea. As mentioned the earlier characteristic, transmission congestion is one of the important research issues. Because of the limits of the power flows from the south to the north which are anticipated to be increased more and more in the future, these congestion situations may cause a serious voltage stability problem in emergency of the power system. Accordingly, we are interested in an interruptible load control program so as to solve this problem in emergency. This problem can be solved by an interruptible load management in emergency, however, the systematic and effective mechanism has not been presented yet. In this paper, the algorithm of interruptible load management plan using the line sensitivity to the loads for the transmission congestion management in emergency is presented. The proposed method is applied to 6-Bus sample system and their results are presented.

  • PDF

Feasibility study for the self powered wireless emergency call button using electromagnetic energy harvesting mechanism (전자기유도방식의 에너지 하베스팅을 이용한 자가발전 무선 비상호출기 구현 연구)

  • Kim, Il-Jung;Choi, Yeon-Suk
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.2
    • /
    • pp.111-119
    • /
    • 2014
  • This paper describes the design and implementation of a electromagnetic energy harvesting mechanism and electronic circuit for autonomous emergency call system. This analysis results show the power output of the proposed harvesting mechanism and circuit up to max power output 5V and it can hold up to 65 msec of the power generation and 10msec of the RF transmission. Based on the these testing results, the implementation of autonomous emergency call device without battery power or any external power source is feasible.

Improvement Methods in NPP's Radiation Emergency Plan: An Administrative Approach (행정적 대응을 중심으로 본 원전 방사선비상계획 개선방안)

  • Lee, Yoon-Wook;Yang, He-Sun
    • Journal of Radiation Protection and Research
    • /
    • v.34 no.3
    • /
    • pp.151-154
    • /
    • 2009
  • The Radiation Emergency Plan (REP) can be divided into a technical and an administrative responses. The domestic NPP's REPs are reviewed from the viewpoint of the administrative response and improvement methods are also suggested in this treatise. The fields of the reviews are the composition of the emergency response organizations, the activation criteria of the organizations, the selection of the staffings and the reasonableness of the REP's volume. In addition, the limitations of the current radiation exercises are reviewed and the improvement method of the exercise is presented. It is expected that the suggested recommendations will be helpful in establishing useful REPs and making practical radiation exercises in Korea.

Battery Sizing of Lithium-Based Battery for Emergency Power Supply in Nuclear Power Plants (전 비상전원 적용을 위한 리튬계열전지 용량 설계)

  • Park, Seongyun;Kim, Gunwoo;Lee, Pyeongyeon;Kim, Jonghoon;Park, Sungbeak;Kim, Youngmi
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.24 no.5
    • /
    • pp.342-348
    • /
    • 2019
  • The emergency power supplies (EPSs) are required to increase battery sizing for protecting power source loss above designed criteria. This study proposes a sizing method for lithium-based batteries for EPSs in nuclear power plants on the basis of the calculation method for the required energy under variable conditions. The variable conditions are related with the characteristics of lithium-based batteries, such as the temperature of the location of EPS installation, aging, and design margin. The usage of lithium-based battery reduces the cost and installation space and enables the safe and long-term supply of power compared with the use of lead-acid battery.

Development of Hybrid Power Storage System for Urban Railway with UPS Function for Emergency Power Generation (비상발전용 UPS 기능을 갖춘 도시철도용 복합형 전력저장시스템 개발)

  • Hong, Kyungjin
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.19 no.6
    • /
    • pp.191-196
    • /
    • 2019
  • In the case of urban railway facilities, the power supply should be maintained for the safe movement of passengers in communication facilities, disaster prevention facilities and boarding area security because of the confusion when power supply is cut off due to the nature of public transportation. In addition, considering that the number of trains is running on the urban railway line, it is necessary to operate at least 30 minutes for the bus stop and at least 1 hour for the communication and disaster prevention facilities. Therefore, it is essential to supply emergency power source to maintain stable operation of induction lamp and smoke exhaust system because main power is cut off in order to prevent further spread due to fire in case of the history of urban railway section or vehicle fires. Recently, UPS(Uninterruptible Power Supply) function to prevent power outage in emergency, emergency power generation combined with ESS function which saves electricity at nighttime price time, A hybrid power storage system with a UPS function.