• Title/Summary/Keyword: Embankment material

Search Result 134, Processing Time 0.035 seconds

An Experimental Study for Estimation of Compression Settlement on Embankment Material Under Self-weight (성토체 압축침하량 산정에 관한 연구)

  • Kwon, Jeongeun;Noh, Ilkwon;Jung, Juyoung;Im, Jongchul
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.4
    • /
    • pp.33-40
    • /
    • 2009
  • In earthwork projects, the designer considers cut and fill balance for minimizing earthwork which may significantly decrease construction costs. Despite carrying out considerable earthwork design, the decrease in volume of earth occurs in construction sites because of embankment settlement under self-weight, consolidation settlement of soft ground, cavity filling and soil loss due to rainfall-runoff. To reflect the decrease in volume of earth, the specifications for road construction just give shrinkage factors in embankment for soils without consideration of embankment settlement under self-weight. In this study, the computational method is used to estimate the amount of embankment settlement under self-weight developed by Iseda (1972) and Ishii (1976). This research shows that the total compression settlements are between 3 to 10 percent of embankment height according to the property of embankment material and embankment height. As a result, the designer should consider the compression settlement on embankment material under selt-weight.

  • PDF

Visual Preference of the Methods for River Embankment - The Case of Dongchon in Gwangyang - (하천호안공법의 시각적 선호도 - 광양시 동천을 사례로 -)

  • Lee Sang-Suk
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.34 no.3 s.116
    • /
    • pp.12-22
    • /
    • 2006
  • The purpose of this study is to evaluate visual preferences of the methods for river embankment based on seasonal changes and to reveal the relationship between visual preference and effective factors, which are the physical and esthetic elements inside the river. For this research seven river embankment methods including concrete block, concrete wall, gabion, and vegetated concrete block were selected in Dongchon of Gwangyang. Twenty-eight pictures by the four pictures of each embankment method based on seasonal changes, the winter and summer of the first and second years after construction were used for a photo-questionnaire by 49 participants. In the analysis of the relationship between visual preference and effective factors, the independent variables included eight factors: form of the material, harmony with the surroundings, the cleanness of river floor, the green area of embankment methods, the water area in river floor, the stone and sand area in river floor, the planting area in river floor, and the area of embankment itself. The result of this study are as follows. First, visual preference in summer was higher than in winter, and the summer landscape of the second you scored the highest value for visual preference. Second, similarly to the way the vegetated concrete block produced a green effect, cobblestone and gabion embankments made of natural materials scored higher than others, whereas the concrete retaining wall scored the lowest of all methods because of it's artificiality. Third, the seven independent variables, except form of the material, are proved statistically significant at the 5% level. The water area in river floor, harmony with the surroundings, the planting area in river floor, and the cleanness of the river floor were revealed as more effective factors influencing visual preference. The research results suggest that the riverscape has to be controlled in terms of seasonal change and embankment methods. Natural materials and green effects in embankment methods are more important for increasing landscape preference, and the landscape factors inside a river should also be considered important variables. It is recommended that advanced study on other factors affecting visual preference of the riverscape be carried out to support this research.

River Embankment Integrity Evaluation using Numerical Analysis (수치해석을 이용한 하천제방의 건전도 평가)

  • Byun, Yo-Seph;Jung, Hyuk-Sang;Kim, Jin-Man;Choi, Bong-Hyuck;Kim, Kyung-Min;Chun, Byung-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.524-528
    • /
    • 2009
  • An influence factors for soundness evaluation of river levee include resistibility and embankment for piping of ground consisting embankment in case piping, permeability coefficient of ground, height of embankment, the width of crest, material characteristics of embankment and foundation ground, shape of embankment slope, an influence for penetration of rainfall or river water in case slope stability. In this study, it was operated a feasibility investigation of existing design result, stability evaluation for permeability coefficient use and permeability coefficient change of foundation ground to investigate an influence in line with permeability coefficient change for result of river levee penetration analysis. The evaluation results of influence factors, the permeability coefficient used in design and it was evaluated influence in safety factor of piping. After the evaluation of influence factors, the permeability coefficient used in the design appears with the fact that differs in a design report about same soil, Accordingly, the stability investigation of embankment by application of literature data can affect stability evaluation results by change factors like a permeability coefficient, void ratio. It should be certainly used material properties by a test in soundness evaluation of river levee.

  • PDF

A Study on the Pile Material Suited for Pile Supported Embankment Reinforced by Geosynthetics (토목섬유로 보강된 성토지지말뚝 구조에 적합한 말뚝재료의 개발)

  • Choi, Choong-Lak;Lee, Kwang-Wu;Kim, Eun-Ho;Jung, Ji-Won
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.1
    • /
    • pp.21-35
    • /
    • 2016
  • It is a current trend that the concrete track is applied for high speed railway. In the case of the railway embankment constructed on soft ground, the damage to concrete track which is sensitive to settlement such as distortion and deflection could be caused by very small amount of long term settlement. Pile Supported Embankment method can be considered as the effective method to control the residual settlement of the railway embankment on soft ground. The Geosynthetics is used inside of the embankment to maximize the arching effect transmitting the load of the embankment to the top of the piles. But, PHC piles that are generally used for bridge structures are also applied as the pile supporting the load of embankment concentrated by the effect of the Geosynthetics. That is very low efficiency in respect of pile material. So, in this study, the cast in place concrete pile was selected as the most suitable pile type for supporting the embankment by a case study and the optimum mixing condition of concrete using a by-product of industry was induced by performing the mixing designs and the compressive strength designs. And it is shown that the cast in place pile with the optimum mixing condition using the by-product of industry is 2.8 times more efficient than the PHC pile for the purpose of Pile Supported Embankment by the finite element analysis method.

The application levee material in the bed sediment of Nakdong River (낙동강 하상토의 제방재료 활용방안)

  • Choi, Gye-Woon;Lee, Seung-Woo;Lee, Ho-Sun;Lee, Byung-Joo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1576-1580
    • /
    • 2006
  • The destruction of river and damage caused by flood are suddenly increasing due to the abnormal climate. In the investigation result about the damage, approximate 52% of the destruction of embankment are caused by earth work. Moreover, to recover conveyance of relief channel, bed sediment is dredged about 198 millions $m^3$ with 'the project of bed dredging'. So, the concern for bed sediment is the more increasing, the requiring high quality material for banking and the way for application of bed sediment are also the more increasing. In this paper, properties of bed sediment were analyzed through sedimentary mechanism analysis. Moreover, possibility to build embankment with bed sediment in 6 points which is in catchment of the Nak-dong river was also analyzed. At 6 points, which were selected to survey easily, sediment discharge was analyzed with formula. Moreover, size and permeability were analyzed and the feasibility for material of embankment was proposed. If bed sediment wasn't proper, complementary measures were proposed.

  • PDF

A Study on Application as fill materials of Bottom Ash and Tire Shred by Field Test Embankment (현장시험성토를 통한 석탄회 및 폐타이어의 성토재료 활용성 검토)

  • Lee, Sung-Jin;Kim, Yun-Ki;Lee, Tae-Yoon;Shin, Min-Ho;Hwang, Seon-Keun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1032-1039
    • /
    • 2010
  • Based on the proven feasibility of bottom ash and tire shred-soil mixtures as lightweight fill materials, tire shred-bottom ash mixtures were suggested as a new lightweight fill material to replace the conventional construction material with bottom ash. Therefore, we carried out the laboratory test, field compaction test and performance test of large scale embankment in order to evaluate their suitability for the use of lightweight fill materials in the before studies. We could verified that the ash, tire-shred and the mixture are able to be the useful materials as light fill materials. In this study, we built real scale embankment with RBA(Reclamated Bottom Ash), TRBA(Tire shred-Reclamated Bottom Ash mixture), WS(Weathered Soil), BA(Bottom Ash screened by 5mm sieve) for monitoring the behavior such as settlement, lateral displacement and water content change. Furthermore, we are examining the ground water quality in the surrounding area of the test embankment.

  • PDF

Safety Assessment of Embankment by Analysis of Electrical Properties (전기비저항 물성 분석을 통한 제체의 안정성 검토)

  • Oh, Seok-Hoon;Suh, Baik-Soo
    • The Journal of Engineering Geology
    • /
    • v.18 no.3
    • /
    • pp.245-255
    • /
    • 2008
  • The variation of the electrical property of embankment material was analyzed from laboratory experiments and the result of field survey, in order to enhance the interpretation of electrical resistivity survey frequently used for safety assessment of embankment. At first, the kaolinite, showing similar physical property with core material of embankment, was used to examine the variation of the resistivity value according to degree of consolidation. The test showed that a drop of shear strength induces increase of resistivity value regardless of degree of water content. This result means that porous zones of weak core material in embankment may be appeared as highly resistive part in the electrical resistivity survey. This observation implies that it may fail to detect weak core material by electrical method, if we only try to and zones showing low resistivity value. And, we performed Standard Penetration Test (SPT) to analyze the correlation between electrical property and ground stiffness. Finally, a mechanism to describe the variation of electrical resistivity due to grouting effect was proposed and real field data were analyzed.

Soil arching analysis in embankments on soft clays reinforced by stone columns

  • Fattah, Mohammed Y.;Zabar, Bushra S.;Hassan, Hanan A.
    • Structural Engineering and Mechanics
    • /
    • v.56 no.4
    • /
    • pp.507-534
    • /
    • 2015
  • The present work investigates the behavior of the embankment models resting on soft soil reinforced with ordinary and stone columns encased with geogrid. Model tests were performed with different spacing distances between stone columns and two lengths to diameter ratios (L/d) of the stone columns, in addition to different embankment heights. A total number of 42 model tests were carried out on a soil with undrianed shear strength $${\sim_\sim}10kPa$$. The models consist of stone columns embankment at s/d equal to 2.5, 3 and 4 with L/d ratio equal 5 and 8. Three embankment heights; 200 mm, 250 mm and 300 mm were tested for both tests of ordinary (OSC) and geogrid encased stone columns (ESC). Three earth pressure cells were used to measure directly the vertical effective stress on column at the top of the middle stone column under the center line of embankment and on the edge stone column for all models while the third cell was placed at the base of embankment between two columns to measure the vertical effective stress in soft soil directly. The performance of stone columns embankments relies upon the ability of the granular embankment material to arch over the 'gaps' between the stone columns spacing. The results showed that the ratio of the embankment height to the clear spacing between columns (h/s-d) is a key parameter. It is found that (h/s-d)<1.2 and 1.4 for OSC and ESC, respectively; (h is the embankment height, s is the spacing between columns and d is the diameter of stone columns), no effect of arching is pronounced, the settlement at the surface of the embankment is very large, and the stress acting on the subsoil is virtually unmodified from the nominal overburden stress. When $(h/s-d){\geq}2.2$ for OSC and ESC respectively, full arching will occur and minimum stress on subsoil between stone columns will act, so the range of critical embankment height will be 1.2 (h/sd) to 2.2 (h/s-d) for both OSC and ESC models.

A Study on the Settlement Characteristics of Fill Dam (FILL DAM의 침하특성(沈下特性)에 관(關)한 연구(硏究))

  • Moon, Tae Wan;Kang, Yea Mook
    • Korean Journal of Agricultural Science
    • /
    • v.12 no.2
    • /
    • pp.282-291
    • /
    • 1985
  • In order to investigate the settlement characteristics of fill dam with decomposed granite is used as a embankment material instead of conventional clay collected behavoir of Andong dam and analyzed. Andong dam is the use of decomposed granite in the embankment material, and various type of gauges were installed in dam to measure a pore pressure, interval vertical settlement, dam crest settlement, relative settlement, surface settlement and internal horizontal movement. The results were summerized as follows; 1. With the increase of embankment loading, the settlement of core zone during construction increased with linear and under the effective stress $7kg/cm^2$ vertical settlement ratio ranged between 0.1 and 0.8% approximately and showed smaller value than that of fill dam with clay were used as a embankment material. 2. Though embankment loading was increased with about over central part of embankment height, the settlement of core zone in the lower part of the embankment was influenced slightly. 3. Pore pressure responsed sensitively with the increase of coefficient of permeability in core zone and settlement increased with pore pressure were dispersed. 4. During construction relative settlement in the lower part of the embankment has the largest influence on magnitude of the relative density and after construction settlement showed larger value in the core zone which has the largest compression height. 5. Settlement distribution of dam crest showed larger value in the central part, maximum section of dam, but smaller value in near the abutment.

  • PDF

Environmental Impact of Phosphogypsum on the Ecotoxicity of A. salina, D. magna, O. latipes, and S. capricornutum

  • Park, Soo-Ho;Han, Bing;Lee, Woo-Bum;Kim, Jongo
    • Journal of Soil and Groundwater Environment
    • /
    • v.21 no.2
    • /
    • pp.15-21
    • /
    • 2016
  • The objective of this study was to determine the feasibility of recycled phosphogypsum (PG) as an embankment material with soil by performing batch and column ecotoxicity experiments. A. salina, D. magna, O. latipes and S. capricornutum were selected for the experiment. The effective concentration (EC50) of D. magna was the lowest value, 1.29 mg/L. The survival rates of A. salina, D. magna and O. latipes were more than 90% in the presence of PG leachate in the column test. The toxicity unit (TU) for the organisms was less than 1, indicating that no significant ecotoxicity effect was found. These findings suggested that PG could be recycled for use as an embankment and landfill material with soil.