• Title/Summary/Keyword: Efficiency of tunnel excavation

Search Result 68, Processing Time 0.025 seconds

The Construction of large and Long Tunnel Using Bulk Explosives (벌크폭약을 이용한 대단면 장대터널 시공 사례)

  • 노상림;문상호;조영천;이상필;유지영
    • Explosives and Blasting
    • /
    • v.22 no.3
    • /
    • pp.65-70
    • /
    • 2004
  • Lately, the length of tunnel, the number of long-large tunnel over 3 lanes are steeply increased because of the request for high-speed and straight road. Therefore, the maximization of excavation efficiency is needed in tunnel construction. The sapaesan tunnel (4 lanes with the length of 4km) construction was delayed with environmental conflict far 2 years. For making-up delayed construction period, various new methods were adopted to improve excavation length, look-out and blasting efficiency. This study introduced bulk explosive which is new method in tunnel blasting and verified the efficiency of bulk explosive far long-large tunnel.

The Study on Optimum Ventilation System during Long Tunnel Construction (굴착중인 장대터널 내 최적의 환기시스템에 관한 연구)

  • Lim, Han-Uk;Oh, Byung-Hwa
    • Journal of Industrial Technology
    • /
    • v.26 no.A
    • /
    • pp.3-15
    • /
    • 2006
  • To determine the optimum ventilation systems during long tunnel excavation, the velocity vector profile and the contaminant's distribution at working place are studied using 2-D, 3-D numerical analysis. The main results can be summarized as follow; In case of long tunnels, blower-exhaust-mixture types which enable to use soft blast ducts is most appropriate in terms of ventilation and economical efficiency. Of the same ventilation types, ventilation efficiency has a difference according to blast ducts and the distance between fan and working place. The 3-D numerical result shows that arranging blower and exhaust ducts in the right and left corners of the tunnel respectively is effective to discharge contaminant. The result of the real measurement shows that CO concentration can be reduced to below 50 ppm, which is regulation value, as 16-minutes fan operation goes on.

  • PDF

한강 하저터널에서의 암반분류 및 평가사례

  • 박남서;이치문;김은섭
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.06b
    • /
    • pp.165-193
    • /
    • 2003
  • The Han River tunnel connecting Yoido and Mapo was constructed as a part of the Seoul subway line No.5, which is 52 km long, to improve the traffic conditions of Seoul. It is constructed 15.6∼30m below the river floor. It Is the first under-river tunnel in Korea with the length of 1,288m. Geological conditions of the ground under the Han River were more complex and irregular than expected at the design stage, because there were several faults, fracture zones and slickensided joints coated with graphite. It was thus indispensable to estimate the ground condition of the tunnel face to apply proper excavation and reinforcement methods. Advance borings and face mappings were performed before excavation to improve constructional efficiency and excavation stability.

  • PDF

Evaluation of blasting vibration with center-cut methods for tunnel excavation

  • Lee, Seung-Joong;Kim, Byung-Ryeol;Choi, Sung-Oong;Kim, Nam-Soo
    • Geomechanics and Engineering
    • /
    • v.30 no.5
    • /
    • pp.423-435
    • /
    • 2022
  • Ground vibration generated repeatedly in blasting tunnel excavation sites is known to be one of the major hazards induced by blasting operations. Various studies have been conducted to minimize these hazards, both theoretical and empirical methods using electronic detonator, the deck charge method, the center-cut method among others Among these various existing methods for controlling the ground vibration, in this study, we investigated the cut method. In particular, we analyzed and compared the V-cut method, which is commonly used in tunnel blasting, to the double-drilled parallel method, which has recently been introduced in tunnel excavation site. To understand the rock fragmentation efficiency as well as the ground vibration controllability of the two methods, we performed in-situ field blasting tests with both cut methods at a tunnel excavation site. Additionally, numerical analysis by FLAC3D has been executed for a better understanding of fracture propagation pattern and ground vibration generation by each cut method. Ground vibration levels, by PPVs measured in field blasting tests and PPVs estimated in numerical simulations, showed a lower value in the double-drilled parallel compared with the V-cut method, although the exact values are quite different in field measurement and numerical estimation.

A Case Study of Minimizing Construction Time in Long and Large Twin Tube Tunnel (대단면 장대터널 공기단축 사례연구)

  • No Sang-Lim;Noh Seung-Hwan;Lee Sang-Pil;Kim Moon-Ho;Seo Jung-Woo
    • Tunnel and Underground Space
    • /
    • v.15 no.3 s.56
    • /
    • pp.177-184
    • /
    • 2005
  • The Sapaesan tunnel, the longest twin tube tunnel (4km) in Korea with 4 lanes each, is under construction with two years of delayed schedule because of the strong opposition from environmental bodies. Therefore, maximizing the construction efficiency was needed in tunnel project to compensate for time delay. This study includes improvements in the construction of the Sapaesan tunnel such as increasing excavation length and changing excavation sequence. In this paper the system for predicting tunnel face ahead is also introduced. Bulk-Emulsion explosive and Cylinder-Cut method were adopted in tunnel blasting to increase the excavation length. Optimum tunnel excavation step was designed to make up delayed time. Tunnel foe mapping, TSP survey and geological prediction system using computerized jumbo-drill were performed fnr safe construction of long and large twin tube tunnel.

Analysis of Ground Deformation Deformation using Resistivity Monitoring Technique at a Tunnel Excavation Area (전기비저항 모니터링을 이용한 터널 주변 지반상태 변화 파악)

  • Ahn, Hee-Yoon;Jeong, Jae-Hyeung;Cho, In-Ky;Park, Sam-Gyu;Kim, Ki-Seog;Jung, Lae-Chul
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.93-100
    • /
    • 2007
  • During tunnel excavation, drawdown of groundwater table or discharge from tunnel faces may not only reduce stability of tunnel and work efficiency but cause environmental problems. We have investigated the applicability of electrical resistivity survey for the establishment of the monitoring system for groundwater behavior and detecting flow channel of groundwater during tunnel excavation. The groundwater level was continuously measured at several points for 1 year. Survey was conduted at every 3 months using preinstalled electrical resistivity cables on site. The results show that observed changes in resistivity ratios in the area can be explained with observed changes in groundwater level. Thus, we believed that electrical resistivity analysed together with groundwater data can be applied for the monitoring of groundwater in tunnel area.

  • PDF

Case Study for the Improvement of Tunnel Advance Rate & the Time Reduction of Working Process in Long Hole Blasting About Tunnel Excavation (터널 장공발파에서 굴진율 개선 및 작업공정 시간 단축 사례)

  • Kim, Hee-Do;Lee, Jun-Won;Lee, Ha-Young
    • Explosives and Blasting
    • /
    • v.31 no.2
    • /
    • pp.32-39
    • /
    • 2013
  • Generally, The way of long hole blasting is carried out in coal-face, basic excavation for dam, mine etc. Recently, this long hole blasting has been implemented in civil engineering for efficiency & economic feasibility. National express no.600 of Pusan outer high-express ${\bigcirc}$ construction site with four lanes of the length of 8km was also a site applied by long hole blasting. But After blasting, tunnel advance rate is less than 75%. As a result of that, Follow-up working time is influenced. Thereby, The total of working process is significantly so increased that planned excavation cannot be implemented many times. For not only improve excavation rate but reduce working process time in job site, we introduce blasting case which apply the ${\phi}36mm$ explosive suited for high desity of charging among long hole blasting in order to overcome mentioned problem.

Improvement Plan of Excavation Performance Based on Shield TBM Performance Prediction Models and Field Data (쉴드 TBM 성능예측모델과 굴진자료 분석을 통한 굴진성능 개선방안)

  • Jung, Hyuksang;Kang, Hyoungnam;Choi, Jungmyung;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.2
    • /
    • pp.43-52
    • /
    • 2010
  • Shield method is the tunnel boring method that propels a steel cylinder in the ground and excavates tunnels at once. After Marc Isambard Brunel started using the method for the Thames Riverbed Tunnel excavation in London, many kinds of TBM (Tunnel Boring Machine) developed and applied for the construction of road, railway, electricity channel, pipeline, etc. In comparison with NATM concept that allows to observe ground condition and copes with difficulty. The machine selected before starting construction is not able to be changed during construction in shield TBM. Therefore the machine should be designed based on the ground survey result and experiment, so that the tunnel might be excavated effectively by controlling penetration speed, excavation depth and cutter head speed according to the ground condition change. This research was conducted to estimate penetration depth, excavate speed, wear of disc cutter on Boondang Railway of the Han Riverbed Tunnel ground condition by TBM performance prediction models such as NTNU, $Q_{TBM}$, Total Hardness, KICT-SNU and compare the estimated value with the field data. The estimation method is also used to analyze the reason of poor excavation efficiency at south bound tunnel.

Development and evaluation of new drilling and blasting method for excavaton of rock mass with one free surface (일자유면 암반 굴착을 위한 신바파공법의 개발 및 평가)

  • 임재웅;윤영재;서정복
    • Tunnel and Underground Space
    • /
    • v.4 no.3
    • /
    • pp.237-249
    • /
    • 1994
  • A new type of cut method, called SK-cut, was developed in order to overcome the shortcomings of the conventional V-cut and Burn-cut blasting methods. Total 190 times of test blasts were performed for the evaluation of the efficiency of new blasting method. V-cut, Burn cut and SK-cut were compared by applying them to the excavation of main gallery and construction tunnel of underground oil storage cavern. Test results showed that excavation efficiency of the new method was increased by 5.9~9.8% and that specific charge was reduced to 71~92%.

  • PDF