• 제목/요약/키워드: Earth construction

검색결과 1,220건 처리시간 0.031초

토공사에서의 재해 방지를 위한 지능형 굴삭 시스템의 계획생성과정 (Intelligent excavating system planning process for disaster prevention in earth work)

  • 이승수;서종원
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2008년도 정기총회 및 학술발표대회
    • /
    • pp.609-612
    • /
    • 2008
  • Since most of the industries have adopted automation system, the industrial disaster has been declined sharply. Also automation system has offered many benefits such as productivity and assured quality. However, the construction industry is still relying on man power and because of this there are many victims occurring due to the industrial disaster. Construction industry has to overcome uncertainty of incidents and changing natural surroundings to actualize automation. Therefore, the efficient working plan and intelligent decision making process are needed to run more developed techniques and automations. Specially to decline the rate of industrial accidents occurred in basic construction in earth work, the automation via excavator is necessary and also the development of planning process system is too. This research is to establish Task Planning System to prevent disaster which is used for planning automated earth work.

  • PDF

응답비를 고려한 효율적인 버팀보 해체방안에 관한연구 (A Study on Efficient Deconstruction of Supporters with Response Ratio)

  • 최정열;박상욱;정지승
    • 문화기술의 융합
    • /
    • 제8권5호
    • /
    • pp.469-475
    • /
    • 2022
  • 최근의 구조물공사는 건물과 근접하여 대규모, 대심도 지하굴착 공사로 흙막이벽과 버팀보의 설치가 복잡해지고, 구조물 슬래브의 간섭을 피하기 위한 버팀보의 단수가 많아졌다. 이러한 시공공정은 구조물의 시공이음 개소의 증가와 누수 및 벽체균열 증가를 유발하는 요인이 되어 구조물 전체의 내구성과 시공성 저하 및 공사기간의 증대로 이어졌다. 본 연구는 시공이음 개소를 축소하기 위한 방안으로서 버팀보 2단을 동시에 해체하는 것을 계획하고, 이를초기가정토압에 의한 반력 값과 현장의 계측치를 응답비로 가정하여 토압을 보정하였다. 반복시산법을 통해 보정토압을 재 산정한 후, 버팀보 2단 동시해체가 가능함을 수치해석으로 검증하였다. 최종 보정 토압을 적용한 수치해석결과, 설계반력에 대한 계측 값이 최대 197%로 나타났다. 이는 지반에 시행한 그라우팅의 효과와 설계 시 지반 특성치를 다소 과소평가한 데에서 기인된 것으로 분석되었다. 본 연구에서 수행한 응답비를 고려한 보정토압 산정결과를 바탕으로 버팀보 해체공정의 개선이 가능함을 해석적으로 입증하였다. 또한 이를 바탕으로 시공이음 축소로 누수에 의한 균열 감소와 시공성도 개선되어 전체적인 공기의 단축도 가능할 것으로 검토되었다. 그러나 현장마다 지반여건과 가시설 및 보강공법 등의 차이가 있어 이를 적용하기 위해서는 충분한 검토와 확인이 필요할 것으로 판단된다.

대형 Pull-out Test에 의한 보강토 지반의 변형특성에 관한 연구 (A STUDY ON THE DEFORMATION OF REINFORCED EARTH USING LARGE SCALE PULL-OUT TEST)

  • 이은수;이승호
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1993년도 가을 학술발표회 논문집
    • /
    • pp.29-32
    • /
    • 1993
  • Presengly reinforced earth is widely utilized for earth structure increasingly not only domestic but also in many foreign countries because of its rapidity of construction and economic merits. The study on the reinforced earth has been actively carried out and enlarged in the theoretical aspect. But it has many problems to the application of the field. In this study large scale Pull-out Test was used to analyze reinforced earthe behavior considering deformation character of reinforced earth under the similar condition to the field.

  • PDF

2열 자립식 흙막이 공법(SSR) 시공사례 연구 (A Case Study on the Self-Supported earth Retaining wall)

  • 이규동;손성곤;심재욱
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.85-86
    • /
    • 2011
  • The temporary support system in Korea have been carried out generally along with installing supports, which are struts, anchors, rakers. However, most of existing support systems in application relatively have limitations such as cost increase, construction configuration, and displacement occurred with support systems. Thus, a new retaining support system(referred to as the SSR, NET No.533) was developed to solve the aforementioned problems. This study introduces the design, construction, and maintenance of the SSR system under the different construction conditions. The behavior and characteristics of the SSR system were identified based on the case studies.

  • PDF

지하역타공법용 개방형 슬래브 개발 (Development of Opened Slab Method for Top-Down Construction)

  • 송지윤;임홍철;강두현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 춘계 학술논문 발표대회
    • /
    • pp.43-46
    • /
    • 2008
  • In Top-Down construction for underground structures, the placement of slab as a horizontal supporting member against lateral earth pressure is an important process in determining construction time and cost. Usually, a reinforced concrete perimeter girder distributes concentrated lateral loads from earth retaining structures such as Cast-in-place (CIP) piles. By combining the function of the R/C perimeter girder and horizontal slabs, the Opened Slab Method is efficient for reducing construction time by elimination of time-consuming formwork for traditional perimeter girders. The structural performance of the method is also discussed in this paper.

  • PDF

석축구조물 및 배면지반의 안정성 검토사례연구 (A Case Study on the Stability Analysis for Masonry Retaining Walls and Backfill)

  • 천병식;여유현;김경민
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제5권1호
    • /
    • pp.149-160
    • /
    • 2001
  • In this paper, the stability analyses were performed for masonry retaining wallls in Seoul subway System. This masonry retaining wallls were reinforced with earth anchor system for the construction, but it was removed after construction. Therefore, the stability of masonry retaining wallls should be checked after the earth anchors removed. For stability analysis of masonry retaining wallls. FDM analysis(FLAC Ver.3.3) and slope stability analysis (SLOPE/W) were performed applying the test results from laboratory and field tests(Schmidt hammer test, cack examination). As conclusion, the tension force of earth anchors should be kept, therefore, substitutional method was required in order to keep the tension force of earth anchor system.

  • PDF

옹벽겸용 흙막이벽으로 PHC말뚝의 적용 사례 연구 (Case Study on Application of PHC Pile to Earth Retaining and Retention Wall)

  • 한중근;홍기권;어윤원;김상귀
    • 한국지반신소재학회논문집
    • /
    • 제5권3호
    • /
    • pp.37-44
    • /
    • 2006
  • 지반굴착에 의한 일반적인 흙막이공과 친환경성을 만족시키기 위한 조경 및 보강옹벽 등의 시공을 동시에 적용하게 되면 시공기간이 증가하고, 이에 따른 비용도 커지게 된다. 이러한 단점을 극복하여 흙막이벽과 옹벽구조물의 기능을 동시에 가지는 옹벽겸용 흙막이벽 공법이 제시된 바 있다. 하지만 기존에 제시된 공법은 굴착깊이에 대한 한계성을 가지고 있기 때문에 본 연구에서는 기존 공법을 응용한 설계패턴을 제시하였고, 시공사례를 통하여 응용설계법에 대한 시공성 및 안정성을 평가하였다. 그 결과, 배면의 여유공간이 부족한 현장의 경우 일반적인 흙막이벽이 갖는 말뚝의 변위 및 굴착한계깊이가 다소 해결될 수 있는 공법으로서의 적용이 가능함을 확인할 수 있었다.

  • PDF

다층지반에 근입된 흙막이 벽의 역해석에 관한 연구 (Back Analysis of the Earth Wall in Multi-layered Subgrade)

  • 이승훈;김종민;김수일;장범수
    • 한국지반공학회논문집
    • /
    • 제18권1호
    • /
    • pp.71-78
    • /
    • 2002
  • 본 연구에서는 다층지반에 근입된 흙막이 벽의 단계별 계측변위로부터 각 층의 지반물성을 추정하고 이로부터 차기단계의 거동을 예측하기 위한 역해석 기법을 제안하였다. 지반이 다수의 층으로 구성되어 있을 경우 찾아야 할 대상변수가 많아지게 되며, 대상변수가 많아질수록 역해석에 상당한 무리가 따르게 된다. 이러한 층별 지반물성을 효율적으로 추정하기 위하여 최하단층부터 순차적으로 대상변수들을 찾아가는 방법을 이용하였다. 역해석은 상당량의 반복계산이 필요하기 때문에 정해석 방법으로는 해석시간이 짧고 시공단계 별 해석이 가능한 탄소성보법을 사용하였다. 역해석 대상변수는 탄소성 하중-변위 곡선의 구성요소인 지반반력계수와 수평토압계수들을 취하였으며, 목적함수는 이상변위에 의한 오차를 최소화시키기 위하여 단계별 계측변위 증분과 해석변위 증분의 차이로 구성하였다. 목적함수를 최소화 시키는 대상변수들을 찾기 위한 최적화 수법으로는 제약순차선형계획 법을 이용하였다. 본 연구를 통하여 제안된 방법을 수치해석자료 및 현장계측자료를 이용하여 검증하였다.

드론을 활용한 고정밀 토공량 산출 시스템 개발 및 평가 (Development and Evaluation of High-precision Earth-work Calculating System using Drone Survey)

  • 김세원;김영석
    • 한국지반신소재학회논문집
    • /
    • 제18권4호
    • /
    • pp.87-95
    • /
    • 2019
  • 토공량 산출은 건설현장에서 최적 공사비 산정을 위한 데이터로 정확한 토공량은 토목 공사의 설계 단계에서 시공단계까지 고려되어야 하는 중요한 요소이다. 토공량 산출을 위해서는 정확한 지형 자료와 정밀한 토공 부피 계산이 필요하다. 본 논문에서는 짧은 시간에 정확한 지형 파악이 가능하고, 경제성 측면에서도 장점을 갖는 드론 측량 기술을 이용하여 고정밀 토공량 산출 시스템을 도출하였다. 시스템의 정확도 검증을 위해 현장 검증시험을 수행하였으며, 드론을 이용한 토공량 산출 결과와 GPS 측량 장비를 이용한 토공량을 비교·분석하였다. 또한, 새롭게 개발한 토공량 부피 계산 알고리즘을 기존 항공사진측량 소프트웨어(Pix4D) 계산 방식과 비교하여 정확도를 검증하였다.

3차원 정밀지형자료를 활용한 토공계획 개선 (Earthwork Plan Using the Precise 3D Topographic Data)

  • 이진녕;편무욱;구지희;박재선
    • 대한공간정보학회지
    • /
    • 제18권1호
    • /
    • pp.63-72
    • /
    • 2010
  • 본 연구에서는 단지 설계과정 중 토공사의 효율성을 증진시키고, 토공계획에서 시공에 이르는 연결방안으로 3차원 지형공간기반의 토공모델링에 의한 설계가 가능하도록 토공설계 프로그램을 제작하였다. 토공량 산정시 측량자료를 3차원 격자 DEM을 작성하여 정밀한 토공량 산정을 가능하게 하였고, 이를 기반으로 토공이동과 장비활용이 가능하도록 토적표를 구성하였다. 토공작업에 소요되는 각종 건설장비의 재원을 고려하여 이동토량 및 경로가 표시되도록 하였으며, 공사진행상황파악이 가능하도록 open API 기반의 KML 형식으로 결과를 저장하여 3차원 가시화의 직관적 이해를 높이고 분석 결과의 공유가 용이하도록 제작하였다.