• Title/Summary/Keyword: Earth construction

Search Result 1,220, Processing Time 0.027 seconds

기고문 - 대만(臺灣)이에리우Yehliu 해변에서 본 지진 조산운동(造山運動)으로 형성된 암반(巖盤)과 그 침식작용(侵蝕作用)으로인한 특이지형 경관(景觀)의 붕괴(崩壞)과정 소고(小考)

  • Cho, Kyu-Yeong
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.51
    • /
    • pp.30-43
    • /
    • 2010
  • Yehliu is located at Wanli of Taipei Country with a long cape. Because the rock layer of nearby seashore contains limestone subject to sea erosion, weathering and earth movements, Yehliu is full of seawater-eroded holes as well as numerous rocks in the shape of mushroom, candle, ginger, and chessboard. All these make this 1,700-meter-long cape a geology park with rich ecological resources and a prosperous fishing village. It indicates how the geological features formed by the foundation orogeny and collapsed due to the marine erosion over thousands of years.

  • PDF

REDUCTION OF SEDIMENT-LADEN WATER FROM CONSTRUCITON SITES INTO WATERWAYS:- A GOVERNMENT AND INDUSTRY APPROACH

  • Teo Ee Huat
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.285-291
    • /
    • 2009
  • Water is a strategic resource for Singapore due to its small land mass and more than half of the mainland serves as catchment for raw water, including construction sites. Construction site typically involves earthworks and in conjunction with the frequent and intense rainstorm in Singapore, produce runoff of high turbidity due to suspended sediments. The resulting high concentration of suspended sediment in construction site runoff very often leads to aesthetically unpleasant reservoirs and potentially increases the treatment cost of raw water. To mitigate this, the local standard requires the discharged concentration of total suspended solids of construction runoff leaving a construction site to be less than 50mg/l which is a very high standard. This paper will present, examine and discuss particular issues and practices of Singapore's construction industry in meeting this requirement. The focus will be on two areas: Government lead initiatives and industry practices. How the government agencies worked together with the industry professionals to develop a system to ensure meeting of the standard is discussed. In addition, the types of industry practices, including various Best Management Practice to reduce erosion in construction sites and implement effective sedimentation on construction sites are examined.

  • PDF

Field Performance of Reinforced Earth Wall with Steel Framed-Facing (강재틀 보강토옹벽에 대한 현장 시험시공)

  • Lee, Kwang-Wu;Cho, Sam-Deok;Kim, Ju-Hyong;Seo, Chang-Won
    • Journal of the Korean Geosynthetics Society
    • /
    • v.6 no.4
    • /
    • pp.39-48
    • /
    • 2007
  • This paper introduces a recently developed reinforced earth wall system with steel framed-facing. The new system incorporates a steel-framed facing that might be assembled on-site and steel strip or geogrid type reinforcements for backfill area. In order to enhance scenery view design of the wall construction, dual-structured facing is proposed in which room for planting space locates in the front of facing. A reinforced earth walls using the proposed system was constructed to verify constructability of the proposed system and facing movement and tensile characteristics of reinforcement were measured to understand the mechanical behavior.

  • PDF

A Case Study of Extra Reinforcement by Road Extension work on Existing Cut Slope Reinforced with Counterweight Fill and Stabilizing Piles (압성토 및 억지말뚝으로 보강된 도로의 확장공사로 인한 추가 보강사례 연구)

  • Park, Jeong-Yong;Kim, Woo-Seong;Kim, Jae-Kyoung;Yang, Tae-Sun;Na, Kyung-Joon
    • Journal of Korean Society of societal Security
    • /
    • v.1 no.2
    • /
    • pp.67-72
    • /
    • 2008
  • To confirm the stability of a cut slope in the road extension construction site, several investigations were carried out and countermeasures of slope was studied. This paper describes a study of design case of extra reinforcement on existing cut slope reinforced by preloading and piles in roads. To investigate the effect of stabilizing piles installed in a cut slope, an instrumentation system also designed, was. As a result that the stabilizing file and earth anchor are considered as the extra reinforcement, both stabilizing pile and earth anchor guarantee the stability of cut slope. However, stabilizing pile is selected in aspects of economy and continuity to the existing cut slop reinforcement including counterweight fill and stabilizing piles.

  • PDF

Groundwater Investigation of the Cheonggyecheon Watershed Area

  • Choi, Doo-Hyung;Yang, Jea-Ha;Jun, Sung-Chun;Lee, Kang-Keun;Kim, Yoon-Young
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2004.04a
    • /
    • pp.323-327
    • /
    • 2004
  • The groundwater system of the Cheonggyecheon watershed is very complicated because it is influenced by many factors such as pumping out, groundwater leakages into subway stations, civil use of groundwater, and leaking water from water supply and sewage lines. So the characterization and evaluation of tile groundwater flow and contaminant transport in the Cheonggyecheon water system is quite a difficult task. The purpose of this study is to analyze of the influence to the 'groundwater' below the Cheonggyecheon watershed by the 'surface water' on the Cheonggyecheon stream after the restoration. We have so far collected groundwater quality data, hydrogeologic aquifer parameters, and tile amount of leakages into subway stations and its influence on the groundwater system of the Cheonggyecheon. Results show that groundwater level was influenced by the direction and depth of a 녀bway station. This study will continue to monitor groundwater quality, a water level fluctuation relation between rainfall and groundwater recharge for further investigation of the groundwater flow system in Cheonggyecheon.

  • PDF

A Study on the Earth-work Volume Calculation for Route Alignment of Highway (도로선형의 결정에서 토공량 산정에 관한 연구)

  • 최재화;이석배;심정민
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.11 no.2
    • /
    • pp.89-100
    • /
    • 1993
  • This paper is a study on the earth volume calculation using CAD and LISP(LIST Processing) in the route alignment. The utility enlargement in the industry field and the considerable progress of computer make the automatic design and manufacture for the development of CAD/CAM/CAE technique possible, and the automatic design of civil engineering works is continuously progressive. In this study we are intend to improve an effect of civil engineering work by the automatic earth volume calculation in route alignment. This paper aims to construct the automatic design system of civil engineering work and the procedures; (1) The programming of the self-scanning program of the land information introducing Digital Terrain Model concept in the map (2) Systematic algorithm construction using LISP and grafting CAD system (3) Automatic design and calculation of the mass curve and earth volume.

  • PDF

Earth Retaining Structure Using a Row of piles during Shallow Excavation in Soft Clay (연약점성토지반의 얕은 굴착시 줄말뚝을 이용한 흙막이공)

  • 홍원표;윤종민;송영식
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.1
    • /
    • pp.191-201
    • /
    • 2000
  • In this study, the earth retaining structure using a row of piles considering plastic flow of the ground is suggested for shallow excavation works instead of conventional anchored sheet-pile wall method in the marine clays with high groundwater level. The behavior of the earth retaining structure using a row of piles is precisely observed during excavation by inclinometer and piezometer installed in opposite to the excavation side. As a result of field measurement, it was found that the behaviors of the piles and the soil were influenced mainly by slope of excavation face, interval ratio of piles, fixity condition of pile head, and stability number, etc. The earth retaining structure using a row of piles is ascertained for workability, stability, and economical construction on the soft ground having no adjacent structures.

  • PDF

Groundwater system Investigation of the Cheonggyecheon watershed Area

  • Choi, Doo-Hyung;Yang, Jae-Ha;Jun, Seong-Chun;Lee, Kang-Keun;Kim, Yoon-Young
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2004.09a
    • /
    • pp.326-329
    • /
    • 2004
  • The groundwater system of the Cheonggyecheon watershed is very complicated because it is influenced by many factors such as pumping out, groundwater leakages into subway stations, civil use of groundwater, and leaking water from water supply and sewage lines. So the characterization and evaluation of the groundwater flow and contaminant transport in the Cheonggyecheon water system is quite a difficult task. The purpose of this study is to analyze the influence on the‘groundwater’ below the Cheonggyecheon watershed by the‘maintenance water’on the Cheonggyecheon stream after the restoration. We have so far collected groundwater quality data, hydrogeologic aquifer parameters, and the amount of leakages into subway stations and its influence on the groundwater system. Results show that groundwater level was influenced by the direction and depth of subway tunnel. This study will continue to monitor groundwater quality, a water level fluctuation relation between rainfall and groundwater recharge for further investigation of the groundwater flow system in the Cheonggyecheon watershed.

  • PDF

Application of electrical leakage detection method for waste landfill (매립지 누출위치 실시간 파악을 위한 전극검지법의 적용 사례)

  • Han, Sang-Jae;Kim, Byung-Il;Hong, Kang-Han;Jung, Jae-Hyun;Kim, Soo-Sam
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.798-804
    • /
    • 2009
  • Damaged liners may be detected by using leakage detection systems. For the reason, many types of leakage detection systems are applied to analyze or detect damages of lining system such as electrical detection method for the landfill sites. However, most of them can be applied in the new landfill construction sites because sensors should be installed in the bottom of liner systems. This paper shows a case study reviewing the development of a fence type leakage detection method, monitoring system and pilot plant test results, so that they can be economically and efficiently applied to actual used or in-use sites without a leakage detection system.

  • PDF

Construction of an Earth's Field Compensation System for the Mcasurement of. Proton Gyromagnetic Ratio (양성자 자기회전비율 측정을 위한 지자장 상쇄장치 제작)

  • 우병칠;박포규;김철기;유권상;김창석
    • Journal of the Korean Magnetics Society
    • /
    • v.2 no.2
    • /
    • pp.156-162
    • /
    • 1992
  • In the measurement of proton gyromagnetic ratio by a low field cechnique, the compensation of earth's field is required to keep a zero-field space. The constant earth's fild is compensated by a cur-rent flowing through a Helmholtz coil, whereas small time-varying component is compensated automatically by a closed loop of feedback system. A feedback amplifier, and two three-dimensional Helmholtz coils having the same coil constant have been constructed in order to compensate the earth's field. field. Preliminary test performed at the ordinary laboratory showed that the time-vary-ing field of ${\pm}100nT$ and the constant field have been reduced to the level of ${\pm}10nT$ using the compensating system.

  • PDF