The Korean environmental impact assessment(EIA) system, and explored ways to improve it as a more efficient and viable institution relevant to the demand of our time and conditions in study. The first problem this study identified is found in the fact that the party to write up the assessment report is itself the business operator or the one who is planning to work out the business plan. This structure translates into placing an order with an agent for EIA report. The reporting job may br subcontracted to the agent at a cost far below the rate specified in the 'Standard for Estimate of Agency Fee for Environmental Impact Assessment.' This practice also causes the vicious circle of producing a report that is written to justify the project or business in question or it leads to rough-and ready and poor documentation to minimize the time required. Second, in order to achieve the goal of the plan or business, which is the target of EIA, the local residents tend to ve regarded as an obstacle. This means elimination of the local people from participating in the EIA or their opinion being frequently ignored. This is the seed of distrust and hostility that sometimes provoke disagreements or fierce conflicts. The first proposal to improve these problem is to improve the factors that cause poor documentation of the assessment report as well as improve the understanding of the EIA system. This study proposes the following measures for improvement. The agency cost for EIA should be paid by the business operator or a third party that can ensure faithful implementation of the payment. A system should be established to verify transparent estimation of the agency cost. In order to enhance the professional quality of EIA agents, there should be implementation of qualification test for industrial engineer of related engineers in addition to the current EIA Qualification Test. The second proposal for improvement is to improve the citizen participation process by instituting a legal framework to make clear the purpose of the briefing session for local residents, which is held as a procedure of EIA, and to ensure more positive publicity during the stage of listening to the opinion of the local community. For a smooth and rational communication process, a moderator and a communicator of opinion, as is the case in a public hearing, could be instituted to clearly get the purpose of the briefing session across to the residents and to help to carry out the explanation and Q & A sessions according to the categories of the opinion of the residents. At present, the notification of the public inspection of the draft of the assessment report and briefing session for the residents is made on the newspaper and internet network. But some people have difficulty with access to this method of announcement. A higher participation rate could be secured if a legal provision is added to specify putting up placards in specific places such as the entrance to the place for the briefing session for residents or the building of administrative agencies of the area concerned.
Increasing concern for the environment in Korea has led to the demand that major policies and large-scale development projects be subjected to detailed impact assessment. This paper reports on the state of data related to the prediction of the environmental impact (EIA) to emphasize the importance of data quality. Environmental impact statements (EIS) consulted with the Ministry of Environment of Korea were analyzed from 1981 through 1992. Many of assessors used existing data and collected supplementary data from field survey. Most of the results of EIA are presented directly or summarized on maps and as graphics. For the national purpose, large source of quality-controlled data such as atmospheric data have been developed, However, there are the deficiency in data to analyze the impact of human activity, and data gaps and incompatibilities among systems. Consequently, the development of data bank systems including computer database and remotely-sensed satellite data is required to improve the quality of data which are relevant to EIA. The data bank system should be organized meaningfully in minimum time with a least cost, and measurement standards must be made explicit. Geographical information systems (GIS) are applicable to the graphic presentation or to the impact prediction model.
Jeju Special Self-Governing Province has implemented a self-governing environmental impact assessment system (Jeju-EIAS) in recognition of its autonomy. In this study, the institutional features of Jeju-EIAS were examined by analyzing the development projects whose consultation under Jeju-EIAS were completed from 1994 to 2019. The consultation procedure of Jeju-EIAS, such as the actual operation of Review Committee for Environmental Impact Assessment (EIA), the consent of the provincial council, and the regular follow-up activities for the implementation of EIA consultations, has been implemented differently from those of other metropolitan cities and provinces. Under Jeju-EIAS, types of development projects subject to consultation on EIA also take into account local conditions, and include the construction of aquarium basin and building. In addition, provisions concerning the scale of development projects is strengthened above the Korean Environmental Impact Assessment Act (EIA Act).
Environmental Impact Assessment (EIA) is composed of various procedures, such as screening, scoping, inventory survey, prediction, assessment, alternative assessment, mitigation measures, and post management. Environmental monitoring data for air quality or water quality, etc. is applied in the EIA process, especially in prediction and post management. As an effective tool of environmental monitoring, the remote sensing method, introduced recently, was used in collecting nationwide data concerning ecosystem and land use. This article explains the current monitoring status in Korea. Monitoring factors include air quality, water quality, soil, ocean, odor, noise, and ecosystems. This report explains the organization of the environmental monitoring system managed by the Ministry of Environment in Korea. Furthermore, it shows the environmental criteria and environmental policies applied to EIA in Korea.
The Korea Environmental Impact Assessment (EIA) system was introduced in 1977 through the Environmental Conservation Act. It has progressed through many laws and regulations promoting the balance between development and conservation, and functioning as a Preventitive environmental policy. Despite the efforts to minimize environmental damage from development and to uplift social awareness of environmental preservation, deficient impartiality and objectivity in completing and investigating environmental assessments, there have continously existed conflicts among related stakeholder, neglecting arrangements and ineffectiveness of public participation. This research present EIA obstacles and analyzes the overall status of the EIA through surveys from related experts. On the basis of this research, the actual complications regarding the developer, public participation, examiner and consultant are brought about. Also, remedies are proposed to ensure effective EIAs and restore confidence in them.
EIA-709.1 Control Network Protocol is the basic protocol of LonWorks systems that is emerg-ing as a fieldbus device. In this paper the protocol is implemented by using VHDL with FPGA and C program on an Intel 8051 processor. The protocol from the physical layer to the network layer of EIA-709.1 is im-plemented in a hardware level,. So it decreases the load of the CPU for implementing the protocol. We verify the commercial feasibility of the hardware through the communication test with Neuron Chip. based on EIA-709.1 protocol which is used in industrial fields. The developed protocol based on FPGA becomes one of IP can be applicable to various industrial field because it is implemented by VHDL.
The total pollution load management system of watershed has been implemented upon Special Law pertaining to the Han River Watershed Water Quality Improvement and Residents Support, Special Law pertaining to the Nakdong River Watershed Water Management and Residents Support, Special Law pertaining to the Youngsan River Watershed Water Management and Residents Support, and Special Law pertaining to the Seomjin River Watershed Water Management and Residents Support in Korea since 2002. But many other similar systems with total pollution load management system of watershed are being operated separately or independently, even though its purpose is nearly same with those of the total maximum pollutants load management in Law on Water Quality Environmental Protection, environmental impact assessment(EIA) in Law of Impact Assessment on Environment, Transportation and Disaster and Pre-environmental assessment of Environmental Policy Act. Therefore the contents of total pollution load management system of watershed and many other related systems could be overlapped and at some times have inconsistency among them. This study suggests first the integrated operation of total pollution load management system of watershed, EIA, pre-environmental assessment, urban planning, and sewage planning and secondly EIA system development by integration of EIA and pre-environmental assessment and strategic environmental assessment(SEA).
Natural disturbance and environmental pressure on natural ecosystems are gradually increasing, and the cause is significantly related to large-scale environmental pollution, global warming, decreasing biodiversity and habitat fragmentation. Environmental impact assessment(EIA) in Korea has been focused on distribution and composition of fauna and flora as major evaluation aspects in ecosystem assessment. It is well known that those characteristics of flora and fauna strongly depend on characteristics and quality of habitat and ecosystem. However, there is no items to assess habitat and ecosystems of spatial ecological system in EIA. Many countries are trying to develop the EIA items to consider the spatial characteristics of habitat and ecosystem and those ecological dynamics as well as species level. In this stream, landscape ecology is emerging discipline to examine spatial pattern and ecological process within/between habitats and ecosystems. Landscape ecological analysis, as a special tool for ecosystem evaluation, has been appropriately adopted to the EIA system in the advanced countries. This review paper tries to introducing the possibilities of landscape ecological concept into the Korean EIA system.
To improve animal production, a simple and accurate pregnancy diagnosis plays a very important role. Therefore, the purpose of this study was to develop an on-farm blood progesterone enzyme immunoassay (EIA) system for monitoring the early pregnancy in sows. Star tubes coated with mouse monoclonal anti-progesterone antibody were used for this proposed EIA system which was tested in field trials. The results could be obtained within 30 minutes either by spectrophotometry or the naked eye. Heparinized fresh blood samples collected from the ear vein of sows 17-22 days after breeding (day 0) were tested qualitatively to diagnose sows as pregnant or non-pregnant with high ( > 3 ng/ml) or low ($${{\leq_-}}3ng/ml$$) progesterone in the blood. To provided a double check data, plasma progesterone levels were also measured quantitatively by the same EIA system with some modification. Total agreement of diagnosis by the on-farm EIA kit and by farrowing or abortion from 128 tested sows was found to be 92.2% accuracy (93.1% on pregnant diagnosis and 83.3% on non-pregnant diagnosis). It was concluded that the on-farm EIA blood progesterone test is a very useful method for monitoring the early pregnancy status of sows.
After the Rio declaration on environment and development in 1992, developed countries are undertaking "environmentally sustainable transportation (EST)" projects. To meet the needs for EST, current transportation policies in Korea are rapidly reforming and one of its concerns is modernizing and upgrading railway freight system. Planning new railroad construction projects is increasing and subsequent environmental impact assessment (EIA) demands improvements, especially in both the EIA and decision making systems. In this paper, we discuss the present status of EIA for railroad construction projects, especially, by analyzing the EIA documents for the last six years. The EIA for railroad construction projects accounts for only 4.9% of total 918 project EIAs during 1998-2003, and the portion is gradually increasing. Major environmental concerns for EIA in railroad construction projects were geomorphological and ecological changes, protection of rare organisms, air pollution, water pollution, waste management, and noise, etc. We compared characteristics of environmental impacts of railroad construction with those of vehicle road construction, based on environmental and construction-planning indicators appeared in Environmental Impact Statements. Railroad construction usually requires longer tunnels and bridges for a given length than those for vehicle road construction. In addition, the amounts of geomorphological and ecological changes (road-cutting, embankment, devegetation, etc.) in railroad construction were generally less than 50% of those in vehicle road construction. To develop environmentally friendly railway systems, monitoring studies for environmental impacts of railroads such as habitat fragmentation and road kills, dispersal of alien plants, tunnelling effects on groundwater and vegetation, and noise impacts are highly recommended.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.