DEVELOPMENT AND APPLICATION OF SUBSTRUCTURE NON SUPPORTING FORMWORK FOR TOP-DOWN CONSTRUCTION

  • Mee-Ra Jeong;Hong-Chul Rhim;Doo-Hyun Kang;Kwang-Jun Yoo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.788-793
    • /
    • 2009
  • Constructing substructures by using Top-Down or Downward method needs an efficient formwork system because of difficulties in supporting concrete slabs from the bottom while excavation is in process. Existing underground formwork systems can be classified by three types: graded ground supported type (Slab On Grade, Beam On Grade), suspension type (Non Supporting Top Down Method), and bracket supported type (Bracket Supported R/C Downward). Each method has its own advantages and limits. Application of a specific formwork system for a given construction site is determined by various conditions and affect construction time and cost. This paper presents a newly developed underground non-supporting formwork system, which combines the advantages of a suspension type and a bracket supported type while it overcomes limits of two types. The developed system has a moving formwork which is supported by suspension cables hanging from the bracket placed at the top of pre-installed substructure columns. Then, the moving formwork is repeatedly lowered down for the next floor below to support concrete slab during curing. The details of this bracket and cable supported system have been investigated for the improvement of easiness in construction.

  • PDF

Non-Supporting Form System for Top-Down Construction (지하 역타 공법용 상·하 분리형 무지주 지지체 개발)

  • Jeong, Mee-Ra;Rhim, Hong-Chul;Yom, Kyong-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.27-30
    • /
    • 2008
  • For the purpose of developing economical and time-efficient formwork for Top-down construction, a Non-Supporting Form System has been proposed. The system is consisted of two parts: a hanging part to support a steel frame and a section of concrete slab, and the other hanging part to lower the steel frame. In this paper, the proposed system is compared to two existing systems of Non Supporting Top-down Method and Bracket Supported R/C Downward Method. It is expected that this system can be used in Top-down construction with further development.

  • PDF

Characteristics and Applicability of CWS(Continuous Wall System)II Method (CWS(Continuous Wall System)II 공법의 특성 및 적용성)

  • Lim, In-sig;Lee, Jeong-bae;Kim, Jae-dong;Lee, Jai-ho;Woo, Sung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.43-47
    • /
    • 2008
  • CWSII method was developed to overcome the problems of frequent occurrence in the application of existing downward construction methods, especially in the case of using slurry wall instead of SCW or CIP as a retaining wall. By the improvements in connecting steel beams with the wall, CWSII method is able to ensure the settlement of a steel beam and the diaphragm effect of a slab while reducing the degree of difficulty and the term of works and the cost of construction. As the desired results, CWS method can be applied as a practical downward construction method regardless of the type of retaining wall. In this paper, besides the concept and features of CWSII method, it can be seen that the method can provide reliable and economical performances by comparing with existing methods.

  • PDF

Downward Method of Underground Structures (지하구조물 역타공법 PRD공정이 삭제된 대안공법 제시)

  • Lee, Wang-Hee;Lee, Il-Jae;Iim, Si-Nae;Maeng, Eun-Ju;Jeong, Uhk-Sung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.4-7
    • /
    • 2013
  • In recent downtown high land due to an increase in the utilization of land from the property line to maximize the proximity of the construction and use of underground structures has increased. The nature of urban underground retaining structure construction safety, environmental management, and civil contrast situations, construction periodt perspective, this method is widely used in the backhand. Recent Patents DP method and the method of the DBS method than in the SPS process is deleted according to the PRD process cost savings are generated. The workability and safety study of two kinds of method, such as air speed, and considering the reduction of indirect costs in terms of economic efficiency is considered to be a superior method.

  • PDF

Downward Method of H-PILE Alternative Materials of Percusion Rotary Drill (PRD시공시 H-PILE 대체 자재로 원가절감 할수 있는 공법 사례)

  • Lee, Wang-Hee;Lee, Il-Jae;Iim, Si-Nae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.199-202
    • /
    • 2014
  • In recent years the downtown, Top-down method has been applied in a major method to solve the complaints due to noise, vibration, dust and safety issues such as cracking due to settlement when the excavation close to the building. Until it is installed underground permanent foundation, the Pre-founded Column is a pile foundation as well as a column to bear the upper construction load. The Pre-founded Column is constructed by PRD method generally. The EnP(Enlarging Pile) method can be expanded locally boring diameter of the embedment zone as compared to the PRD method existing general. Since the bearing capacity is increased by the boring diameter is expanded, the embedment length is reduced, the construction cost is reduced.

  • PDF

A Study on the Stability and Behavior of upward Soil-nailing (상향으로 설치된 쏘일네일링의 안정성 및 거동에 관한 연구)

  • Kim, Jae-Yoon;Lee, In;Choi, Geun-Hyeok;Kim, Hong-Taek
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.1086-1091
    • /
    • 2009
  • The purpose of this study is to provide the technical information of the stability change and behaviour characteristics in case upward direction of soil nailing is installed. Generally, the soil nailing which installed in case of vertical excavation or for the purpose of the slope stability is installed between 5 to 15 degree of downward direction. The downward direction of the soil nailing method has lots of advantages such as the increase of the stability, the convenience of the grout compared to upward direction of soil nailing. Even though the upward direction of the soil nailing has the disadvantages in terms of the stability and the grout construction, horizontal displacement tends to be decreased.

  • PDF

A Basic Study on the Analysis of Construction Accident Statistics Data (건설안전사고 통계데이터 분석에 관한 기초연구)

  • Park, Hwan-Pyo;Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.122-123
    • /
    • 2018
  • Although the disaster rate of the industry as a whole is on a downward trend, the disaster rate of the construction industry is on an ongoing trend. Therefore, in this study, we analyzed safety accident statistical data of the construction site over the past three years. As a result of the analysis, the incidence of disasters at small construction sites was very high. And the proportion of disaster occurred for workers who worked in less than 6 months even roughly 92.6%. In addition, as a result of analyzing the form of disaster occurrence, the crash was 34.1% and the fall was 15.1%. The analysis results of these construction safety accidents are to provide as a basic material for developing a policy that can prevent safety accidents and a safety accident prediction model.

  • PDF

Present Condition and Development of Mechanical Utility System for Modular Construction (모듈러 건축용 기계설비 시스템 현황 및 개발에 관한 연구)

  • Lee, Jae-Soo;Choi, Jun-Sok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.19-20
    • /
    • 2016
  • Domestic construction industry has experienced many difficulties as it has been on a downward. It's a way that active modular structure market to solve this problem. However, as Modular structure technical standard in Korea is in the early stages, our modular factory maufactured rate is almost 40% lower than overseas. Besides, there is less design diversity so it just applies for a few buildings like low-rise building and general group barrackes. To deal with these problems, it is essential to modulating the equipment which can improve the production rate. This will help to ensure the quality, shortening of the construction period, the reduction of labor costs. We have defined the name of segmented by each installation location of the equipment to modulating equipment. And it was examined the suitability of the modulating of the location-specific utility system. The results of the analysis are discussed on the page.

  • PDF

Analysis of the Amount of Construction and Demolition Waste Generated by Underground Vertical Extension Methods (지하수직증축공법 적용에 따른 건설폐기물 발생량 분석)

  • Won, Jongsung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.273-274
    • /
    • 2021
  • This paper proposes a process to calculate the amount of construction and demolition (C&D) of underground vertical extension methods through considering the characteristics of used construction and demolished materials. The underground vertical extension methods analyzed in this paper were the bottom-up, normal top-down, and top-down methods with multi-post downward (MPD). In order to check the applicability of the proposed process, 24 illustrative examples were generated. The amount of C&D waste of the illustrative examples were calculated and compared. As the results, the top-down method with MPD was the most efficient method to reduce the amount of C&D waste.

  • PDF

Analysis of the Changes in the Perceived Important Capabilities of Construction Project Managers after the Global Financial Crisis

  • Lee, Na-Kyung;Bae, Ju-Lee;Jang, Hyoun-Seung
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.8-16
    • /
    • 2012
  • After the 2008 global financial crisis, the construction environment in South Korea continued change in the construction environment. Construction orders in 2011 have shown a downward trend compared with the previous year. Along with these changes in the construction market, the professional capabilities of construction project managers that are perceived as important also changed after the global financial crisis. Accordingly, this study was conducted to identify the major business capabilities of the current construction project managers and to determine which of these capabilities have undergone changes in terms of the importance accorded to them after the global financial crisis, and ultimately, to derive the construction project manager capability areas that need to be strengthened according to the changes in the construction environment. The capabilities of construction project managers were surveyed at two different time points: in 2007 and in 2010. The results show that the year 2010, after the global financial crisis, an increase in the perceived important capabilities of construction project managers compared with 2007. This results the impact of the changes in the construction environment on the importance of construction project managers. This study derived the ramifications of the early identification of systems and prospects according to the changes in the construction circumstances on more efficient onsite and human resources management, by considering the appropriate capabilities of the construction project managers.