• Title/Summary/Keyword: Downtown Construction

Search Result 190, Processing Time 0.034 seconds

A Study on the Reduction Plan of Dust Dispersion at Small-Scale Construction Sites in Downtown Seoul (서울 도심지 내 소규모 공사현장 비산먼지 감소방안에 관한 연구)

  • Cho, Jeong Gyu;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.6
    • /
    • pp.745-750
    • /
    • 2021
  • As public concern for fine dust has increased, so too has the interest in fugitive dust. Fugitive dust generated at construction sites, which is then scattered by vehicles moving around the sites, accounts for a significant portion. Small construction sites, which comprise the majority of construction sites, are often not adequately managed, because there are no regulations on fugitive dust for such sites. Therefore, in this study, in order to contribute to the establishment of fugitive dust management regulations on small-scale construction sites and to prepare measures to reduce fugitive dust, we measured and analyzed fugitive dust generated at small-scale building sites in Seoul. The fluctuations of fugitive dust generated at small-scale sites over time were checked, and the relatively low concentration when measured behind fences and railings suggested that fence installation is an appropriate method of reducing fugitive dust.

Interior Design Process for Food & Beverage Facilities of a City Hotel (호텔 식음료공간의 디자인과정에서 영업성 검토에 관한 연구 - N 호텔의 사례를 중심으로-)

  • 김정근
    • Korean Institute of Interior Design Journal
    • /
    • no.1
    • /
    • pp.39-45
    • /
    • 1992
  • Today the design is recognized as indispensible part in business activities and it is demanded as one of the management strategies. since the ultimate goal of a hotel lines in the pursuit of profit, it is important that the design of a hotel faithfuly reflects the demands of management at the time of its construction planning. Furthermore, hotel planning undergoes a complicated design phases on a large scale, thus, utilization of a design process that accomodates retional approaches scientific and structural design activities, which will further reduce errors in design steps and pave a way for effective attainment of the target. Especially the management and designers review and confirm the design in relation to the strategic manegiable objective sat the early basic stage. The baseline set here will serve as a direction for the detailed design. In this context, this thesis formulates a reference baseline in dividing the space in view of the overall profitability and is based upon a survey conducted on the correlation between the operation of food and beverage section and the space. First, downtown hotels now take on the role of a public facility to a great extent and the number of Koreans who visit the autxiliary facilities of hotel increases. Second, recently revenue from a food and beverage section is in downtown and the trend is especially obrious at western restaurant, buffet and bar. This necessitates the reevaluation of the business space allocation. Third, sales promotion plan includes diversification, dessection and scaling down of the food and beverage section areas, Fourth, a proper number of seats must be determined in regard to the average area of one seat shown in the survey. Fifth, dense seat arrangement would entail a curtailment rather than a hike in revenue. Sixth, the installation of private dining room is on the rise and in particular, in Japanese and Chinese restaurants. Seventh, business space with declined revenue tends to induce the integration of similar businesses.

  • PDF

Downtown Area Cadastral Boundary Surveying Using Real-time GPS/GLONASS Combination

  • Seo, Dong-Ju;Kim, Sung-Hwan;Lee, Jong-Chool
    • Korean Journal of Geomatics
    • /
    • v.3 no.1
    • /
    • pp.73-79
    • /
    • 2003
  • To manage national territory and cadastral data efficiently, accuracy and cost-efficiency in cadastral boundary surveying is inevitable. The efficient management of cadastral data is a very important element in national land management. Survey techniques are being introduced. Recently, improvements in survey techniques have been made with the development of satellite surveying, Allowing accurate and fast surveys. If we can calculate the output accurately in real-time in survey fields, it will open a new method in cadastral detail surveying. According to the classification on Law of cadastral surveying, Cadastral surveying can be divided into cadastral control point surveying and cadastral detail surveying. The control point survey can be divided into cadastral triangulation surveying and cadastral traverse surveying. The detailed survey is usually perform by plane surveying. Among these, cadastral detail surveying will be reviewed in this study. In this study, the combination of the satellites, such as US managed GPS and Russian managed GLONASS was used. In the satellite survey in downtown, data interruption symptoms arose(according to the mask angle of the satellite). Therefore; we combined the satellites to get date more accurately. A block of Haewoondae New City in Busan, Korea, which has Numerical Cadastral Law was selected as the sample area for this study. Block II and III are surrounded by high rise apartments. One side of Block I and IV is level ground and the other side is full of high rise apartments. Especially, Block II is surrounded by high rise apartment houses with 20 meters width. In the results of the study Block II did not satisfy the allowable precision, while Block I, II and IV satisfied the allowable precision of the enforcement regulations of Cadastral Law. Therefore, it is judged that the traditionally used Total Station method should be used for supplementary survey on Block II, in stead.

  • PDF

A System of Guiding Path for Parking Lots based on RFID to Consider Real-time Constraints (실시간 제약을 고려한 RFID 기반 주차 경로 안내 시스템)

  • Kang, Ku-An;Kim, Jin-Deog
    • Spatial Information Research
    • /
    • v.16 no.1
    • /
    • pp.65-77
    • /
    • 2008
  • There have been many studies and technologies that define a current location of a moving vehicle with GPS(Global Positioning System). However, the navigation system with GPS has troubles to search an optimized route considering data such as realtime parking status and road conditions. Moreover, the GPS systems show malfunction in the downtown with very tall buildings, underground parking lot and the inside of buildings. On the contrary, the RFID systems are able to reflect real-time status of parking lots and roads in the downtown. This paper proposes a system of guiding path for parking lots to consider real-time constraints based on RFID. The results obtained from the implemented system show smooth guiding of a new route after immediately sensoring the change of the information of parking lots and roads: if a parking lot that a vehicle is heading to is fully occupied, the system re-searches a new route for a neighbor parking lot and immediately transfers it to customer's mobile, and if the designated route is under construction, the system guides a detour path. The proposed method will be useful for advanced integrated parking control system.

  • PDF

A Case Study on the Top-Down Methods Performed in the Excavation Works of Domestic Downtown (국내 도심지 굴착공사에 적용된 Top-Down 공법의 시공사례 연구)

  • Chung, Jeeseung;Park, Sukk
    • Journal of the Korean GEO-environmental Society
    • /
    • v.18 no.2
    • /
    • pp.5-19
    • /
    • 2017
  • Underground excavation for building construction in Korea is changing from conventional support method (Strut, Ground anchor) to inside permanent support method by stability, economic, circumstances around excavation and etc. This study was selected the sites of Top-down, New Top-down, S.P.S, S.T.D and B.R.D in general use. This study was compared and analyzed a construction cost and period between aforementioned methods and conventional support method. Also, this study was confirmed the stability of temporary retaining wall by analysis for measurement data under construction. As a result, this study can grasp that most improved permanent support method is excellent in economic and constructability than conventional support method in case of deep excavation and rapid appearance of bedrock.

Field Application of the Difference of Setting Time of Improving Super Retarding Agent of Foundation Mat Mass Concrete (기초매트 매스 콘크리트의 초지연제를 활용한 응결시간차공법의 현장적용)

  • Noh, Sang-Kyun;Baek, Dae-Hyun;Kwon, Hae-Won;Bae, Yeoun-Ki;Chung, Sung-Jin;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.57-60
    • /
    • 2008
  • According to the recent tendency that the buildings in the downtown concerning rising land prices and efficient use of building are gradually Manhattanized mainly the grand scaled residential buildings, structure of the buildings relates to safety and so the very thick mat concrete is selected as the foundation of architectures. Because mat concretes can not be simultaneously pour in a great quantity due to the circumstance at the field, not only the questions on the unification between the concretes pour on the upper layer and the lower layer are presented but also the cracks by the internal force from the difference of hydration exothermic period are occurred because of the time lag. Thus, this study checked the efficiency to apply "The hydration heat controlling method of mass concrete for horizontal partition pouring construction" to the skyscraper sites under construction at Haiundai in Busan. After applying this method, the result of observation that the cracks by hydration heat in all over the placement surface did never be founded. Also, in case of the economic analysis that the hydration heat reduction method using super retarding agent by difference of setting time is approximately 80% cheaper than the hydration heat reduction method by pipe cooling in the construction expenses.

  • PDF

Assessing the Effect of Water and Heat Cycle of Green Roof System using Distributed Hydrological Model in Urban Area (분포형 수문모형을 이용한 도시지역 옥상녹화에 따른 물 및 열순환 영향 평가)

  • Jang, Cheol Hee;Kim, Hyeon Jun;Kim, Yeon Mee;Nam, Mi A
    • KIEAE Journal
    • /
    • v.13 no.4
    • /
    • pp.33-41
    • /
    • 2013
  • The impervious area on the surface of urban area has been increased as buildings and artificial land cover have continually been increased. Urban development has gradually decreased the green zone in downtown and alienated the city from the natural environment on outskirt area devastating the natural ecosystem. There arise the environmental problems to urban area including urban heat island phenomenon, urban flood, air pollution and urban desertification. As one of urban plans to solve such problems, green roof system is attracting attentions. The purpose of this study was to investigate flood discharge and heat reduction effect according to the green roof system and to quantify effect by analyzing through simulation water and heat cycle before and after green roof system. For the analysis, Distributed hydrologic model, WEP (Water and Energy transfer Processes) and WEP+ model were used. WEP was developed by Dr. Jia, the Public Works Research Institute in Japan (Jia et al., 2005), which can simulate water and heat cycle of an urban area with complex land uses including calculation of spatial and temporal distributions of water and heat cycle components. The WEP+ is a visualization and analysis system for the WEP model developed by Korea Institute of Construction Technology (KICT).

Numerical analysis study of reinforced method (loop type) at the double-deck tunnel junction (복층터널 분기부에서의 보강공법(루프형 강선)에 따른 수치해석 연구)

  • Lee, Seok Jin;Park, Skhan;Lee, Jun Ho;Jin, Hyun Sik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.5
    • /
    • pp.823-837
    • /
    • 2018
  • Congestion of the city with the rapid industrial development was accelerated to build complex social infrastructure. And numerous structures have been designed and constructed in accordance with these requirements. Recently, to solve complex urban traffic, many researches of large-diameter tunnel under construction downtown are in progress. The large-diameter tunnel has been developed with a versatile double-deck of deep depth tunnel. For the safe tunnel construction, ground reinforcement methods have been developed in the weakened pillar section like as junction of tunnel. This paper focuses on evaluation of the effects of new developed ground reinforcement methods in double-deck junction. The values of reinforcement determined from the existing and developed methods were compared to each other by numerical simulation.

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.

A Case Study on the Ground Reinforcement Method and Effect of the Failed Tunnel (터널붕괴지반의 보강공법 및 효과에 대한 사례연구)

  • Cho, Hyun;Lim, Jae-Seung;Chung, Yoon-Young;Choi, Sang-Yeul
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.293-300
    • /
    • 1999
  • The maintenance for the stability of tunnel, especially on downtown area, careful check must be considered during construction stage and after. Moreover we have to achieve the stability of tunnel by ground improvement and reinforcement when ground condition is bad or tunnel failures under the various ground conditions. In this paper, it is presented the case of tunnel failure and the state of restoration by ground reinforcements at seoul subway $\bigcirc$-$\bigcirc$ construction site. For the purpose of ground reinforcement, first, curtain wall was established by chemical grouting. Secondly, cement milk grouting was carried by upper part of tunnel crown. Also Boreholes loading test and tunnel monitoring were carried by in failure site for the long term stability of tunnel.

  • PDF