A Study on the Renaissance/Baroque Characteristics Appearing in Contemporary Architecture - Focused on the Analysis of National Museum of Modern and Contemporary Art Seoul Branch and Dongdaemun Design Plaza from the Concept Frame of Wölffrin - (현대건축에 나타난 르네상스적/바로크적 특성에 관한 연구 - 뵐플린의 개념틀에 의한 국립현대미술관 서울관과 동대문디자인플라자의 비교분석을 중심으로 -)

  • Kim, In-sung
    • Korean Institute of Interior Design Journal
    • /
    • v.26 no.1
    • /
    • pp.142-152
    • /
    • 2017
  • This study investigated Renaissance and Baroque architectural characteristics found in contemporary public buildings in Seoul, which are National Museum of Modern and Contemporary Art Seoul Branch(MMCA) and Dongdaemun Design Plaza(DDP). Among H. $W{\ddot{o}}lfflin^{\prime}s$ five categories for Renaissance-Baroque art study, four categories (Clearness/Unclearness, Plane/Recession, Closed form/Open form, Multiplicity/Unity) are applied for the analysis as the architectural issues of Transparency/Concealment, Exhibited/Experienced Depth, Formal/Figural, and Composed harmony/Generated Unity. As a result, MMCA showed the characteristics of the extreme of Modern classic such as transparency, homogenization of space, formalism, and composition of multiple elements. Meanwhile, the study could find various Baroque characteristics from DDP such as separation of indoor and outdoor, phenomenological depth, rule breaking, and generation of figure. The study finally argued that DDP would not be an anti-modern, but try to inherit and overcome the modern architecture to explore different possibilities, and that the similar relationship between Renaissance and Baroque art could be found in these two cases.

INTEROPERABILITY ISSUES IN CROSS-DISCIPLINARY COLLABORATIONS OF IRREGULARLY SHAPED BUILDINGS: THE CASE OF DONGDAEMUN DESIGN PLAZA AND PARK

  • Ohyoon Kwon;Ghang Lee;Seonwoo Kim;Yunah Sin;Jeashik Hwang;Kabsu Chae
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.331-337
    • /
    • 2009
  • This paper summarizes some of approaches that could be taken for data exchange in a non-interoperable work environment and reports lessons learned from the Dongdaemun Design Plaza and Park project. Today's widespread application of building information modeling (BIM) to the construction and architectural design industries requires a change in the cooperation between business organizations and their methods of communication. In particular, the interoperability of information between interdisciplinary organizations, which use specific programs for different purposes, has become a critical issue. More than just a technical problem, it is also highly related to an organization's collaboration culture and the particulars of a specific project. This paper describes the interoperability issue that occurred during the construction documentation phase of the irregularly shaped building project, Dongdaemun Design Plaza and Park, designed by Zaha Hadid Architects and Samoo Architects and Engineers, from the perspective of the technological problem and the collaborative organizations' communications. Although the perfect compatibility of information is not possible, this paper deals with a practical approach to the interoperability issue by examining the way the end-users of computer-aided design (CAD) resolved the interoperability problems in practice.

  • PDF

A study on the BIM Design Process in the Free-form Design Project: -Focused on the Dongdaemun Design Plaza(DDP) Project- (비정형 설계 프로젝트의 BIM설계 프로세스에 대한 연구 : -동대문 디자인 플라자(DDP) 프로젝트를 중심으로-)

  • Ha, Seung-Beom
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.2
    • /
    • pp.473-479
    • /
    • 2020
  • Since the 21st century a free-form building has been noticeably constructed. Now the definition "the monumental architecture is a free-form one." has come to be established. As a free-form building became a landmark of the city and a factor rising a value of the building all around the world, it is currently required to consider a more efficient design process. Therefore this research aims to learn approaches of the lasting free-form design process by considering the design process of Dongdaemun Design Plaza(DDP) designed by 'Zaha Hadid' that is a typical free-form building of Korea and the correlation between the design in the conceptual stage and the BIM(Building Information Modeling) design in practical stage.

A Study on the Cost Estimates for Optimization in the Free-Form Building Facade (비정형 건축물 파사드의 개산견적을 위한 최적화에 관한 연구)

  • Lim, Jang-Sik;Ock, Jong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.133-135
    • /
    • 2013
  • The most difficult process in the construction of free-form buildings is to manufacture and construct exterior panels designed in a complex way. The façade of the free-form buildings include flat-panels, one-way curvature-panels, and bi-directional curvature panels. To construct these forms, it is necessary to go through the process of optimizing. But as for the optimizing technologies, BIM-specializing companies exclusively protect those technologies, so small construction companies have difficulty in rough estimates. Therefore, this study was aimed to provide the basic data in making the rough estimates of free-form buildings by carrying out the optimizing process for the façade of Dongdaemun Design Plaza and conducting the rough estimates according to the stage of production methods and optimization.

  • PDF

Fuzzy Patterns of Economic Valuating on the Architectural Aesthetic - Case Study of Applying the Fuzzy-Contingent Valuation Method to the Dongdaemoon Design Plaza - (건축미의 경제적 가치 퍼지패턴 분석)

  • Lee, Dong-Joo;Ko, Eun-Hyung
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.36 no.3
    • /
    • pp.13-20
    • /
    • 2020
  • The purpose of this study is to analyze the fuzzy pattern that is reflected on the inside of the value evaluator in measuring the economic value of architectural aesthetic using the fuzzy-contingent valuation method. The main results of analyzing the relationship between architectural aesthetic and fuzzy patterns by typing 307 fuzzy patterns collected from visitors at Dongdaemun Design Plaza are as follows: First, low levels of architectural aesthetic can be a primary cause of extreme refusal of payment. However, it was confirmed that the extreme refusal of payment could partially involve mentality of free-ride on public goods or mentality that would not give value to past events that are not future. Second, if the architectural aesthetic score is 77.5, the most perfect form of fuzzy pattern is formed. It is confirmed that the fuzzy form, which is the standard in the relationship between architectural aesthetic and money value, is made at 77.5 points. This means that it is most efficient to have 77.5 points of architectural aesthetic to secure balanced data by membership in the study of architectural aesthetic value measurement through fuzzy pattern. Third, according to the architectural aesthetic score, respondents can be interpreted as follows: no monetary willingness arises before or after 52.4, starts to respond to the amount before and after 65.6, severe conflict over payments around 70.6~71.7, stronger willingness to pay around 77.6, want to pay for sure around 80.0.

Necessity Review of IPD(Integrated Project Delivery) for Free-Form Building in Domestic (비정형건축물의 IPD(Integrated Project Delivery) 도입 필요성 검토)

  • Kim, Sung-Jin;Park, Sung-Jin;Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.308-309
    • /
    • 2014
  • A lot of very complex free-form buildings such as Seoul City Office and DDP(Dongdaemun Design Plaza) have been recently built nowadays in domestic. However, as construction methods and cost data are decided without enough discussion and collaboration with specialized subcontractors during design stage, construction quality problems and cost overrun of the free-form buildings are thus occurred during construction stage. Therefore design system and process or contract and ordering system should be developed participating the specialized subcontractors during design stage in order to perfect the free-form design and construction. Especially US has thus an effort to apply IPD(Integrated Project Delivery) system which can solve the problems of construction quality, productivity decrease and cost overrun by constructing the buildings based on exact drawings and collaboration as well as activating BIM(Building Information Modeling). Therefore this study reviews cases of the free-form buildings in domestic and then presents necessity review of IPD in domestic.

  • PDF

An Analysis and Improvement of Free Form Building's Construction Productivity - Focused on Exposed Concrete Work - (비정형 건축물 공사의 생산성 분석 및 향상방안 - 노출콘크리트 공사를 중심으로 -)

  • Lee, Eun-Young;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.38-46
    • /
    • 2014
  • The Global's top five Design Firms selected from BauNetz a German architectural magazine in 2007 designed free form building design which was 25% of the overall design by 2006-2010. Free form building is a landmark of the city and the country so its social and economic impacts are very large. In case of Korea, free form buildings such as Tribowl in Incheon, KINTEX Exhibition hall 2 and Dongdaemun Design Plaza have increased. However, those the increase in design trends and, the needs due to the lack of free form building design and construction management experience, free form building projects can't be expected to profitability and have a number of problems after completion. Especially, there are many excessive quality problems and the rising cost due to design changes frequently and lack of experience and data. Thus an initial plan regardless of considering of free form building's characteristics can be a huge risk because of the difference with the plan and actual projects, yet there aren't free form building project's performance data and case studies related to productivity. In this study, through selection of low-construction productivity works and an analysis of the work process and productivity data, hope to propose an actual field productivity of free form building and the ways to improve productivity.