This study is to secure more accurate data of the discharge on the measurement by gaining a reliable hydrological data through the comparison the present method of measuring them and the other way that is based ISO. This study suggests the applicable measurement method of the discharge that has reliance through general elements and the analysis of uncertainty by comparing and assaying the data of the Hyung San River that is measured by the present standard. The result of this study makes us realize that we should complement the measurement method of the discharge securing the reliable and accurate hydrological data Hydrological data is very important things to perform domestic river works or install some structure in river or coast. Securing reliable and accurate hydro-data and making a thesis should go on in other to do any construction in river or coast.
In this study, the Dilution Method is used to measure river discharge through the hydraulic model test. the dilution method is divided into Constant-Rate-Infection Method and Slug-Injection Method in the river discharge measurement techniques. When the dilution method is applied in the hydraulic model flume, it is analyzed that the estimated error of constant-rate-injection method is less than that of the slug-in-jection method, and the result shows that floodflow analysis is more efficient than lowflow analysis as compared observed discharge with calculated discharge. The result of statistical error analysis shows that the constant-rate-injection method is appropriate technique for the measurement of the river discharge. Therefore, the dilution method among the river discharge measurement techniques can be applied for the river basin which can't be measured with current meter or unsteady-flow regime in the urban-small drainage or hydraulic structure equipment area and can be obtained more exact results than any other discharge measurement techniques.
The preventive diagnosis technique for power system is being highlighted as a research area for deterioration of insulation in machinery because of high-voltage power system. We make efforts to develop not only diagnosis of aging state but also detection of defects in the initial stage from preventive diagnosis technique. Especially, partial discharge is actively studied as a non-destructive diagnosis technique and very useful because partial discharge measurement reduces damage than conventional diagnosis technique. The loaded stress during this test is smaller than that of other diagnosis techniques. But the continuous research for various complicated analysis method is required because partial discharge has very small signals and its signals have complex forms. In this paper, the measurement of partial discharge was investigated and studied on many specimens with void. We made samples having artificial voids and measured partial discharge. In order to use as a practical diagnosis technique, we studied ways of measurement, measured illustrations and types of partial discharge which could be used in order to diagnose defects of power machinery.
대한원격탐사학회 2002년도 Proceedings of International Symposium on Remote Sensing
/
pp.728-733
/
2002
The measurement of river discharge is among the most fundamental observations and is necessary for understanding many water-related issues, such as flooding hazards, sediment transportation, and nutrient movement. Traditionally river discharge is estimated by measuring the water stage and converting the measurement to discharge using a stage-discharge rating curve. The possibility of monitoring river discharge from satellites has been largely ignored, because it is difficult to measure water surface information from space with sufficient precision. In this paper, an efficient approach to discharge estimation using mainly satellite data is developed and described. The proposed method, which focuses on the measurement of water-surface width coupled with river width-stage and stage-discharge relationships, is applied to the Yangtze River with good results.
In this paper, we discussed measurement method of PD (Partial Discharge) of 22.9[kV] cable. Cable rail track laying portable detector that can detect partial discharge of cable connection ashes by on-line done spot way to detect Lemke equipment and high broadcasting CT sensor that use antenna sensor using ICM mounting was explained. Because measurement corona signal is very big, analysis of partial discharge is difficult state, we used connector. It could be attenuated by 2 times. We found out that corona signal which generated on B phase is flowed on A phase and C phase. It could measure that partial discharge of A phase happens actually. We could confirm that partial discharge of about 250 ${\sim}$ 300 [pC] on A phase is dangerous.
According to request of insulating materials for high-voltage, recently we make effort not only to develop diagnostic skills of aging state but also to discover defects in insulating material in the early. Especially, partial discharge has been actively studied as a non-destructive diagnosis technique and very useful method. Because the method of partial discharge measurement has damages less than other conventional diagnosis technique. In this paper, the characteristics of partial discharge was investigated and studied on many samples with voids. In order to adapt as a practical diagnosis technique, it is studied on the characteristics of partial discharge and insulation breakdown in the high voltage. We suggest that partial discharge measurement can be used in order to diagnose defects in high-voltage insulation materials.
Accuracy of gas flow measurements using sonic nozzle and factors which influence on the discharge coefficients of sonic nozzle are investigated with high pressure gas flow standard measurement system. The gas flow measurement system comprises two compressors, storage tank, temperature control loop, sonic nozzle test section, weighing tank, gyroscopic scale and data acquisition system. The experiments are performed at various nozzle throat diameter and inlet pressure. Overall uncertainty of discharge coefficients is estimated to less than .+-.0.2% and most of experimental data fall into this range. Dependence of discharge coefficients on the Reynolds number is good agreement with those suggested in ISO document. The influence of swirl on the discharge coefficients becomes greater as the nozzle throat diameter is enlarged. The discharge coefficient of conical nozzle shows about 4.5% lower discharge coefficients than those of toroidal nozzle, but variation trend with Reynolds number is very similar each other and reproducibility of data is very good.
In hydro-generator, a groundwall insulation of stator windings gradually deteriorates due to mechanical, thermal, electrical and environmental stresses. These stresses combine to result in loose windings, delamination of the stator insulation and/or electrical tracking of the endwinding, all of which can lead to stator insulation failures. Conventionally, off-line tests such as partial discharge measurement, DC/AC current and .DELTA.tan.delta. tests has been used for estimation of winding condition. However, off-line test requires large power supply and generator outage. In addition, major cause of insulation problems such as loose wedges and slot dischages may not be found with off-line diagnoses. This paper introduces the on-line partial discharge measurement techniques using frequency spectrum analyzer(FSA) for the generator stator windings. The experimental results from the UIAM #1 hydro-generator confirms a optimistic application of on-line generator diagnosis method as a reliable tool for evaluation of winding condition.
The partial discharge has been blown as the chief breakdown of power equipments. The analysis and the recognition is much difficult because the partial discharge signal is very small and has complex aging pattern. Recently, insulation aging diagnosis based on pattern of phase(Ф), partial discharge magnitude(q), number(n) has been very important. Owing to depreciate the reappearance of aging progress at the electrical tree pattern and to be difficult to analyze visually, the study on partial discharge pattern is suggested to normalizing analysis method of partial discharge signals. This parer is purposed on prediction of life-time measurement of cv-cable, on decision of risk degree with normalization and real-time measurement of partial discharge signals for aging diagnosis of cv-cable. As normalizing the aging signals of electrical tree in cv-cable, it is able to confirm risk degree of insulation material with the distribution of Ф-q-n and recognize the process of aging pattern using neural network.
In this study, the simulation of partial discharge pulse waveform have been performed for the typical joints such as EBA and PMJ in the HV underground transmission XLPE cable system in order to improve the understanding of partial discharge pulse waveform and the on-site measurement accuracy of partial discharges. FDTD simulation technique was adopted for the simulation and has been shown to be suitable for partial discharge simulation of power cables in terms of pulse propagation characteristics and waveform formation. The simulation results for the EBA showed that the second not-so-large opposite polarity peak appeared after the first negative polarity peak and the measurement sensitivity was the highest near the bottom of the EBA copper box. In the analysis results for PMJ, the magnitude of the second opposite polarity peak was large enough to compare with the first peak, and the measurement sensitivity at the end of the PMJ copper box was the highest. These simulation results show considerable similarity with the on-site measurement, and it would be very useful for the partial discharge measurement of HV XLPE cable systems.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.