On-line Measurement of Partial Discharge

활선상의 부분방전 측정 방법

  • Published : 2004.07.14

Abstract

In this paper, we discussed measurement method of PD (Partial Discharge) of 22.9[kV] cable. Cable rail track laying portable detector that can detect partial discharge of cable connection ashes by on-line done spot way to detect Lemke equipment and high broadcasting CT sensor that use antenna sensor using ICM mounting was explained. Because measurement corona signal is very big, analysis of partial discharge is difficult state, we used connector. It could be attenuated by 2 times. We found out that corona signal which generated on B phase is flowed on A phase and C phase. It could measure that partial discharge of A phase happens actually. We could confirm that partial discharge of about 250 ${\sim}$ 300 [pC] on A phase is dangerous.